Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 1 / 39<br />

1, 3, and 5 Lynbara Avenue and<br />

12 Porters Lane, St Ives<br />

Item 1 1219/04<br />

1 April <strong>2005</strong><br />

46. For the purpose <str<strong>on</strong>g>of</str<strong>on</strong>g> any inspecti<strong>on</strong>s by Council engineers, the corresp<strong>on</strong>ding fees set out in<br />

Councils adopted Schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> Fees and Charges are payable <str<strong>on</strong>g>to</str<strong>on</strong>g> Council. A re-inspecti<strong>on</strong> fee<br />

per visit may <str<strong>on</strong>g>be</str<strong>on</strong>g> charged where work is unprepared <strong>at</strong> the requested time <str<strong>on</strong>g>of</str<strong>on</strong>g> inspecti<strong>on</strong>, or<br />

where remedial work is uns<strong>at</strong>isfac<str<strong>on</strong>g>to</str<strong>on</strong>g>ry and a further inspecti<strong>on</strong> is required. Engineering fees<br />

must <str<strong>on</strong>g>be</str<strong>on</strong>g> paid in full prior <str<strong>on</strong>g>to</str<strong>on</strong>g> any final c<strong>on</strong>sent from Council.<br />

47. The Applicant must obtain a Secti<strong>on</strong> 73 Compliance Certific<strong>at</strong>e under the Sydney W<strong>at</strong>er Act<br />

1994. An applic<strong>at</strong>i<strong>on</strong> must <str<strong>on</strong>g>be</str<strong>on</strong>g> made through an authorised W<strong>at</strong>er Servicing Coordina<str<strong>on</strong>g>to</str<strong>on</strong>g>r.<br />

Please refer <str<strong>on</strong>g>to</str<strong>on</strong>g> “Your Business” secti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Sydney W<strong>at</strong>er’s web site <strong>at</strong><br />

www.sydneyw<strong>at</strong>er.com.au then the “e-developer” ic<strong>on</strong> or teleph<strong>on</strong>e 13 20 92. Following<br />

applic<strong>at</strong>i<strong>on</strong> a “Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Requirements” will detail w<strong>at</strong>er and sewer extensi<strong>on</strong>s <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> built and<br />

charges <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> paid. Please make early c<strong>on</strong>tact with the Coordina<str<strong>on</strong>g>to</str<strong>on</strong>g>r, since building <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

w<strong>at</strong>er/sewer extensi<strong>on</strong>s can <str<strong>on</strong>g>be</str<strong>on</strong>g> time c<strong>on</strong>suming and may impact <strong>on</strong> other services and<br />

building, driveway or landscape design.<br />

48. During c<strong>on</strong>structi<strong>on</strong>, s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er run<str<strong>on</strong>g>of</str<strong>on</strong>g>f must <str<strong>on</strong>g>be</str<strong>on</strong>g> disposed in a c<strong>on</strong>trolled manner th<strong>at</strong> is<br />

comp<strong>at</strong>ible with the erosi<strong>on</strong> and sediment c<strong>on</strong>trols <strong>on</strong> the site. Immedi<strong>at</strong>ely up<strong>on</strong> completi<strong>on</strong><br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> any impervious areas <strong>on</strong> the site (including ro<str<strong>on</strong>g>of</str<strong>on</strong>g>s, driveways, paving) and where the final<br />

drainage system is incomplete, the necessary temporary drainage systems shall <str<strong>on</strong>g>be</str<strong>on</strong>g> installed <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

c<strong>on</strong>trol run<str<strong>on</strong>g>of</str<strong>on</strong>g>f as far as the approved point <str<strong>on</strong>g>of</str<strong>on</strong>g> s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er discharge. Such measures shall <str<strong>on</strong>g>be</str<strong>on</strong>g> <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

the s<strong>at</strong>isfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the Principal Certifying Authority (PCA).<br />

49 Geotechnical aspects <str<strong>on</strong>g>of</str<strong>on</strong>g> the development works, particularly excav<strong>at</strong>i<strong>on</strong> and support, must <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

undertaken in accordance with the recommend<strong>at</strong>i<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> the “Report <str<strong>on</strong>g>to</str<strong>on</strong>g> Mr. Camer<strong>on</strong> Nels<strong>on</strong><br />

<strong>on</strong> Geotechnical Investig<strong>at</strong>i<strong>on</strong> for Proposed Residential Development <strong>at</strong> 1 <str<strong>on</strong>g>to</str<strong>on</strong>g> 5 Lynbarra<br />

avenue and 12 Porters Lane, St Ives NSW” (project 18895VBrpt, d<strong>at</strong>ed 21 st Oc<str<strong>on</strong>g>to</str<strong>on</strong>g><str<strong>on</strong>g>be</str<strong>on</strong>g>r 2004)<br />

prepared by Jeffery and K<strong>at</strong>auskas C<strong>on</strong>sulting Engineers.<br />

50. The geotechnical implement<strong>at</strong>i<strong>on</strong> plan, testing and m<strong>on</strong>i<str<strong>on</strong>g>to</str<strong>on</strong>g>ring program for the c<strong>on</strong>structi<strong>on</strong><br />

works must <str<strong>on</strong>g>be</str<strong>on</strong>g> in accordance with the “Report <strong>on</strong> Geotechnical Investig<strong>at</strong>i<strong>on</strong> for Proposed<br />

Residential Development 12 Ada Ave, Wahro<strong>on</strong>ga” (project 37312, d<strong>at</strong>ed August 2004)<br />

prepared by Douglas Partners. A qualified Geotechnical/hydrogeological Engineer must<br />

complete the following:<br />

• Further geotechnical investig<strong>at</strong>i<strong>on</strong>s and testing recommended in the above report(s) and<br />

as determined necessary,<br />

• Further m<strong>on</strong>i<str<strong>on</strong>g>to</str<strong>on</strong>g>ring and inspecti<strong>on</strong> <strong>at</strong> the hold points recommended in the above<br />

report(s) and as determined necessary,<br />

• Written report(s) and certific<strong>at</strong>i<strong>on</strong>(s) <str<strong>on</strong>g>of</str<strong>on</strong>g> the geotechnical inspecti<strong>on</strong>, testing and<br />

m<strong>on</strong>i<str<strong>on</strong>g>to</str<strong>on</strong>g>ring programs.<br />

51. Approval is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> obtained from Ku-ring-gai Council Traffic Committee for any temporary<br />

public road closures and/or placement or cranes <strong>on</strong> public land.<br />

52. All c<strong>on</strong>structi<strong>on</strong> traffic c<strong>on</strong>trol and management measures shall <str<strong>on</strong>g>be</str<strong>on</strong>g> implemented generally in<br />

accordance with the C<strong>on</strong>structi<strong>on</strong> Traffic Management Plan prepared by Mass<strong>on</strong> Wils<strong>on</strong><br />

Twiney, d<strong>at</strong>ed Oc<str<strong>on</strong>g>to</str<strong>on</strong>g><str<strong>on</strong>g>be</str<strong>on</strong>g>r 2004, submitted with the DA. The Principal Certifying Authority<br />

N:\0504<strong>26</strong>-OMC-PR-03117-1 3 AND 5 LYNBARA AVENUE.doc/ssegall/39