Ordinary Meeting ong>ofong> Council - 26 April 2005 20 / 19 1 & 1A Lamond Drive, 1444 & 1444A Pacific Highway, Turramurra Item 20 DA1099/04 13 April 2005 Vehicle Access and Accommodation layout Proposed vehicle access and accommodation arrangements have ong>beong>en assessed against the Australian Standard 2890.1 2004 – “Off street Car Parking” and Council DCP 43 – “Car parking”. The following table summarises Development Engineers assessment ong>ofong> the proposed parking arrangements against this Australian Standard. Aspect Dimensions ong>ofong> spaces Circulation aisle widths Blind aisle situations Circulation ramps Entrance driveway location Sight distances at driveway exit Entrance driveway widths Entrance driveway grades Height clearance in parking area Comment Satisfacong>toong>ry, Satisfacong>toong>ry for less than 30 vehicle movements per hour and subject ong>toong> appropriate line marking and signage. Detail ong>toong> ong>beong> provided on Construction Certificate plans Satisfacong>toong>ry Satisfacong>toong>ry, convex mirrors ong>toong> ong>beong> shown on Construction Certificate plans Satisfacong>toong>ry Satisfacong>toong>ry Satisfacong>toong>ry, ong>toong> ong>beong> refined on Construction Certificate plans Satisfacong>toong>ry To ong>beong> shown on Construction Certificate plans Conditions are ong>toong> ong>beong> applied that will require necessary minor modifications ong>toong> the parking layout (ong>toong> ong>beong> shown on the Construction Certificate plans) in order ong>toong> achieve a parking and access design that complies with the relevant Australian Standard 2890.1. Garbage Collection A waste song>toong>rage and collection area is required internally under Councils DCP 40 for Waste Management. This has ong>beong>en provided in the basement parking area and there is adequate provision ong>toong> ong>beong> provided for Councils waste collection vehicle ong>toong> enter the subject site, collect the garbage and then exit the site. Impacts on Council Infrastructure and associated works - comments The scale ong>ofong> construction work for this site is expected ong>toong> damage the road shoulder, and possibly the road surface. In addition, the applicant will ong>beong> required ong>toong> provide a pedestrian footpath link ong>beong>tween the foot entrances on Lamond Drive. Accordingly, the following infrastructure works will ong>beong> required under this consent: • Construction ong>ofong> a fully new concrete footpath over the site frontage in Lamond Drive. Maximum cross fall ong>toong> ong>beong> 2.5% ong>toong>wards the gutter. N:\050426-OMC-PR-03122-1 1A LAMOND DRIVE 1444.doc/cswanepoel/19

Ordinary Meeting ong>ofong> Council - 26 April 2005 20 / 20 1 & 1A Lamond Drive, 1444 & 1444A Pacific Highway, Turramurra Item 20 DA1099/04 13 April 2005 • New concrete driveway crossings from Lamond Drive. • Removal ong>ofong> all redundant driveway laybacks and re-instatement ong>toong> upright kerb and gutter. • Repair ong>ofong> all damaged public infrastructure. As this site is located within walking distance ong>ofong> the Turramurra Rail station, the area may experience a higher demand for on-street parking in this location at certain times during the day. This may make on-street parking or queuing in Lamond Drive difficult for construction related vehicles (e.g waiting in the road reserve for loading during spoil removal). Accordingly, it is recommended (subject ong>toong> approval by the Local Traffic Committee) that a Work Zone ong>beong> installed in the immediate vicinity ong>ofong> the site. This will assist in preventing non-construction related vehicles interfering with the site frontage during works. Accordingly, a condition will ong>beong> applied that the applicant obtain a resolution from the Traffic Committee in relation ong>toong> obtaining a work zone - proceed in accordance with any recommendation from the resolution. The requirement for a work zone is considered reasonable for this scale ong>ofong> development. As with all development ong>ofong> this scale, there is the direct risk ong>ofong> damage ong>toong> Council infrastructure during the course ong>ofong> the works. A $50,000 bond ong>toong> cover resong>toong>ration ong>ofong> such damage (or completion ong>ofong> incomplete works by Council) is ong>toong> ong>beong> applied. Site drainage comments The submitted concept song>toong>rmwater services plans (refer plan 04042-C01A by Dincel and Associates), have ong>beong>en designed in accordance with the Council requirements contained in the adopted Water Management DCP 47. A minimum song>toong>rmwater retention requirement ong>ofong> 3000 litres per unit applies – and this water is ong>toong> ong>beong> used for ong>toong>ilet flushing, laundry, car washing and irrigation (as a minimum). The site drains ong>toong> what is shown as an existing interallotment drainage system which ong>beong>nefits the lower lot at point ong>ofong> discharge. Accordingly, the applicant has shown a component ong>ofong> on-site detention on the proposal ong>toong> control run-ong>ofong>f inong>toong> the interallotment system. The interallotment drainage right must ong>beong> transferred ong>toong> the entire site when the lots are consolidated. The consent ong>ofong> the burdened property will ong>beong> required. This requirement will ong>beong> handled by way ong>ofong> condition ong>ofong> consent requiring the applicant ong>toong> create the necessary drainage easements. Further, it will ong>beong> the responsibility ong>ofong> the applicant ong>toong> ensure that the drainage infrastructure within the necessary easement will have adequate capacity. This will ong>beong> dealt with by way ong>ofong> condition. Conditions ong>ofong> consent are ong>toong> ong>beong> applied which will require the refinement and advancement ong>ofong> the DA concept drainage plans ong>toong> a detail suitable for Construction Certificate issue. Flooding and Overland comments The site is located ong>toong>wards the ong>toong>p ong>ofong> the local catchment (along the ridge ong>ofong> the Pacific Highway) and as such the site will not ong>beong> affected by trunk flows ong>ofong> sufficient volume around the site ong>toong> cause concern. The driveway level at the property boundary shall ong>beong> set a minimum ong>ofong> 150mm above the N:\050426-OMC-PR-03122-1 1A LAMOND DRIVE 1444.doc/cswanepoel/20

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 20 / 20<br />

1 & 1A Lam<strong>on</strong>d Drive, 1444 &<br />

1444A Pacific Highway,<br />

Turramurra<br />

Item 20<br />

DA1099/04<br />

13 April <strong>2005</strong><br />

• New c<strong>on</strong>crete driveway crossings from Lam<strong>on</strong>d Drive.<br />

• Removal <str<strong>on</strong>g>of</str<strong>on</strong>g> all redundant driveway laybacks and re-inst<strong>at</strong>ement <str<strong>on</strong>g>to</str<strong>on</strong>g> upright kerb and gutter.<br />

• Repair <str<strong>on</strong>g>of</str<strong>on</strong>g> all damaged public infrastructure.<br />

As this site is loc<strong>at</strong>ed within walking distance <str<strong>on</strong>g>of</str<strong>on</strong>g> the Turramurra Rail st<strong>at</strong>i<strong>on</strong>, the area may<br />

experience a higher demand for <strong>on</strong>-street parking in this loc<strong>at</strong>i<strong>on</strong> <strong>at</strong> certain times during the day.<br />

This may make <strong>on</strong>-street parking or queuing in Lam<strong>on</strong>d Drive difficult for c<strong>on</strong>structi<strong>on</strong> rel<strong>at</strong>ed<br />

vehicles (e.g waiting in the road reserve for loading during spoil removal). Accordingly, it is<br />

recommended (subject <str<strong>on</strong>g>to</str<strong>on</strong>g> approval by the Local Traffic Committee) th<strong>at</strong> a Work Z<strong>on</strong>e <str<strong>on</strong>g>be</str<strong>on</strong>g> installed in<br />

the immedi<strong>at</strong>e vicinity <str<strong>on</strong>g>of</str<strong>on</strong>g> the site. This will assist in preventing n<strong>on</strong>-c<strong>on</strong>structi<strong>on</strong> rel<strong>at</strong>ed vehicles<br />

interfering with the site fr<strong>on</strong>tage during works. Accordingly, a c<strong>on</strong>diti<strong>on</strong> will <str<strong>on</strong>g>be</str<strong>on</strong>g> applied th<strong>at</strong> the<br />

applicant obtain a resoluti<strong>on</strong> from the Traffic Committee in rel<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> obtaining a work z<strong>on</strong>e -<br />

proceed in accordance with any recommend<strong>at</strong>i<strong>on</strong> from the resoluti<strong>on</strong>. The requirement for a work<br />

z<strong>on</strong>e is c<strong>on</strong>sidered reas<strong>on</strong>able for this scale <str<strong>on</strong>g>of</str<strong>on</strong>g> development.<br />

As with all development <str<strong>on</strong>g>of</str<strong>on</strong>g> this scale, there is the direct risk <str<strong>on</strong>g>of</str<strong>on</strong>g> damage <str<strong>on</strong>g>to</str<strong>on</strong>g> Council infrastructure<br />

during the course <str<strong>on</strong>g>of</str<strong>on</strong>g> the works. A $50,000 b<strong>on</strong>d <str<strong>on</strong>g>to</str<strong>on</strong>g> cover res<str<strong>on</strong>g>to</str<strong>on</strong>g>r<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> such damage (or completi<strong>on</strong><br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> incomplete works by Council) is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> applied.<br />

Site drainage comments<br />

The submitted c<strong>on</strong>cept s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er services plans (refer plan 04042-C01A by Dincel and<br />

Associ<strong>at</strong>es), have <str<strong>on</strong>g>be</str<strong>on</strong>g>en designed in accordance with the Council requirements c<strong>on</strong>tained in the<br />

adopted W<strong>at</strong>er Management DCP 47. A minimum s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er retenti<strong>on</strong> requirement <str<strong>on</strong>g>of</str<strong>on</strong>g> 3000 litres<br />

per unit applies – and this w<strong>at</strong>er is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> used for <str<strong>on</strong>g>to</str<strong>on</strong>g>ilet flushing, laundry, car washing and<br />

irrig<strong>at</strong>i<strong>on</strong> (as a minimum).<br />

The site drains <str<strong>on</strong>g>to</str<strong>on</strong>g> wh<strong>at</strong> is shown as an existing interallotment drainage system which <str<strong>on</strong>g>be</str<strong>on</strong>g>nefits the<br />

lower lot <strong>at</strong> point <str<strong>on</strong>g>of</str<strong>on</strong>g> discharge. Accordingly, the applicant has shown a comp<strong>on</strong>ent <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>-site<br />

detenti<strong>on</strong> <strong>on</strong> the proposal <str<strong>on</strong>g>to</str<strong>on</strong>g> c<strong>on</strong>trol run-<str<strong>on</strong>g>of</str<strong>on</strong>g>f in<str<strong>on</strong>g>to</str<strong>on</strong>g> the interallotment system. The interallotment<br />

drainage right must <str<strong>on</strong>g>be</str<strong>on</strong>g> transferred <str<strong>on</strong>g>to</str<strong>on</strong>g> the entire site when the lots are c<strong>on</strong>solid<strong>at</strong>ed. The c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

the burdened property will <str<strong>on</strong>g>be</str<strong>on</strong>g> required. This requirement will <str<strong>on</strong>g>be</str<strong>on</strong>g> handled by way <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

c<strong>on</strong>sent requiring the applicant <str<strong>on</strong>g>to</str<strong>on</strong>g> cre<strong>at</strong>e the necessary drainage easements. Further, it will <str<strong>on</strong>g>be</str<strong>on</strong>g> the<br />

resp<strong>on</strong>sibility <str<strong>on</strong>g>of</str<strong>on</strong>g> the applicant <str<strong>on</strong>g>to</str<strong>on</strong>g> ensure th<strong>at</strong> the drainage infrastructure within the necessary<br />

easement will have adequ<strong>at</strong>e capacity. This will <str<strong>on</strong>g>be</str<strong>on</strong>g> dealt with by way <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>diti<strong>on</strong>.<br />

C<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>sent are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> applied which will require the refinement and advancement <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

DA c<strong>on</strong>cept drainage plans <str<strong>on</strong>g>to</str<strong>on</strong>g> a detail suitable for C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e issue.<br />

Flooding and Overland comments<br />

The site is loc<strong>at</strong>ed <str<strong>on</strong>g>to</str<strong>on</strong>g>wards the <str<strong>on</strong>g>to</str<strong>on</strong>g>p <str<strong>on</strong>g>of</str<strong>on</strong>g> the local c<strong>at</strong>chment (al<strong>on</strong>g the ridge <str<strong>on</strong>g>of</str<strong>on</strong>g> the Pacific Highway)<br />

and as such the site will not <str<strong>on</strong>g>be</str<strong>on</strong>g> affected by trunk flows <str<strong>on</strong>g>of</str<strong>on</strong>g> sufficient volume around the site <str<strong>on</strong>g>to</str<strong>on</strong>g> cause<br />

c<strong>on</strong>cern. The driveway level <strong>at</strong> the property boundary shall <str<strong>on</strong>g>be</str<strong>on</strong>g> set a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> 150mm above the<br />

N:\0504<strong>26</strong>-OMC-PR-03122-1 1A LAMOND DRIVE 1444.doc/cswanepoel/20