23.03.2014 Views

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 21 / <strong>26</strong><br />

<strong>26</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> 30 Marian Street, Killara<br />

Item 21<br />

DA1243/04<br />

18 April <strong>2005</strong><br />

The development meets the prescri<str<strong>on</strong>g>be</str<strong>on</strong>g>d building envelope requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> LEP194, including<br />

building height, deep soil landscaping, site coverage and setbacks <str<strong>on</strong>g>to</str<strong>on</strong>g> z<strong>on</strong>e interfaces.<br />

The perceived mass and scale <str<strong>on</strong>g>of</str<strong>on</strong>g> the building are reduced by cre<strong>at</strong>ing two "pavili<strong>on</strong>s" r<strong>at</strong>her than 1<br />

c<strong>on</strong>tinuous building and recessi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>to</str<strong>on</strong>g>p floor from the building perimeter.<br />

Built form:<br />

The building is str<strong>on</strong>gly modelled and articul<strong>at</strong>ed with small scale details which break down the<br />

size <str<strong>on</strong>g>of</str<strong>on</strong>g> fl<strong>at</strong> wall areas and provide visual interest. This is also achieved through recessed and<br />

projecting balc<strong>on</strong>ies, and the setback <str<strong>on</strong>g>of</str<strong>on</strong>g> the upper floor which c<strong>on</strong>tributes <str<strong>on</strong>g>to</str<strong>on</strong>g> reducing overall scale<br />

and height.<br />

Setbacks <str<strong>on</strong>g>to</str<strong>on</strong>g> the street boundaries vary (e.g. 12m-19m al<strong>on</strong>g Marian Street) cre<strong>at</strong>ing visual interest<br />

and <strong>at</strong> points exceed the setback requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> DCP 55, substantially reducing the scale and mass<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> the building. In particular, al<strong>on</strong>g the Marian Street elev<strong>at</strong>i<strong>on</strong> the central porti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the building<br />

will <str<strong>on</strong>g>be</str<strong>on</strong>g> set back 19.8m from the boundary for 9.5m <str<strong>on</strong>g>be</str<strong>on</strong>g>ing 5.5m further than the closest part <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

building line <str<strong>on</strong>g>to</str<strong>on</strong>g> Marian Street <strong>at</strong> 12.2m. Al<strong>on</strong>g the Caithness Street elev<strong>at</strong>i<strong>on</strong>, the building setback<br />

extends up <str<strong>on</strong>g>to</str<strong>on</strong>g> 16m.<br />

Density:<br />

The proposed density reflects the desired future character <str<strong>on</strong>g>of</str<strong>on</strong>g> the area, is appropri<strong>at</strong>e for the site and<br />

can <str<strong>on</strong>g>be</str<strong>on</strong>g> serviced adequ<strong>at</strong>ely by existing physical infrastructure with no adverse impact <str<strong>on</strong>g>to</str<strong>on</strong>g> the area.<br />

The floor area <str<strong>on</strong>g>of</str<strong>on</strong>g> the development is slightly larger than anticip<strong>at</strong>ed, however, minimal in the<br />

numerical sense and indiscernible in the visual c<strong>on</strong>text.<br />

Resource, energy and w<strong>at</strong>er efficiency:<br />

100% <str<strong>on</strong>g>of</str<strong>on</strong>g> the apartments have dual aspects, are cross ventil<strong>at</strong>ed, and 70% <str<strong>on</strong>g>of</str<strong>on</strong>g> apartments have a<br />

northerly or north-easterly orient<strong>at</strong>i<strong>on</strong>, gaining more than 3 hours sunlight <str<strong>on</strong>g>to</str<strong>on</strong>g> the living room<br />

windows <str<strong>on</strong>g>be</str<strong>on</strong>g>tween 9am and 3pm in mid winter. Over 50% <str<strong>on</strong>g>of</str<strong>on</strong>g> the site is deep soil areas and w<strong>at</strong>er<br />

retenti<strong>on</strong> is proposed.<br />

The proposal further achieves a 4.5 N<strong>at</strong>HERS energy r<strong>at</strong>ing for 90% (24/27) <str<strong>on</strong>g>of</str<strong>on</strong>g> dwelling units, with<br />

all units achieving the minimum standard <str<strong>on</strong>g>of</str<strong>on</strong>g> 3.5 stars.<br />

Amenity:<br />

The development c<strong>on</strong>tains 27 dwellings, ranging from 153m 2 <str<strong>on</strong>g>to</str<strong>on</strong>g> 222m 2 with balc<strong>on</strong>ies or ground<br />

level priv<strong>at</strong>e open space. The dwelling layout, design and orient<strong>at</strong>i<strong>on</strong> ensure high levels <str<strong>on</strong>g>of</str<strong>on</strong>g> acoustic<br />

and visual privacy and internal amenity in terms <str<strong>on</strong>g>of</str<strong>on</strong>g> n<strong>at</strong>ural light and cross ventil<strong>at</strong>i<strong>on</strong>. Access <str<strong>on</strong>g>to</str<strong>on</strong>g> all<br />

units complies with access and mobility standards.<br />

Safety and security:<br />

N:\0504<strong>26</strong>-OMC-PR-03129-<strong>26</strong> TO 30 MARIAN STREET KI.doc/pseitz/<strong>26</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!