23.03.2014 Views

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 21 / 38<br />

<strong>26</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> 30 Marian Street, Killara<br />

Item 21<br />

DA1243/04<br />

18 April <strong>2005</strong><br />

All excav<strong>at</strong>i<strong>on</strong>s associ<strong>at</strong>ed with the erecti<strong>on</strong> or demoliti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a building must <str<strong>on</strong>g>be</str<strong>on</strong>g> properly<br />

guarded and protected <str<strong>on</strong>g>to</str<strong>on</strong>g> prevent them from <str<strong>on</strong>g>be</str<strong>on</strong>g>ing dangerous <str<strong>on</strong>g>to</str<strong>on</strong>g> life or property.<br />

14. If an excav<strong>at</strong>i<strong>on</strong> associ<strong>at</strong>ed with the erecti<strong>on</strong> or demoliti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a building extends <str<strong>on</strong>g>be</str<strong>on</strong>g>low the<br />

level <str<strong>on</strong>g>of</str<strong>on</strong>g> the base <str<strong>on</strong>g>of</str<strong>on</strong>g> the footings <str<strong>on</strong>g>of</str<strong>on</strong>g> a building <strong>on</strong> an adjoining allotment <str<strong>on</strong>g>of</str<strong>on</strong>g> land, the pers<strong>on</strong><br />

causing the excav<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> made:<br />

a. must preserve and protect the building from damage, and<br />

b. if necessary, must underpin and support the building in an approved manner, and<br />

c. must, <strong>at</strong> least 7 days <str<strong>on</strong>g>be</str<strong>on</strong>g>fore excav<strong>at</strong>ing <str<strong>on</strong>g>be</str<strong>on</strong>g>low the level <str<strong>on</strong>g>of</str<strong>on</strong>g> the base <str<strong>on</strong>g>of</str<strong>on</strong>g> the footings <str<strong>on</strong>g>of</str<strong>on</strong>g> a<br />

building <strong>on</strong> an adjoining allotment <str<strong>on</strong>g>of</str<strong>on</strong>g> land, give notice <str<strong>on</strong>g>of</str<strong>on</strong>g> intenti<strong>on</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> do so <str<strong>on</strong>g>to</str<strong>on</strong>g> the owner<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> the adjoining allotment <str<strong>on</strong>g>of</str<strong>on</strong>g> land and furnish particulars <str<strong>on</strong>g>of</str<strong>on</strong>g> the excav<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> the owner<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> the building <str<strong>on</strong>g>be</str<strong>on</strong>g>ing erected or demolished.<br />

The owner <str<strong>on</strong>g>of</str<strong>on</strong>g> the adjoining allotment <str<strong>on</strong>g>of</str<strong>on</strong>g> land is not liable for any part <str<strong>on</strong>g>of</str<strong>on</strong>g> the cost <str<strong>on</strong>g>of</str<strong>on</strong>g> work<br />

carried out for the purposes <str<strong>on</strong>g>of</str<strong>on</strong>g> this clause, whether carried out <strong>on</strong> the allotment <str<strong>on</strong>g>of</str<strong>on</strong>g> land <str<strong>on</strong>g>be</str<strong>on</strong>g>ing<br />

excav<strong>at</strong>ed or <strong>on</strong> the adjoining allotment <str<strong>on</strong>g>of</str<strong>on</strong>g> land.<br />

In this clause, allotment <str<strong>on</strong>g>of</str<strong>on</strong>g> land includes a public road and any other public place.<br />

15. Toilet facilities are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> provided, within the work site <strong>on</strong> which work involved in the<br />

erecti<strong>on</strong> or demoliti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a building is <str<strong>on</strong>g>be</str<strong>on</strong>g>ing carried out, <strong>at</strong> the r<strong>at</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e <str<strong>on</strong>g>to</str<strong>on</strong>g>ilet for every 20<br />

pers<strong>on</strong>s or part <str<strong>on</strong>g>of</str<strong>on</strong>g> 20 pers<strong>on</strong>s employed <strong>at</strong> the site.<br />

16. To maintain residential amenity, all electrical services <str<strong>on</strong>g>to</str<strong>on</strong>g> the site are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> provided<br />

underground and must not disturb the root system <str<strong>on</strong>g>of</str<strong>on</strong>g> any trees. Please c<strong>on</strong>tact the energy<br />

supply authority’s local cus<str<strong>on</strong>g>to</str<strong>on</strong>g>mer service <str<strong>on</strong>g>of</str<strong>on</strong>g>fice <str<strong>on</strong>g>to</str<strong>on</strong>g> obtain documentary evidence th<strong>at</strong> the<br />

authority has <str<strong>on</strong>g>be</str<strong>on</strong>g>en c<strong>on</strong>sulted and th<strong>at</strong> their requirements have <str<strong>on</strong>g>be</str<strong>on</strong>g>en met. This inform<strong>at</strong>i<strong>on</strong> is<br />

<str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> Council prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the release <str<strong>on</strong>g>of</str<strong>on</strong>g> the Occup<strong>at</strong>i<strong>on</strong> Certific<strong>at</strong>e.<br />

17. If the work involved in the erecti<strong>on</strong> or demoliti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a building:<br />

a. is likely <str<strong>on</strong>g>to</str<strong>on</strong>g> cause pedestrian or vehicular traffic in a public place <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> obstructed or<br />

rendered inc<strong>on</strong>venient, or<br />

b. building involves the enclosure <str<strong>on</strong>g>of</str<strong>on</strong>g> a public place, a hoarding or fence must <str<strong>on</strong>g>be</str<strong>on</strong>g> erected<br />

<str<strong>on</strong>g>be</str<strong>on</strong>g>tween the work site and the public place.<br />

If necessary, an awning is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> erected, sufficient <str<strong>on</strong>g>to</str<strong>on</strong>g> prevent any substance from, or in<br />

c<strong>on</strong>necti<strong>on</strong> with, the work falling in<str<strong>on</strong>g>to</str<strong>on</strong>g> the public place.<br />

The work site must <str<strong>on</strong>g>be</str<strong>on</strong>g> kept lit <str<strong>on</strong>g>be</str<strong>on</strong>g>tween sunset and sunrise if it is likely <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> hazardous <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

pers<strong>on</strong>s in the public place.<br />

Any such hoarding, fence or awning is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> removed when the work has <str<strong>on</strong>g>be</str<strong>on</strong>g>en completed.<br />

18. All noise gener<strong>at</strong>ing equipment associ<strong>at</strong>ed with any proposed mechanical ventil<strong>at</strong>i<strong>on</strong> system/s<br />

shall <str<strong>on</strong>g>be</str<strong>on</strong>g> loc<strong>at</strong>ed and/or soundpro<str<strong>on</strong>g>of</str<strong>on</strong>g>ed so the equipment is not audible within a habitable room<br />

N:\0504<strong>26</strong>-OMC-PR-03129-<strong>26</strong> TO 30 MARIAN STREET KI.doc/pseitz/38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!