Ordinary Meeting ong>ofong> Council - 26 April 2005 8 / 6 Item 8 DA0177/03 24 March 2005 satisfy concerns regarding overland flows entering the garage via the driveway. Overall, the design was found ong>toong> ong>beong> in accordance with DCP 47 requirements and is considered satisfacong>toong>ry. Integrity ong>ofong> the pipeline should ong>beong> protected from loading by heavy machinery during construction given the low depth ong>ofong> cover. Council should restrict the area from heavy construction machinery by use ong>ofong> temporary fencing surrounding the easement, with inspection by CCTV upon completion ong>ofong> the dwelling ong>toong> verify the pipeline condition prior ong>toong> issue ong>ofong> occupation certificate. Erosion control measures are descriong>beong>d by notes only and need ong>toong> shown on plans indicating their location and extent ong>toong> avoid misinterpretation, and moniong>toong>ring for compliance. RECOMMENDATION A. That Council approves the granting ong>ofong> the proposed drainage easement descriong>beong>d in the instrument setting out the terms ong>ofong> easement intended ong>toong> ong>beong> created and released pursuant ong>toong> section 88B Conveyancing Act 1919. These terms specify the release ong>ofong> Easement and Restrictive Covenant 1.22 metres wide over 15 Pearson Avenue and creation ong>ofong> a new Easement ong>toong> Drain Water 1.22 wide over 17 Pearson Avenue and creation ong>ofong> a new Easement 1.6 wide and variable and Restriction on Use ong>ofong> Land over 15 Pearson Avenue, Gordon. B. That authority ong>beong> given ong>toong> affix the common Seal ong>ofong> the Council ong>toong> the instrument for release and creation ong>ofong> new easements and Restriction on Use ong>ofong> Land. C. That altering the terms ong>ofong> said Easements for drainage including release and ong>beong>ing conditional on payment ong>toong> Council ong>ofong> Council's legal costs and disbursements. D. That Council approves the proposal ong>toong> modify the song>toong>rmwater drainage pipelines in accordance with revised song>toong>rmwater plans and details, drawings GD 2.1, GD 2.4 and GD 2.7 Revision D, along with GD 2.2, GD 2.5 and GD 2.6 Revision C, prepared by K.R Stubbs & Associates Pty Ltd and subject ong>toong> the following conditions: 1. The carrying out ong>ofong> all drainage works in accordance with the plans and specifications approved by Council at no cost ong>toong> Council. 2. The works are subject ong>toong> inspections. The Applicant or their engineer is ong>toong> give Council at least 24 hours notice (ong>toong> allow inspections) at the following stages: i. After completion ong>ofong> excavation and prior ong>toong> pipe laying commencing. ii. After completion ong>ofong> pipe laying prior ong>toong> backfilling, iii. On completion ong>ofong> pipeline installation 4. That prior ong>toong> construction ong>ofong> the dwelling, fencing or suitable alternative ong>beong> installed around the easement perimeter ong>toong> prevent loading by heavy construction machinery on the area directly above the pipelines at no cost ong>toong> Council. N:\050426-OMC-SR-03080-15 PEARSON AVENUE GORDON.doc/tattam /6

Ordinary Meeting ong>ofong> Council - 26 April 2005 8 / 7 Item 8 DA0177/03 24 March 2005 5. That after the dwelling is completed, an inspection ong>ofong> the pipeline by Closed Circuit TV or suitable alternative ong>beong> undertaken ong>toong> verify the structural integrity ong>ofong> pipelines at no cost ong>toong> Council, prior ong>toong> the issue ong>ofong> Occupation Certificate. 6. That Erosion control measures descriong>beong>d by notes on drawing GD 2.6 ong>beong> amended ong>toong> detail and show the location and extent ong>ofong> the layout on the plan. Ian Taylor Manager Support Services Greg Piconi Direcong>toong>r Technical Services Attachments: 1. Annexure A showing pre-commencement conditions. 2. Existing Drainage Layout Plan 3. Partial drawing plan GD2.1 showing drainage layout 4. Partial drawing plan GD2.4 showing relief overland path N:\050426-OMC-SR-03080-15 PEARSON AVENUE GORDON.doc/tattam /7

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 8 / 6<br />

Item 8<br />

DA0177/03<br />

24 March <strong>2005</strong><br />

s<strong>at</strong>isfy c<strong>on</strong>cerns regarding overland flows entering the garage via the driveway. Overall, the design<br />

was found <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> in accordance with DCP 47 requirements and is c<strong>on</strong>sidered s<strong>at</strong>isfac<str<strong>on</strong>g>to</str<strong>on</strong>g>ry.<br />

Integrity <str<strong>on</strong>g>of</str<strong>on</strong>g> the pipeline should <str<strong>on</strong>g>be</str<strong>on</strong>g> protected from loading by heavy machinery during c<strong>on</strong>structi<strong>on</strong><br />

given the low depth <str<strong>on</strong>g>of</str<strong>on</strong>g> cover. Council should restrict the area from heavy c<strong>on</strong>structi<strong>on</strong> machinery<br />

by use <str<strong>on</strong>g>of</str<strong>on</strong>g> temporary fencing surrounding the easement, with inspecti<strong>on</strong> by CCTV up<strong>on</strong> completi<strong>on</strong><br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> the dwelling <str<strong>on</strong>g>to</str<strong>on</strong>g> verify the pipeline c<strong>on</strong>diti<strong>on</strong> prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> occup<strong>at</strong>i<strong>on</strong> certific<strong>at</strong>e.<br />

Erosi<strong>on</strong> c<strong>on</strong>trol measures are descri<str<strong>on</strong>g>be</str<strong>on</strong>g>d by notes <strong>on</strong>ly and need <str<strong>on</strong>g>to</str<strong>on</strong>g> shown <strong>on</strong> plans indic<strong>at</strong>ing their<br />

loc<strong>at</strong>i<strong>on</strong> and extent <str<strong>on</strong>g>to</str<strong>on</strong>g> avoid misinterpret<strong>at</strong>i<strong>on</strong>, and m<strong>on</strong>i<str<strong>on</strong>g>to</str<strong>on</strong>g>ring for compliance.<br />

RECOMMENDATION<br />

A. Th<strong>at</strong> Council approves the granting <str<strong>on</strong>g>of</str<strong>on</strong>g> the proposed drainage easement descri<str<strong>on</strong>g>be</str<strong>on</strong>g>d in<br />

the instrument setting out the terms <str<strong>on</strong>g>of</str<strong>on</strong>g> easement intended <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> cre<strong>at</strong>ed and released<br />

pursuant <str<strong>on</strong>g>to</str<strong>on</strong>g> secti<strong>on</strong> 88B C<strong>on</strong>veyancing Act 1919. These terms specify the release <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

Easement and Restrictive Covenant 1.22 metres wide over 15 Pears<strong>on</strong> Avenue and<br />

cre<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a new Easement <str<strong>on</strong>g>to</str<strong>on</strong>g> Drain W<strong>at</strong>er 1.22 wide over 17 Pears<strong>on</strong> Avenue and<br />

cre<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a new Easement 1.6 wide and variable and Restricti<strong>on</strong> <strong>on</strong> Use <str<strong>on</strong>g>of</str<strong>on</strong>g> Land over<br />

15 Pears<strong>on</strong> Avenue, Gord<strong>on</strong>.<br />

B. Th<strong>at</strong> authority <str<strong>on</strong>g>be</str<strong>on</strong>g> given <str<strong>on</strong>g>to</str<strong>on</strong>g> affix the comm<strong>on</strong> Seal <str<strong>on</strong>g>of</str<strong>on</strong>g> the Council <str<strong>on</strong>g>to</str<strong>on</strong>g> the instrument for<br />

release and cre<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> new easements and Restricti<strong>on</strong> <strong>on</strong> Use <str<strong>on</strong>g>of</str<strong>on</strong>g> Land.<br />

C. Th<strong>at</strong> altering the terms <str<strong>on</strong>g>of</str<strong>on</strong>g> said Easements for drainage including release and <str<strong>on</strong>g>be</str<strong>on</strong>g>ing<br />

c<strong>on</strong>diti<strong>on</strong>al <strong>on</strong> payment <str<strong>on</strong>g>to</str<strong>on</strong>g> Council <str<strong>on</strong>g>of</str<strong>on</strong>g> Council's legal costs and disbursements.<br />

D. Th<strong>at</strong> Council approves the proposal <str<strong>on</strong>g>to</str<strong>on</strong>g> modify the s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er drainage pipelines in<br />

accordance with revised s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er plans and details, drawings GD 2.1, GD 2.4 and<br />

GD 2.7 Revisi<strong>on</strong> D, al<strong>on</strong>g with GD 2.2, GD 2.5 and GD 2.6 Revisi<strong>on</strong> C, prepared by<br />

K.R Stubbs & Associ<strong>at</strong>es Pty Ltd and subject <str<strong>on</strong>g>to</str<strong>on</strong>g> the following c<strong>on</strong>diti<strong>on</strong>s:<br />

1. The carrying out <str<strong>on</strong>g>of</str<strong>on</strong>g> all drainage works in accordance with the plans and<br />

specific<strong>at</strong>i<strong>on</strong>s approved by Council <strong>at</strong> no cost <str<strong>on</strong>g>to</str<strong>on</strong>g> Council.<br />

2. The works are subject <str<strong>on</strong>g>to</str<strong>on</strong>g> inspecti<strong>on</strong>s. The Applicant or their engineer is <str<strong>on</strong>g>to</str<strong>on</strong>g> give<br />

Council <strong>at</strong> least 24 hours notice (<str<strong>on</strong>g>to</str<strong>on</strong>g> allow inspecti<strong>on</strong>s) <strong>at</strong> the following stages:<br />

i. After completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> excav<strong>at</strong>i<strong>on</strong> and prior <str<strong>on</strong>g>to</str<strong>on</strong>g> pipe laying commencing.<br />

ii. After completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> pipe laying prior <str<strong>on</strong>g>to</str<strong>on</strong>g> backfilling,<br />

iii. On completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> pipeline install<strong>at</strong>i<strong>on</strong><br />

4. Th<strong>at</strong> prior <str<strong>on</strong>g>to</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the dwelling, fencing or suitable altern<strong>at</strong>ive <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

installed around the easement perimeter <str<strong>on</strong>g>to</str<strong>on</strong>g> prevent loading by heavy<br />

c<strong>on</strong>structi<strong>on</strong> machinery <strong>on</strong> the area directly above the pipelines <strong>at</strong> no cost <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

Council.<br />

N:\0504<strong>26</strong>-OMC-SR-03080-15 PEARSON AVENUE GORDON.doc/t<strong>at</strong>tam /6