Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 2 / 7<br />

40 Clissold Rd, Wahro<strong>on</strong>ga<br />

Item 2<br />

DA1669/03<br />

18 April <strong>2005</strong><br />

.<br />

39. A Tree Preserv<strong>at</strong>i<strong>on</strong> Order exists within the Ku-ring-gai Council area whereby the removal,<br />

lopping or destructi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any tree exceeding 5.0 metres in height or 4.0 metres in canopy<br />

spread (except where exempt as defined under Council’s Tree Preserv<strong>at</strong>i<strong>on</strong> Order) without<br />

prior written c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> Council is prohibited.<br />

Release <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e gives au<str<strong>on</strong>g>to</str<strong>on</strong>g>m<strong>at</strong>ic approval <str<strong>on</strong>g>to</str<strong>on</strong>g> the removal ONLY <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

those trees loc<strong>at</strong>ed <strong>on</strong> the subject property within the footprint <str<strong>on</strong>g>of</str<strong>on</strong>g> a proposed new<br />

building/structure or within 3.0 metres <str<strong>on</strong>g>of</str<strong>on</strong>g> a proposed new dwelling. Where this applic<strong>at</strong>i<strong>on</strong> is<br />

for a building/structure other than a dwelling then ONLY trees within the area <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> occupied<br />

by this building/structure may <str<strong>on</strong>g>be</str<strong>on</strong>g> removed. Other trees SHALL NOT <str<strong>on</strong>g>be</str<strong>on</strong>g> REMOVED or<br />

DAMAGED without an applic<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>be</str<strong>on</strong>g>ing made under Council’s Tree Preserv<strong>at</strong>i<strong>on</strong> Order.<br />

40. Landscape works shall <str<strong>on</strong>g>be</str<strong>on</strong>g> carried out in accordance with Landscape Drawing No L01/1-<br />

R8311 prepared by Michael Siu Landscape Architects Pty Ltd and d<strong>at</strong>ed 12 Dec. 2003 (Rev.<br />

6.12.04) submitted with the Development Applic<strong>at</strong>i<strong>on</strong>, except as amended by the following:<br />

• 44 Pit<str<strong>on</strong>g>to</str<strong>on</strong>g>sporum revolutum (Yellow Pit<str<strong>on</strong>g>to</str<strong>on</strong>g>sporum) shall replace 45 Viburnum tinus<br />

(Viburnum) as screen planting adjacent <str<strong>on</strong>g>to</str<strong>on</strong>g> the southern side boundary <str<strong>on</strong>g>to</str<strong>on</strong>g> ensure the site<br />

supports 50% locally occurring n<strong>at</strong>ive plant c<strong>on</strong>tent.<br />

41. The landscape works shall <str<strong>on</strong>g>be</str<strong>on</strong>g> completed prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> final Certific<strong>at</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> Compliance and<br />

maintained in a s<strong>at</strong>isfac<str<strong>on</strong>g>to</str<strong>on</strong>g>ry c<strong>on</strong>diti<strong>on</strong> <strong>at</strong> all times.<br />

42. The screen planting shall <str<strong>on</strong>g>be</str<strong>on</strong>g> completed prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the final Certific<strong>at</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

Compliance and <str<strong>on</strong>g>be</str<strong>on</strong>g> maintained in a s<strong>at</strong>isfac<str<strong>on</strong>g>to</str<strong>on</strong>g>ry c<strong>on</strong>diti<strong>on</strong> <strong>at</strong> all times.<br />

43. Tree planting <str<strong>on</strong>g>to</str<strong>on</strong>g> s<strong>at</strong>isfy tree retenti<strong>on</strong>/replenishment requirements shall <str<strong>on</strong>g>be</str<strong>on</strong>g> completed prior <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

the issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the final Certific<strong>at</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> Compliance<br />

44. Any imported fill m<strong>at</strong>erial shall <str<strong>on</strong>g>be</str<strong>on</strong>g> restricted <str<strong>on</strong>g>to</str<strong>on</strong>g> m<strong>at</strong>erial from the local soil landscape <strong>on</strong><br />

which the site is loc<strong>at</strong>ed or <str<strong>on</strong>g>be</str<strong>on</strong>g> derived from sands<str<strong>on</strong>g>to</str<strong>on</strong>g>ne geology sites.<br />

45. Excav<strong>at</strong>i<strong>on</strong> for the install<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> CONDUITS/SEWER/STORMWATER/GAS within the<br />

specified radius <str<strong>on</strong>g>of</str<strong>on</strong>g> the trunk/s <str<strong>on</strong>g>of</str<strong>on</strong>g> the following tree/s shall <str<strong>on</strong>g>be</str<strong>on</strong>g> carried out using the thrust<br />

boring method. Thrust boring shall <str<strong>on</strong>g>be</str<strong>on</strong>g> carried out <strong>at</strong> least 600mm <str<strong>on</strong>g>be</str<strong>on</strong>g>ne<strong>at</strong>h n<strong>at</strong>ural ground<br />

surface <strong>at</strong> the tree/s <str<strong>on</strong>g>to</str<strong>on</strong>g> minimise damage <str<strong>on</strong>g>to</str<strong>on</strong>g> tree/s root system. Documentary evidence <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

compliance with this c<strong>on</strong>diti<strong>on</strong> shall <str<strong>on</strong>g>be</str<strong>on</strong>g> submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> Council with the final Certific<strong>at</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

Compliance.<br />

Tree/Loc<strong>at</strong>i<strong>on</strong><br />

Fraxinus syriaca (Syrian Ash)<br />

Adjacent <str<strong>on</strong>g>to</str<strong>on</strong>g> the site’s southern side boundary.<br />

Syncarpia glomulifera (Turpentine)<br />

At the southern end <str<strong>on</strong>g>of</str<strong>on</strong>g> the n<strong>at</strong>ure strip<br />

Radius From Trunk<br />

5m<br />

4m<br />

N:\0504<strong>26</strong>-OMC-SR-03119-40 CLISSOLD ROAD WAHROONG.doc/cot<str<strong>on</strong>g>to</str<strong>on</strong>g> /7