Ordinary Meeting ong>ofong> Council - 26 April 2005 21 / 57 26 ong>toong> 30 Marian Street, Killara Item 21 DA1243/04 18 April 2005 No.16 Cedrus deodar (Himalayan Cedar) 4.0m Adjacent ong>toong> southern site boundary No.15 Cedrus deodar (Himalayan Cedar) 4.0m Adjacent ong>toong> southern site boundary No.4 Agonis flexuosa (Weeping Myrtle) 4.0m Adjacent ong>toong> southern site boundary in neighbouring property No.3 Melaleuca bracteata (White Cloud Tree) 3.0m Adjacent ong>toong> southern site boundary No.2 Tibouchina lepidota ‘Alsonville’ 3.0m Adjacent ong>toong> southern site boundary No.1 Magnolia soulangeana (Soul’s magnoloia) 3.0m Adjacent ong>toong> southern site corner No.33 Cornus florida (Dogwood) 4.0m Adjacent ong>toong> south east site corner 106. To preserve the following tree/s, no work shall commence until the area ong>beong>neath the canopy ong>ofong> the following tree/s excluding that area ong>ofong> the existing pedestrian footpath and roadway shall ong>beong> fenced ong>ofong>f for the specified radius from the trunk ong>toong> prevent any activities, song>toong>rage or the disposal ong>ofong> materials within the fenced area. The fence/s shall ong>beong> maintained intact until the completion ong>ofong> all demolition/building work on site: Tree/Location Radius From Trunk No.’s 31, 32, 6 Eucalyptus saligna (Bluegum) 8.0m Adjacent ong>toong> the Marian St/Northern site frontage 107. The tree protection fence shall ong>beong> constructed ong>ofong> galvanised pipe at 2.4 metre spacings and connected by securely attached chain mesh fencing ong>toong> a minimum height ong>ofong> 1.8 metres prior ong>toong> work commencing. 108. Upon completion ong>ofong> the installation ong>ofong> the required tree protection measures you are required ong>toong> contact the principal certifying authority ong>toong> arrange an inspection ong>ofong> the site. Following the carrying out ong>ofong> a satisfacong>toong>ry inspection and subject ong>toong> the payment ong>ofong> all relevant monies and compliance with any other conditions ong>ofong> approval, work may commence. 109. Prior ong>toong> the commencement ong>ofong> any works on site the applicant shall submit ong>toong> Council a full dilapidation report on the visible (including phoong>toong>s) and structural condition ong>ofong> the following public infrastructure: N:\050426-OMC-PR-03129-26 TO 30 MARIAN STREET KI.doc/pseitz/57

Ordinary Meeting ong>ofong> Council - 26 April 2005 21 / 58 26 ong>toong> 30 Marian Street, Killara Item 21 DA1243/04 18 April 2005 a) Full road pavement width, including kerb and gutter, ong>ofong> Marian Street and Caithness Street over the site frontage, including the full intersection. b) All driveway crossings and laybacks opposite the subject site. The report must ong>beong> completed by a consulting structural/civil engineer. Particular attention must ong>beong> paid ong>toong> accurately recording (both via phoong>toong> and in written format) existing damaged areas on the aforementioned infrastructure so that: − − Council is fully informed when assessing any damage ong>toong> public infrastructure caused as a result ong>ofong> the development, and Council is able ong>toong> refund infrastructure damage bonds, in full or parts thereong>ofong>, with accuracy. The developer may ong>beong> ong>heldong> liable ong>toong> all damage ong>toong> public infrastructure in the vicinity ong>ofong> the site, where such damage is not accurately recorded under the requirements ong>ofong> this condition prior ong>toong> the commencement ong>ofong> works. In this respect, the infrastructure damage bond lodged by the subject developer may ong>beong> used by Council ong>toong> repair the damage regardless. A second dilapidation report, recording structural conditions ong>ofong> all structures originally assessed prior ong>toong> the commencement ong>ofong> works, must ong>beong> carried out at the completion ong>ofong> the works and ong>beong> submitted ong>toong> Council. 110. Prior ong>toong> the commencement ong>ofong> any works on site the applicant must submit, for review by Council Engineers, a Construction and Traffic Management Plan. The following matters must ong>beong> specifically addressed in the Plan: 1. A plan view ong>ofong> the entire site and frontage roadways indicating: − − − − − − − Dedicated construction site entrances and exits, controlled by a certified traffic controller, ong>toong> safely manage any pedestrians and construction related vehicles in the frontage roadways, Turning areas within the site for construction and spoil removal vehicles, allowing a forward egress for all construction vehicles on the site, The locations ong>ofong> any Work Zones in the frontage roadways, Location ong>ofong> proposed crane standing areas A dedicated unloading and loading point within the site for all construction vehicles, plant and deliveries Material, plant and spoil bin song>toong>rage areas within the site, where all materials are ong>toong> ong>beong> dropped ong>ofong>f and collected. The provision ong>ofong> an on-site parking area for employees, tradesperson and construction vehicles where possible 2. Traffic Control Plan(s) for the site − All traffic control devices installed in the road reserve must ong>beong> in accordance with the RTA publication “Traffic Control Worksite Manual” and designed by a person N:\050426-OMC-PR-03129-26 TO 30 MARIAN STREET KI.doc/pseitz/58

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 21 / 58<br />

<strong>26</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> 30 Marian Street, Killara<br />

Item 21<br />

DA1243/04<br />

18 April <strong>2005</strong><br />

a) Full road pavement width, including kerb and gutter, <str<strong>on</strong>g>of</str<strong>on</strong>g> Marian Street and Caithness<br />

Street over the site fr<strong>on</strong>tage, including the full intersecti<strong>on</strong>.<br />

b) All driveway crossings and laybacks opposite the subject site.<br />

The report must <str<strong>on</strong>g>be</str<strong>on</strong>g> completed by a c<strong>on</strong>sulting structural/civil engineer. Particular <strong>at</strong>tenti<strong>on</strong><br />

must <str<strong>on</strong>g>be</str<strong>on</strong>g> paid <str<strong>on</strong>g>to</str<strong>on</strong>g> accur<strong>at</strong>ely recording (both via pho<str<strong>on</strong>g>to</str<strong>on</strong>g> and in written form<strong>at</strong>) existing damaged<br />

areas <strong>on</strong> the aforementi<strong>on</strong>ed infrastructure so th<strong>at</strong>:<br />

−<br />

−<br />

Council is fully informed when assessing any damage <str<strong>on</strong>g>to</str<strong>on</strong>g> public infrastructure caused as<br />

a result <str<strong>on</strong>g>of</str<strong>on</strong>g> the development, and<br />

Council is able <str<strong>on</strong>g>to</str<strong>on</strong>g> refund infrastructure damage b<strong>on</strong>ds, in full or parts there<str<strong>on</strong>g>of</str<strong>on</strong>g>, with<br />

accuracy.<br />

The developer may <str<strong>on</strong>g>be</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> liable <str<strong>on</strong>g>to</str<strong>on</strong>g> all damage <str<strong>on</strong>g>to</str<strong>on</strong>g> public infrastructure in the vicinity <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

site, where such damage is not accur<strong>at</strong>ely recorded under the requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> this c<strong>on</strong>diti<strong>on</strong><br />

prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> works. In this respect, the infrastructure damage b<strong>on</strong>d lodged<br />

by the subject developer may <str<strong>on</strong>g>be</str<strong>on</strong>g> used by Council <str<strong>on</strong>g>to</str<strong>on</strong>g> repair the damage regardless.<br />

A sec<strong>on</strong>d dilapid<strong>at</strong>i<strong>on</strong> report, recording structural c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> all structures originally<br />

assessed prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> works, must <str<strong>on</strong>g>be</str<strong>on</strong>g> carried out <strong>at</strong> the completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

works and <str<strong>on</strong>g>be</str<strong>on</strong>g> submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> Council.<br />

110. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> any works <strong>on</strong> site the applicant must submit, for review by<br />

Council Engineers, a C<strong>on</strong>structi<strong>on</strong> and Traffic Management Plan. The following m<strong>at</strong>ters must<br />

<str<strong>on</strong>g>be</str<strong>on</strong>g> specifically addressed in the Plan:<br />

1. A plan view <str<strong>on</strong>g>of</str<strong>on</strong>g> the entire site and fr<strong>on</strong>tage roadways indic<strong>at</strong>ing:<br />

−<br />

−<br />

−<br />

−<br />

−<br />

−<br />

−<br />

Dedic<strong>at</strong>ed c<strong>on</strong>structi<strong>on</strong> site entrances and exits, c<strong>on</strong>trolled by a certified traffic<br />

c<strong>on</strong>troller, <str<strong>on</strong>g>to</str<strong>on</strong>g> safely manage any pedestrians and c<strong>on</strong>structi<strong>on</strong> rel<strong>at</strong>ed vehicles in<br />

the fr<strong>on</strong>tage roadways,<br />

Turning areas within the site for c<strong>on</strong>structi<strong>on</strong> and spoil removal vehicles, allowing<br />

a forward egress for all c<strong>on</strong>structi<strong>on</strong> vehicles <strong>on</strong> the site,<br />

The loc<strong>at</strong>i<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> any Work Z<strong>on</strong>es in the fr<strong>on</strong>tage roadways,<br />

Loc<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> proposed crane standing areas<br />

A dedic<strong>at</strong>ed unloading and loading point within the site for all c<strong>on</strong>structi<strong>on</strong><br />

vehicles, plant and deliveries<br />

M<strong>at</strong>erial, plant and spoil bin s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage areas within the site, where all m<strong>at</strong>erials are<br />

<str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> dropped <str<strong>on</strong>g>of</str<strong>on</strong>g>f and collected.<br />

The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> an <strong>on</strong>-site parking area for employees, tradespers<strong>on</strong> and<br />

c<strong>on</strong>structi<strong>on</strong> vehicles where possible<br />

2. Traffic C<strong>on</strong>trol Plan(s) for the site<br />

−<br />

All traffic c<strong>on</strong>trol devices installed in the road reserve must <str<strong>on</strong>g>be</str<strong>on</strong>g> in accordance with<br />

the RTA public<strong>at</strong>i<strong>on</strong> “Traffic C<strong>on</strong>trol Worksite Manual” and designed by a pers<strong>on</strong><br />