23.03.2014 Views

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 2 / 9<br />

40 Clissold Rd, Wahro<strong>on</strong>ga<br />

Item 2<br />

DA1669/03<br />

18 April <strong>2005</strong><br />

52. For s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er c<strong>on</strong>trol all paved areas are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> drained <str<strong>on</strong>g>to</str<strong>on</strong>g> the main drainage system. This<br />

may require the install<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> suitable cut-<str<strong>on</strong>g>of</str<strong>on</strong>g>f structures, inlets and/or barriers th<strong>at</strong> direct<br />

run<str<strong>on</strong>g>of</str<strong>on</strong>g>f <str<strong>on</strong>g>to</str<strong>on</strong>g> the formal drainage system.<br />

53. S<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er run<str<strong>on</strong>g>of</str<strong>on</strong>g>f from new hard surfaces gener<strong>at</strong>ing run<str<strong>on</strong>g>of</str<strong>on</strong>g>f or landscaped areas th<strong>at</strong> are not<br />

<strong>at</strong> n<strong>at</strong>ural ground level shall <str<strong>on</strong>g>be</str<strong>on</strong>g> piped <str<strong>on</strong>g>to</str<strong>on</strong>g> the street drainage system. New drainage line<br />

c<strong>on</strong>necti<strong>on</strong>s <str<strong>on</strong>g>to</str<strong>on</strong>g> the street system shall c<strong>on</strong>form and comply with the requirements descri<str<strong>on</strong>g>be</str<strong>on</strong>g>d in<br />

secti<strong>on</strong>s 5.3 and 5.4 <str<strong>on</strong>g>of</str<strong>on</strong>g> Councils W<strong>at</strong>er Management Development C<strong>on</strong>trol Plan 47, available<br />

in hard copy <strong>at</strong> Council and <strong>on</strong> the Council website.<br />

54. For s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er c<strong>on</strong>trol, an On-site S<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er Detenti<strong>on</strong> System is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> provided in<br />

accordance with Council’s S<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er Management Manual. An overflow is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

incorpor<strong>at</strong>ed th<strong>at</strong> will direct any excess flow <str<strong>on</strong>g>to</str<strong>on</strong>g> the downstream drainage system and subsoil<br />

drainage is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> provided from the underside <str<strong>on</strong>g>of</str<strong>on</strong>g> the sediment c<strong>on</strong>trol sump <str<strong>on</strong>g>to</str<strong>on</strong>g> the outlet line<br />

or other approved loc<strong>at</strong>i<strong>on</strong>. The system is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> cleaned regularly and maintained <str<strong>on</strong>g>to</str<strong>on</strong>g> the<br />

s<strong>at</strong>isfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Council.<br />

The <strong>on</strong>-site s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er detenti<strong>on</strong> system and property drainage system is not <str<strong>on</strong>g>to</str<strong>on</strong>g> require<br />

excav<strong>at</strong>i<strong>on</strong> or fill underne<strong>at</strong>h the canopy areas <str<strong>on</strong>g>of</str<strong>on</strong>g> any trees <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> retained unless as approved<br />

by a qualified arborist’s certific<strong>at</strong>i<strong>on</strong> th<strong>at</strong> such excav<strong>at</strong>i<strong>on</strong> will not affect the l<strong>on</strong>gevity <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

subject tree(s). All ro<str<strong>on</strong>g>of</str<strong>on</strong>g>, driveway and other hard-surface run<str<strong>on</strong>g>of</str<strong>on</strong>g>f w<strong>at</strong>er is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> intercepted and<br />

directed <str<strong>on</strong>g>to</str<strong>on</strong>g> the <strong>on</strong>-site s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er detenti<strong>on</strong> system. If some areas <str<strong>on</strong>g>of</str<strong>on</strong>g> hard-surface are unable<br />

<str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> directed <str<strong>on</strong>g>to</str<strong>on</strong>g> the detenti<strong>on</strong> system an adjustment <str<strong>on</strong>g>to</str<strong>on</strong>g> the r<strong>at</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> discharge is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> made <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

<strong>at</strong>tain the required site discharge.<br />

55. The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> temporary sediment and erosi<strong>on</strong> c<strong>on</strong>trol facilities and measures are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

installed, prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> any works <strong>on</strong> the site <str<strong>on</strong>g>to</str<strong>on</strong>g> elimin<strong>at</strong>e unnecessary<br />

erosi<strong>on</strong> and loss <str<strong>on</strong>g>of</str<strong>on</strong>g> sediment. These facilities must <str<strong>on</strong>g>be</str<strong>on</strong>g> maintained in working order during<br />

c<strong>on</strong>structi<strong>on</strong> works and up <str<strong>on</strong>g>to</str<strong>on</strong>g> the completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the maintenance period. All sediment traps<br />

must <str<strong>on</strong>g>be</str<strong>on</strong>g> cleared <strong>on</strong> a regular basis and after each major s<str<strong>on</strong>g>to</str<strong>on</strong>g>rm, and/or as directed by the<br />

Principal Certifying Authority and Council <str<strong>on</strong>g>of</str<strong>on</strong>g>ficers.<br />

56. Where required, the adjustment <str<strong>on</strong>g>of</str<strong>on</strong>g> any utility service facilities must <str<strong>on</strong>g>be</str<strong>on</strong>g> carried out by the<br />

applicant and in accordance with the requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> the relevant utility authority. These<br />

works shall <str<strong>on</strong>g>be</str<strong>on</strong>g> <strong>at</strong> no cost <str<strong>on</strong>g>to</str<strong>on</strong>g> Council. It is the Applicants resp<strong>on</strong>sibility <str<strong>on</strong>g>to</str<strong>on</strong>g> ascertain impacts <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

the proposal up<strong>on</strong> utility services and Council accepts no resp<strong>on</strong>sibility for any m<strong>at</strong>ter arising<br />

from its approval <str<strong>on</strong>g>to</str<strong>on</strong>g> this applic<strong>at</strong>i<strong>on</strong> involving an influence up<strong>on</strong> utility services provided by<br />

another authority.<br />

57. All public footways and roadways fr<strong>on</strong>ting and adjacent <str<strong>on</strong>g>to</str<strong>on</strong>g> the site are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> maintained in a<br />

safe c<strong>on</strong>diti<strong>on</strong> <strong>at</strong> all times during the course <str<strong>on</strong>g>of</str<strong>on</strong>g> the development works. A safe pedestrian<br />

circul<strong>at</strong>i<strong>on</strong> route and a pavement/route free <str<strong>on</strong>g>of</str<strong>on</strong>g> trip hazards must <str<strong>on</strong>g>be</str<strong>on</strong>g> maintained <strong>at</strong> all times <strong>on</strong><br />

or adjacent <str<strong>on</strong>g>to</str<strong>on</strong>g> the public access ways fr<strong>on</strong>ting the c<strong>on</strong>structi<strong>on</strong> site. Where public<br />

infrastructure is damaged, repair works must <str<strong>on</strong>g>be</str<strong>on</strong>g> carried out when and as directed by Council<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g>ficers. Where circul<strong>at</strong>i<strong>on</strong> is diverted <strong>on</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> the roadway, clear directi<strong>on</strong>al signage and<br />

protective barricades must <str<strong>on</strong>g>be</str<strong>on</strong>g> installed in accordance with AS1742-3 1996 “Traffic C<strong>on</strong>trol<br />

N:\0504<strong>26</strong>-OMC-SR-03119-40 CLISSOLD ROAD WAHROONG.doc/cot<str<strong>on</strong>g>to</str<strong>on</strong>g> /9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!