23.03.2014 Views

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 1 / 49<br />

1, 3, and 5 Lynbara Avenue and<br />

12 Porters Lane, St Ives<br />

Item 1 1219/04<br />

1 April <strong>2005</strong><br />

89. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e, the Applicant must submit engineering plans for<br />

the following works in the Road Reserve.<br />

C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a fully new c<strong>on</strong>crete footp<strong>at</strong>h, 1.2 metres wide, over the full site fr<strong>on</strong>tage in<br />

Porters Lane and Lynbara Ave.<br />

Development C<strong>on</strong>sent under the EP&A Act does NOT give approval <str<strong>on</strong>g>to</str<strong>on</strong>g> these works <strong>on</strong><br />

Council property. THE APPLICANT MUST OBTAIN A SEPARATE APPROVAL<br />

UNDER SECTION 138 AND 139 OF THE ROADS ACT 1993 for the works in the Public<br />

Road, required by this c<strong>on</strong>diti<strong>on</strong>. The C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e must not <str<strong>on</strong>g>be</str<strong>on</strong>g> issued, and these<br />

works must not proceed, until Council has issued a formal written c<strong>on</strong>sent under the Roads<br />

Act 1993.<br />

To obtain c<strong>on</strong>sent under the Roads Act 1993 for the infrastructure works <strong>on</strong> Council property,<br />

full engineering drawings (plans, secti<strong>on</strong>s and elev<strong>at</strong>i<strong>on</strong>s) and specific<strong>at</strong>i<strong>on</strong>s for the<br />

infrastructure works are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> prepared by a suitably qualified and experienced c<strong>on</strong>sulting<br />

civil engineer. These must <str<strong>on</strong>g>be</str<strong>on</strong>g> submitted and approved by Council prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e. C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the works must proceed in accordance with any<br />

c<strong>on</strong>diti<strong>on</strong>s <strong>at</strong>tached <str<strong>on</strong>g>to</str<strong>on</strong>g> the Council Roads Act 1993 approval.<br />

All works are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> designed in accordance with Council’s “Specific<strong>at</strong>i<strong>on</strong> for Road and<br />

Drainage Works”. In additi<strong>on</strong>, the drawings must detail existing services and trees affected by<br />

the works, erosi<strong>on</strong> c<strong>on</strong>trol requirements and traffic management requirements during the<br />

course <str<strong>on</strong>g>of</str<strong>on</strong>g> works. Traffic management is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> certified <strong>on</strong> the drawings as <str<strong>on</strong>g>be</str<strong>on</strong>g>ing in<br />

accordance with the documents SAA HB81.1 – 1996 – Field Guide for Traffic C<strong>on</strong>trol <strong>at</strong><br />

Works <strong>on</strong> Roads – Part 1 and RTA Traffic C<strong>on</strong>trol <strong>at</strong> Work Sites (1998).<br />

A minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> three (3) weeks will <str<strong>on</strong>g>be</str<strong>on</strong>g> required for assessment <str<strong>on</strong>g>of</str<strong>on</strong>g> Roads Act submissi<strong>on</strong>s.<br />

Early submissi<strong>on</strong> is highly recommended <str<strong>on</strong>g>to</str<strong>on</strong>g> avoid delays in obtaining a C<strong>on</strong>structi<strong>on</strong><br />

Certific<strong>at</strong>e. An engineering assessment fee (set out in Council’s adopted fees and charges) is<br />

payable and Council will withhold any c<strong>on</strong>sent and approved plans until full payment <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

correct fees. Plans and specific<strong>at</strong>i<strong>on</strong>s must <str<strong>on</strong>g>be</str<strong>on</strong>g> marked <str<strong>on</strong>g>to</str<strong>on</strong>g> the <strong>at</strong>tenti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Council’s<br />

Development Engineers. In additi<strong>on</strong>, a copy <str<strong>on</strong>g>of</str<strong>on</strong>g> this c<strong>on</strong>diti<strong>on</strong> must <str<strong>on</strong>g>be</str<strong>on</strong>g> provided, <str<strong>on</strong>g>to</str<strong>on</strong>g>gether with<br />

a covering letter st<strong>at</strong>ing the full address <str<strong>on</strong>g>of</str<strong>on</strong>g> the property and the accompanying DA num<str<strong>on</strong>g>be</str<strong>on</strong>g>r.<br />

90. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e, footp<strong>at</strong>h and driveway levels for the required<br />

driveway crossings <str<strong>on</strong>g>be</str<strong>on</strong>g>tween the property boundary and road alignment must <str<strong>on</strong>g>be</str<strong>on</strong>g> obtained from<br />

Council. Such levels are <strong>on</strong>ly able <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> issued by Council under the Roads Act 1993. All<br />

footp<strong>at</strong>h crossings, laybacks and driveways are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> c<strong>on</strong>structed according <str<strong>on</strong>g>to</str<strong>on</strong>g> Council's<br />

specific<strong>at</strong>i<strong>on</strong>s "C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Gutter Crossings and Footp<strong>at</strong>h Crossings" or as specified by<br />

Council. These are issued with alignment levels after completing the necessary applic<strong>at</strong>i<strong>on</strong><br />

form <strong>at</strong> Cus<str<strong>on</strong>g>to</str<strong>on</strong>g>mer Services and payment <str<strong>on</strong>g>of</str<strong>on</strong>g> the adopted fee.<br />

The grading <str<strong>on</strong>g>of</str<strong>on</strong>g> such footp<strong>at</strong>hs or driveways outside the property shall comply with Council's<br />

standard requirements. The suitability <str<strong>on</strong>g>of</str<strong>on</strong>g> the grade <str<strong>on</strong>g>of</str<strong>on</strong>g> such p<strong>at</strong>hs or driveways inside the<br />

property is the sole resp<strong>on</strong>sibility <str<strong>on</strong>g>of</str<strong>on</strong>g> the applicant and the alignment levels fixed by Council<br />

N:\0504<strong>26</strong>-OMC-PR-03117-1 3 AND 5 LYNBARA AVENUE.doc/ssegall/49