Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 21 / 52<br />

<strong>26</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> 30 Marian Street, Killara<br />

Item 21<br />

DA1243/04<br />

18 April <strong>2005</strong><br />

−<br />

−<br />

A fully new in-ground piped drainage system in Marian Street and Caithness Street,<br />

comprising inlet/juncti<strong>on</strong> pits and Reinforced c<strong>on</strong>crete piping <str<strong>on</strong>g>of</str<strong>on</strong>g> nominal 750mm<br />

diameter, <strong>at</strong> suitable alignment <str<strong>on</strong>g>to</str<strong>on</strong>g> avoid damage <str<strong>on</strong>g>to</str<strong>on</strong>g> significant trees and accommod<strong>at</strong>e<br />

existing services. This drainage line is <str<strong>on</strong>g>to</str<strong>on</strong>g> replace the Council drainage system which<br />

currently traverses the subject site.<br />

C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a fully new c<strong>on</strong>crete footp<strong>at</strong>h, minimum1.2 metres wide or as directed,<br />

over the full site fr<strong>on</strong>tage <strong>on</strong> Caithness Street.<br />

Development C<strong>on</strong>sent under the EP&A Act does NOT give approval <str<strong>on</strong>g>to</str<strong>on</strong>g> these works <strong>on</strong><br />

Council property. THE APPLICANT MUST OBTAIN A SEPARATE APPROVAL<br />

UNDER SECTION 138 AND 139 OF THE ROADS ACT 1993 for the works in the Road<br />

Reserve, required by this c<strong>on</strong>sent. The C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e must not <str<strong>on</strong>g>be</str<strong>on</strong>g> issued, and these<br />

works must not proceed, until Council has issued a formal written c<strong>on</strong>sent under the Roads<br />

Act 1993. C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the works must proceed in accordance with any c<strong>on</strong>diti<strong>on</strong>s <strong>at</strong>tached<br />

<str<strong>on</strong>g>to</str<strong>on</strong>g> the Council Roads Act 1993 approval. All works are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> designed in accordance with the<br />

General Specific<strong>at</strong>i<strong>on</strong> for the C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Road and Drainage Works in Ku-ring-gai<br />

Council, d<strong>at</strong>ed Novem<str<strong>on</strong>g>be</str<strong>on</strong>g>r 2004 and Council W<strong>at</strong>er Management DCP 47, chapter 9. The<br />

drawings must detail existing services and trees affected by the works, erosi<strong>on</strong> c<strong>on</strong>trol<br />

requirements and traffic management requirements during the course <str<strong>on</strong>g>of</str<strong>on</strong>g> works. Traffic<br />

management is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> certified <strong>on</strong> the drawings as <str<strong>on</strong>g>be</str<strong>on</strong>g>ing in accordance with the documents<br />

SAA HB81.1 – 1996 – Field Guide for Traffic C<strong>on</strong>trol <strong>at</strong> Works <strong>on</strong> Roads – Part 1 and RTA<br />

Traffic C<strong>on</strong>trol <strong>at</strong> Work Sites (1998).<br />

A minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> three (3) weeks will <str<strong>on</strong>g>be</str<strong>on</strong>g> required for assessment <str<strong>on</strong>g>of</str<strong>on</strong>g> Roads Act submissi<strong>on</strong>s.<br />

Early submissi<strong>on</strong> is highly recommended <str<strong>on</strong>g>to</str<strong>on</strong>g> avoid delays in obtaining a C<strong>on</strong>structi<strong>on</strong><br />

Certific<strong>at</strong>e. An engineering assessment and inspecti<strong>on</strong> fee (set out in Council’s adopted fees<br />

and charges) is payable and Council will withhold any c<strong>on</strong>sent and approved plans until full<br />

payment <str<strong>on</strong>g>of</str<strong>on</strong>g> the correct fees. Plans and specific<strong>at</strong>i<strong>on</strong>s must <str<strong>on</strong>g>be</str<strong>on</strong>g> marked <str<strong>on</strong>g>to</str<strong>on</strong>g> the <strong>at</strong>tenti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

Council’s Development Engineers. In additi<strong>on</strong>, a copy <str<strong>on</strong>g>of</str<strong>on</strong>g> this c<strong>on</strong>diti<strong>on</strong> must <str<strong>on</strong>g>be</str<strong>on</strong>g> provided,<br />

<str<strong>on</strong>g>to</str<strong>on</strong>g>gether with a covering letter st<strong>at</strong>ing the full address <str<strong>on</strong>g>of</str<strong>on</strong>g> the property and the accompanying<br />

DA num<str<strong>on</strong>g>be</str<strong>on</strong>g>r.<br />

89. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e, the approved drainage works must <str<strong>on</strong>g>be</str<strong>on</strong>g> completed<br />

in the road reserve, in accordance with the Council approved Roads Act 1993 drawings,<br />

c<strong>on</strong>diti<strong>on</strong>s and specific<strong>at</strong>i<strong>on</strong>s. The works must <str<strong>on</strong>g>be</str<strong>on</strong>g> supervised by the applicant’s designing<br />

engineer and the works shall <str<strong>on</strong>g>be</str<strong>on</strong>g> completed and approved in full <str<strong>on</strong>g>to</str<strong>on</strong>g> the s<strong>at</strong>isfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

Council’s Engineers. The supervising c<strong>on</strong>sulting engineer is <str<strong>on</strong>g>to</str<strong>on</strong>g> provide certific<strong>at</strong>i<strong>on</strong> up<strong>on</strong><br />

completi<strong>on</strong> th<strong>at</strong> the works were c<strong>on</strong>structed in accordance with the Council approved<br />

drawings. The works are also <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> subject <str<strong>on</strong>g>to</str<strong>on</strong>g> inspecti<strong>on</strong> by Council <strong>at</strong> the hold points noted<br />

<strong>on</strong> the approved drawings. Any c<strong>on</strong>diti<strong>on</strong>s <strong>at</strong>tached <str<strong>on</strong>g>to</str<strong>on</strong>g> the approved drawings for these works<br />

must <str<strong>on</strong>g>be</str<strong>on</strong>g> met in full. At the completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> these works the existing Council drainage line<br />

traversing the subject site must <str<strong>on</strong>g>be</str<strong>on</strong>g> decommissi<strong>on</strong>ed. A letter from Ku-ring-gai Council st<strong>at</strong>ing<br />

th<strong>at</strong> the works have <str<strong>on</strong>g>be</str<strong>on</strong>g>en completed in full and this c<strong>on</strong>diti<strong>on</strong> has <str<strong>on</strong>g>be</str<strong>on</strong>g>en s<strong>at</strong>isfied must <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> the Principal Certifying Authority prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> any C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e.<br />

N:\0504<strong>26</strong>-OMC-PR-03129-<strong>26</strong> TO 30 MARIAN STREET KI.doc/pseitz/52