23.03.2014 Views

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 2 / 10<br />

40 Clissold Rd, Wahro<strong>on</strong>ga<br />

Item 2<br />

DA1669/03<br />

18 April <strong>2005</strong><br />

Devices for Work <strong>on</strong> Roads”. If pedestrian circul<strong>at</strong>i<strong>on</strong> is not s<strong>at</strong>isfac<str<strong>on</strong>g>to</str<strong>on</strong>g>rily maintained,<br />

and acti<strong>on</strong> is not taken promptly <str<strong>on</strong>g>to</str<strong>on</strong>g> rectify the defects, Council may undertake<br />

proceedings <str<strong>on</strong>g>to</str<strong>on</strong>g> s<str<strong>on</strong>g>to</str<strong>on</strong>g>p work.<br />

58. Suitable oil separa<str<strong>on</strong>g>to</str<strong>on</strong>g>r units shall <str<strong>on</strong>g>be</str<strong>on</strong>g> provided in the drainage systems <str<strong>on</strong>g>of</str<strong>on</strong>g> basement carparking<br />

areas. These shall <str<strong>on</strong>g>be</str<strong>on</strong>g> designed <str<strong>on</strong>g>to</str<strong>on</strong>g> remove oils and sediment from any w<strong>at</strong>er run<str<strong>on</strong>g>of</str<strong>on</strong>g>f from these<br />

areas prior <str<strong>on</strong>g>to</str<strong>on</strong>g> discharge <str<strong>on</strong>g>to</str<strong>on</strong>g> the main s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er system.<br />

59. To prevent surface s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er from entering the building, the finished habitable ground floor<br />

level(s) <str<strong>on</strong>g>of</str<strong>on</strong>g> the building shall <str<strong>on</strong>g>be</str<strong>on</strong>g> a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> 150mm above adjacent finished ground<br />

level(s). The entire outside perimeter <str<strong>on</strong>g>of</str<strong>on</strong>g> the building must have overland flow escape routes<br />

which will protect all finished floor levels from flooding during times <str<strong>on</strong>g>of</str<strong>on</strong>g> complete subsurface<br />

drainage blockage.<br />

60. Driveways and vehicular access ramps must <str<strong>on</strong>g>be</str<strong>on</strong>g> designed not <str<strong>on</strong>g>to</str<strong>on</strong>g> scrape the underside <str<strong>on</strong>g>of</str<strong>on</strong>g> cars.<br />

In all respects, the proposed vehicle access and accommod<strong>at</strong>i<strong>on</strong> arrangements must <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

designed and c<strong>on</strong>structed <str<strong>on</strong>g>to</str<strong>on</strong>g> comply with Australian Standard AS 2890.1 – “Off-Street car<br />

parking” and the provisi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> St<strong>at</strong>e Envir<strong>on</strong>ment Planning Policy for 'Seniors Living' . The<br />

driveway and circul<strong>at</strong>i<strong>on</strong> aisles must accommod<strong>at</strong>e two-way traffic.<br />

61. A maintenance period <str<strong>on</strong>g>of</str<strong>on</strong>g> six (6) m<strong>on</strong>ths shall apply <str<strong>on</strong>g>to</str<strong>on</strong>g> the work in the public road reserve<br />

carried out by the applicant after works have <str<strong>on</strong>g>be</str<strong>on</strong>g>en completed <str<strong>on</strong>g>to</str<strong>on</strong>g> Council's s<strong>at</strong>isfacti<strong>on</strong>. In th<strong>at</strong><br />

period, the applicant shall <str<strong>on</strong>g>be</str<strong>on</strong>g> liable for any secti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the work which fails <str<strong>on</strong>g>to</str<strong>on</strong>g> perform in the<br />

manner outlined in Council's specific<strong>at</strong>i<strong>on</strong>s, or as would reas<strong>on</strong>ably <str<strong>on</strong>g>be</str<strong>on</strong>g> expected under the<br />

oper<strong>at</strong>ing c<strong>on</strong>diti<strong>on</strong>s.<br />

62. For the purpose <str<strong>on</strong>g>of</str<strong>on</strong>g> any inspecti<strong>on</strong>s by Council engineers, the corresp<strong>on</strong>ding fees set out in<br />

Councils adopted Schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> Fees and Charges are payable <str<strong>on</strong>g>to</str<strong>on</strong>g> Council. A re-inspecti<strong>on</strong> fee<br />

per visit may <str<strong>on</strong>g>be</str<strong>on</strong>g> charged where work is unprepared <strong>at</strong> the requested time <str<strong>on</strong>g>of</str<strong>on</strong>g> inspecti<strong>on</strong>, or<br />

where remedial work is uns<strong>at</strong>isfac<str<strong>on</strong>g>to</str<strong>on</strong>g>ry and a further inspecti<strong>on</strong> is required. Engineering fees<br />

must <str<strong>on</strong>g>be</str<strong>on</strong>g> paid in full prior <str<strong>on</strong>g>to</str<strong>on</strong>g> any final c<strong>on</strong>sent from Council.<br />

63. The Applicant must obtain a Secti<strong>on</strong> 73 Compliance Certific<strong>at</strong>e under the Sydney W<strong>at</strong>er Act<br />

1994. An applic<strong>at</strong>i<strong>on</strong> must <str<strong>on</strong>g>be</str<strong>on</strong>g> made through an authorised W<strong>at</strong>er Servicing Coordina<str<strong>on</strong>g>to</str<strong>on</strong>g>r.<br />

Please refer <str<strong>on</strong>g>to</str<strong>on</strong>g> “Your Business” secti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Sydney W<strong>at</strong>er’s web site <strong>at</strong><br />

www.sydneyw<strong>at</strong>er.com.au then the “e-developer” ic<strong>on</strong> or teleph<strong>on</strong>e 13 20 92. Following<br />

applic<strong>at</strong>i<strong>on</strong> a “Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Requirements” will detail w<strong>at</strong>er and sewer extensi<strong>on</strong>s <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> built and<br />

charges <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> paid. Please make early c<strong>on</strong>tact with the Coordina<str<strong>on</strong>g>to</str<strong>on</strong>g>r, since building <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

w<strong>at</strong>er/sewer extensi<strong>on</strong>s can <str<strong>on</strong>g>be</str<strong>on</strong>g> time c<strong>on</strong>suming and may impact <strong>on</strong> other services and<br />

building, driveway or landscape design.<br />

64. During c<strong>on</strong>structi<strong>on</strong>, s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er run<str<strong>on</strong>g>of</str<strong>on</strong>g>f must <str<strong>on</strong>g>be</str<strong>on</strong>g> disposed in a c<strong>on</strong>trolled manner th<strong>at</strong> is<br />

comp<strong>at</strong>ible with the erosi<strong>on</strong> and sediment c<strong>on</strong>trols <strong>on</strong> the site. Immedi<strong>at</strong>ely up<strong>on</strong> completi<strong>on</strong><br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> any impervious areas <strong>on</strong> the site (including ro<str<strong>on</strong>g>of</str<strong>on</strong>g>s, driveways, paving) and where the final<br />

drainage system is incomplete, the necessary temporary drainage systems shall <str<strong>on</strong>g>be</str<strong>on</strong>g> installed <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

c<strong>on</strong>trol run<str<strong>on</strong>g>of</str<strong>on</strong>g>f as far as the approved point <str<strong>on</strong>g>of</str<strong>on</strong>g> s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er discharge. Such measures shall <str<strong>on</strong>g>be</str<strong>on</strong>g> <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

the s<strong>at</strong>isfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the Principal Certifying Authority (PCA).<br />

N:\0504<strong>26</strong>-OMC-SR-03119-40 CLISSOLD ROAD WAHROONG.doc/cot<str<strong>on</strong>g>to</str<strong>on</strong>g> /10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!