23.03.2014 Views

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 1 / 50<br />

1, 3, and 5 Lynbara Avenue and<br />

12 Porters Lane, St Ives<br />

Item 1 1219/04<br />

1 April <strong>2005</strong><br />

may affect these. Approval <str<strong>on</strong>g>of</str<strong>on</strong>g> this Development Applic<strong>at</strong>i<strong>on</strong> is for works wholly within<br />

the property. DA c<strong>on</strong>sent does not imply approval <str<strong>on</strong>g>of</str<strong>on</strong>g> footp<strong>at</strong>h or driveway levels,<br />

m<strong>at</strong>erials or loc<strong>at</strong>i<strong>on</strong> within the road reserve regardless <str<strong>on</strong>g>of</str<strong>on</strong>g> whether this inform<strong>at</strong>i<strong>on</strong> is<br />

shown <strong>on</strong> the applic<strong>at</strong>i<strong>on</strong> documents. The c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> footp<strong>at</strong>hs and driveways outside<br />

the property, in m<strong>at</strong>erials other than those approved by Council, is not permitted and Council<br />

may require immedi<strong>at</strong>e removal <str<strong>on</strong>g>of</str<strong>on</strong>g> unauthorised install<strong>at</strong>i<strong>on</strong>s. When completing the request<br />

for driveway levels applic<strong>at</strong>i<strong>on</strong> from Council, the applicant must <strong>at</strong>tach a copy <str<strong>on</strong>g>of</str<strong>on</strong>g> the relevant<br />

Development Applic<strong>at</strong>i<strong>on</strong> drawing which indic<strong>at</strong>es the positi<strong>on</strong> and proposed level <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

proposed driveway <strong>at</strong> the boundary alignment. Failure <str<strong>on</strong>g>to</str<strong>on</strong>g> submit this inform<strong>at</strong>i<strong>on</strong> may delay<br />

processing.<br />

91. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e the applicant shall submit, for approval by the<br />

Principal Certifying Authority (PCA), a Soil and Erosi<strong>on</strong> C<strong>on</strong>trol Plan prepared in accordance<br />

with the LANDCOM document “Soils and C<strong>on</strong>structi<strong>on</strong>” (2004 ). A suitably qualified and<br />

experienced civil/envir<strong>on</strong>mental engineer or surveyor shall prepare this plan in accordance<br />

with the above guidelines and secti<strong>on</strong> 8.2.1 <str<strong>on</strong>g>of</str<strong>on</strong>g> Councils W<strong>at</strong>er Management DCP 47<br />

(available <strong>on</strong> the Council website).<br />

92. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e the applicant shall submit, for approval by the<br />

Principal Certifying Authority (PCA), full c<strong>on</strong>structi<strong>on</strong> drawings for the proposed method <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

achieving Council s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage volume requirements for an <strong>on</strong>-site s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er detenti<strong>on</strong>/retenti<strong>on</strong><br />

system. The s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage volumes and design shall comply with Councils W<strong>at</strong>er Management DCP<br />

47 ( available <strong>on</strong> the Council website and <strong>at</strong> Council cus<str<strong>on</strong>g>to</str<strong>on</strong>g>mer services), the manufacturers’<br />

specific<strong>at</strong>i<strong>on</strong>s and the relevant plumbing codes. In this respect, the submitted DA c<strong>on</strong>cept<br />

s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er services plans (refer plans C00 <str<strong>on</strong>g>to</str<strong>on</strong>g> C01 by MPN , d<strong>at</strong>ed 2/11/04) must <str<strong>on</strong>g>be</str<strong>on</strong>g> revised<br />

as follows:<br />

- The minimum rainw<strong>at</strong>er tank(s) volume provided <strong>on</strong> site shall <str<strong>on</strong>g>be</str<strong>on</strong>g> increased <str<strong>on</strong>g>to</str<strong>on</strong>g> 147m 3 (not<br />

83.6 m 3 ) as specified in secti<strong>on</strong> 6.4 <str<strong>on</strong>g>of</str<strong>on</strong>g> W<strong>at</strong>er Management DCP 47 and the plans are <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

<str<strong>on</strong>g>be</str<strong>on</strong>g> advanced as necessary for c<strong>on</strong>structi<strong>on</strong> issue purposes.<br />

Rainw<strong>at</strong>er tank(s) shall <str<strong>on</strong>g>be</str<strong>on</strong>g> designed <str<strong>on</strong>g>to</str<strong>on</strong>g> capture and retain run<str<strong>on</strong>g>of</str<strong>on</strong>g>f from the entire ro<str<strong>on</strong>g>of</str<strong>on</strong>g> area as a<br />

minimum. Overflow shall revert <str<strong>on</strong>g>to</str<strong>on</strong>g> the main drainage system. The design and c<strong>on</strong>structi<strong>on</strong><br />

plans, with all supporting document<strong>at</strong>i<strong>on</strong>, are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> prepared by a qualified and experienced<br />

civil/hydraulic engineer.<br />

93. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e the applicant shall submit, for approval by the<br />

Principal Certifying Authority (PCA), c<strong>on</strong>structi<strong>on</strong> details for the proposed method <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

achieving Council requirements for the manda<str<strong>on</strong>g>to</str<strong>on</strong>g>ry re-use <str<strong>on</strong>g>of</str<strong>on</strong>g> w<strong>at</strong>er <strong>on</strong> the property including<br />

general garden irrig<strong>at</strong>i<strong>on</strong>, carwashing, laundry and <str<strong>on</strong>g>to</str<strong>on</strong>g>ilet flushing within each unit. The<br />

necessary plumbing comp<strong>on</strong>ents for re-use shall <str<strong>on</strong>g>be</str<strong>on</strong>g> shown <strong>on</strong> this design <str<strong>on</strong>g>to</str<strong>on</strong>g> a detail suitable<br />

for install<strong>at</strong>i<strong>on</strong> by the plumbing c<strong>on</strong>trac<str<strong>on</strong>g>to</str<strong>on</strong>g>r. The plans, with all supporting document<strong>at</strong>i<strong>on</strong>, are<br />

<str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> prepared by a qualified and experienced civil/hydraulic engineer.<br />

94. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e the applicant shall submit, for approval by the<br />

Principal Certifying Authority (PCA), c<strong>on</strong>structi<strong>on</strong> design drawings and calcul<strong>at</strong>i<strong>on</strong>s for the<br />

property drainage system comp<strong>on</strong>ents. The property drainage system (including but not<br />

limited <str<strong>on</strong>g>to</str<strong>on</strong>g> gutters, downpipes, pits, joints, flushing facilities and all ancillary plumbing) shall<br />

N:\0504<strong>26</strong>-OMC-PR-03117-1 3 AND 5 LYNBARA AVENUE.doc/ssegall/50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!