23.03.2014 Views

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 1 / 54<br />

1, 3, and 5 Lynbara Avenue and<br />

12 Porters Lane, St Ives<br />

Item 1 1219/04<br />

1 April <strong>2005</strong><br />

-Council is fully informed when assessing the damage <str<strong>on</strong>g>to</str<strong>on</strong>g> public infrastructure caused as<br />

a result <str<strong>on</strong>g>of</str<strong>on</strong>g> the development, and<br />

-Council is able <str<strong>on</strong>g>to</str<strong>on</strong>g> refund infrastructure damage b<strong>on</strong>ds, in full or parts there<str<strong>on</strong>g>of</str<strong>on</strong>g>, with<br />

accuracy<br />

The developer may <str<strong>on</strong>g>be</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> liable <str<strong>on</strong>g>to</str<strong>on</strong>g> all damage <str<strong>on</strong>g>to</str<strong>on</strong>g> public infrastructure in the vicinity <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

site, where such damage is not accur<strong>at</strong>ely recorded under the requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> this c<strong>on</strong>diti<strong>on</strong><br />

prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> works. In this respect, the infrastructure damage b<strong>on</strong>d lodged<br />

by the subject developer may <str<strong>on</strong>g>be</str<strong>on</strong>g> used by Council <str<strong>on</strong>g>to</str<strong>on</strong>g> repair the damage regardless.<br />

A sec<strong>on</strong>d dilapid<strong>at</strong>i<strong>on</strong> report, recording structural c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> all structures originally<br />

assessed prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> works, must <str<strong>on</strong>g>be</str<strong>on</strong>g> carried out <strong>at</strong> the completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

works and <str<strong>on</strong>g>be</str<strong>on</strong>g> submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> Council.<br />

108. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> any works <strong>on</strong> site the applicant must submit, for review by<br />

Council Engineers, a C<strong>on</strong>structi<strong>on</strong> and Traffic Management Plan. The following m<strong>at</strong>ters must<br />

<str<strong>on</strong>g>be</str<strong>on</strong>g> specifically addressed in the Plan:<br />

1. A plan view <str<strong>on</strong>g>of</str<strong>on</strong>g> the entire site and fr<strong>on</strong>tage roadways indic<strong>at</strong>ing:<br />

- Dedic<strong>at</strong>ed c<strong>on</strong>structi<strong>on</strong> site entrances and exits, c<strong>on</strong>trolled by a certified traffic<br />

c<strong>on</strong>troller, <str<strong>on</strong>g>to</str<strong>on</strong>g> safely manage any pedestrians and c<strong>on</strong>structi<strong>on</strong> rel<strong>at</strong>ed vehicles in the<br />

fr<strong>on</strong>tage roadways,<br />

- Turning areas within the site for c<strong>on</strong>structi<strong>on</strong> and spoil removal vehicles, allowing a<br />

forward egress for all c<strong>on</strong>structi<strong>on</strong> vehicles <strong>on</strong> the site,<br />

- The loc<strong>at</strong>i<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> proposed Work Z<strong>on</strong>es in the fr<strong>on</strong>tage roadways,<br />

- Loc<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any proposed crane standing areas<br />

- A dedic<strong>at</strong>ed unloading and loading point within the site for all c<strong>on</strong>structi<strong>on</strong> vehicles,<br />

plant and deliveries<br />

- M<strong>at</strong>erial, plant and spoil bin s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage areas within the site, where all m<strong>at</strong>erials are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

dropped <str<strong>on</strong>g>of</str<strong>on</strong>g>f and collected.<br />

- The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> an <strong>on</strong>-site parking area for employees, tradespers<strong>on</strong> and c<strong>on</strong>structi<strong>on</strong><br />

vehicles where possible<br />

2. Traffic C<strong>on</strong>trol Plan(s) for the site<br />

- All traffic c<strong>on</strong>trol devices installed in the road reserve must <str<strong>on</strong>g>be</str<strong>on</strong>g> in accordance with the<br />

RTA public<strong>at</strong>i<strong>on</strong> “Traffic C<strong>on</strong>trol Worksite Manual” and designed by a pers<strong>on</strong> licensed<br />

<str<strong>on</strong>g>to</str<strong>on</strong>g> do so (minimum RTA ‘red card’ qualific<strong>at</strong>i<strong>on</strong>). The main stages <str<strong>on</strong>g>of</str<strong>on</strong>g> the development<br />

requiring specific c<strong>on</strong>structi<strong>on</strong> management measures are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> identified and specific<br />

traffic c<strong>on</strong>trol measures identified for each.<br />

- Approval is <str<strong>on</strong>g>to</str<strong>on</strong>g> obtained from Ku-ring-gai Council for any temporary road closures or<br />

crane use from public property.<br />

3. A detailed descripti<strong>on</strong> and route map <str<strong>on</strong>g>of</str<strong>on</strong>g> the proposed route for vehicles involved in<br />

spoil removal, m<strong>at</strong>erial delivery and machine flo<strong>at</strong>age must <str<strong>on</strong>g>be</str<strong>on</strong>g> provided.<br />

- Light traffic roads and those subject <str<strong>on</strong>g>to</str<strong>on</strong>g> a load or height limit must <str<strong>on</strong>g>be</str<strong>on</strong>g> avoided <strong>at</strong> all<br />

times.<br />

- A copy <str<strong>on</strong>g>of</str<strong>on</strong>g> this route is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> made available <str<strong>on</strong>g>to</str<strong>on</strong>g> all c<strong>on</strong>trac<str<strong>on</strong>g>to</str<strong>on</strong>g>rs, and shall <str<strong>on</strong>g>be</str<strong>on</strong>g> clearly<br />

depicted <strong>at</strong> a loc<strong>at</strong>i<strong>on</strong> within the site.<br />

In additi<strong>on</strong>, the plan must address:<br />

N:\0504<strong>26</strong>-OMC-PR-03117-1 3 AND 5 LYNBARA AVENUE.doc/ssegall/54