23.03.2014 Views

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 20 / 33<br />

1 & 1A Lam<strong>on</strong>d Drive, 1444 &<br />

1444A Pacific Highway,<br />

Turramurra<br />

Item 20<br />

DA1099/04<br />

13 April <strong>2005</strong><br />

Development C<strong>on</strong>trol Plan No 55 - Railway/Pacific Highway Corridor &<br />

St Ives Centre<br />

COMPLIANCE TABLE<br />

Development c<strong>on</strong>trol Proposed Complies<br />

Part 3 Local c<strong>on</strong>text:<br />

Development adjacent <str<strong>on</strong>g>to</str<strong>on</strong>g> a<br />

heritage item:<br />

• First and sec<strong>on</strong>d s<str<strong>on</strong>g>to</str<strong>on</strong>g>reys <strong>at</strong><br />

least 10 metres from<br />

adjacent heritage building;<br />

• Third and fourth s<str<strong>on</strong>g>to</str<strong>on</strong>g>reys<br />

set <strong>at</strong> least 15 metres from<br />

adjacent heritage building<br />

• Setback from the fr<strong>on</strong>t<br />

Exceeds 35 metres from any heritage item<br />

Exceeds 35 metres from any heritage item<br />

Not applicable<br />

YES<br />

YES<br />

YES<br />

boundary so th<strong>at</strong> it is no<br />

closer than adj heritage<br />

building<br />

Part 4.1 Landscape design:<br />

Deep soil landscaping (min)<br />

• 150m 2 per 1000m 2 <str<strong>on</strong>g>of</str<strong>on</strong>g> site 750m 2 (side setback area <str<strong>on</strong>g>to</str<strong>on</strong>g> the north <str<strong>on</strong>g>of</str<strong>on</strong>g> the building)<br />

area = 636m 2<br />

YES<br />

No. <str<strong>on</strong>g>of</str<strong>on</strong>g> tall trees required<br />

(min): 14 trees 21 YES<br />

Part 4.2 Density:<br />

Building footprint (max):<br />

• 35% <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>to</str<strong>on</strong>g>tal site area 33% YES<br />

Floor space r<strong>at</strong>io (max):<br />

• 1.3:1 (5512m 2 ) 1.179 (4998m 2 ) YES<br />

Part 4.3 Setbacks:<br />

Street boundary setback<br />

(min):<br />

• 10-12 metres 13-15<br />

metres <strong>on</strong> Lam<strong>on</strong>d<br />

Drive, Pacific Highway<br />

(

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!