23.03.2014 Views

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 8 / 4<br />

Item 8<br />

DA0177/03<br />

24 March <strong>2005</strong><br />

incorpor<strong>at</strong>e <str<strong>on</strong>g>be</str<strong>on</strong>g>nching <str<strong>on</strong>g>to</str<strong>on</strong>g> improve hydraulics in the s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er system th<strong>at</strong> reduces the<br />

occurrence <str<strong>on</strong>g>of</str<strong>on</strong>g> up welling.<br />

ii.<br />

iii.<br />

Provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> overland flow route is designed <str<strong>on</strong>g>to</str<strong>on</strong>g> c<strong>on</strong>vey the flow (<str<strong>on</strong>g>of</str<strong>on</strong>g> 607 L/s) from a 5 year<br />

ARI design s<str<strong>on</strong>g>to</str<strong>on</strong>g>rm event and is accordance with DCP47 requirements. The flow route <strong>at</strong> its<br />

critical secti<strong>on</strong> oper<strong>at</strong>es as a weir th<strong>at</strong> accommod<strong>at</strong>es the full 5 year ARI design flow without<br />

over<str<strong>on</strong>g>to</str<strong>on</strong>g>pping the driveway.<br />

To ensure there is a low risk <str<strong>on</strong>g>of</str<strong>on</strong>g> flooding in<str<strong>on</strong>g>to</str<strong>on</strong>g> the garage due <str<strong>on</strong>g>to</str<strong>on</strong>g> the proximity <str<strong>on</strong>g>of</str<strong>on</strong>g> the relief<br />

overflow route <str<strong>on</strong>g>to</str<strong>on</strong>g> the driveway <str<strong>on</strong>g>of</str<strong>on</strong>g>f Burgoyne Street, measures include:<br />

• Replacement <str<strong>on</strong>g>of</str<strong>on</strong>g> 7metres <str<strong>on</strong>g>of</str<strong>on</strong>g> 150mm high kerb with a 4 metre shallow sloping vee<br />

secti<strong>on</strong> gutter 75mm in height with transiti<strong>on</strong>s <strong>on</strong> both sides, such th<strong>at</strong> excess gutter<br />

flows are facilit<strong>at</strong>ed in<str<strong>on</strong>g>to</str<strong>on</strong>g> the overland overflow route. The sloped vee secti<strong>on</strong> is not<br />

c<strong>on</strong>sidered <str<strong>on</strong>g>to</str<strong>on</strong>g> interfere with parked cars.<br />

• A transiti<strong>on</strong>ed flowp<strong>at</strong>h route is proposed across the n<strong>at</strong>ure strip which is depressed<br />

<str<strong>on</strong>g>be</str<strong>on</strong>g>low the driveway level by 90mm <strong>at</strong> the layback and 250mm <strong>at</strong> the boundary. Revised<br />

drawings GD2.1, GD2.4 and GD2.7 Revisi<strong>on</strong> D were submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> include amended<br />

levels <str<strong>on</strong>g>of</str<strong>on</strong>g> the driveway layback.<br />

• Barrier for the gutter flows likely <str<strong>on</strong>g>to</str<strong>on</strong>g> occur <strong>on</strong> both sides <str<strong>on</strong>g>of</str<strong>on</strong>g> the relief route by use <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

driveway layback and 150mm high kerb.<br />

• Larger than standard trench gr<strong>at</strong>e (TD1) fr<strong>on</strong>ting the garage designed 400mm wide by<br />

300mm deep with a 225 diameter outlet pipe c<strong>on</strong>veyed <str<strong>on</strong>g>to</str<strong>on</strong>g> the downstream pit.<br />

iv.<br />

Drainage Works proposed in Burgoyne Street comprise two modified and two new road pits<br />

with 2.5 metres <str<strong>on</strong>g>of</str<strong>on</strong>g> 375mm pipeline. The proposed road pits and gr<strong>at</strong>es were assessed and<br />

provide equivalent inlet capacity as existing with account made for the reduced p<strong>on</strong>ding<br />

depth.<br />

v. Structural capacity <str<strong>on</strong>g>of</str<strong>on</strong>g> the 600mm pipe <str<strong>on</strong>g>to</str<strong>on</strong>g> withstand c<strong>on</strong>structi<strong>on</strong> loads. Class 2 pipes are<br />

typically <strong>at</strong> risk during c<strong>on</strong>structi<strong>on</strong> when loaded by heavy equipment. Based <strong>on</strong> the l<strong>on</strong>g<br />

secti<strong>on</strong>, adequ<strong>at</strong>e cover (<str<strong>on</strong>g>of</str<strong>on</strong>g> 0.9 - 2.4 metres) is provided with the n<strong>at</strong>ure strip but not<br />

c<strong>on</strong>sidered adequ<strong>at</strong>e within the property with the depth ranging 0.5 – 0.9 metres.<br />

The aband<strong>on</strong>ed 450mm pipeline within No.15 is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> sand filled and is c<strong>on</strong>sidered s<strong>at</strong>isfac<str<strong>on</strong>g>to</str<strong>on</strong>g>ry.<br />

Integrity <str<strong>on</strong>g>of</str<strong>on</strong>g> the pipeline should <str<strong>on</strong>g>be</str<strong>on</strong>g> protected by restricting the area over the pipeline from heavy<br />

c<strong>on</strong>structi<strong>on</strong> machinery during c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the dual occupancy. Temporary fencing <strong>on</strong> the<br />

easement in this instance would <str<strong>on</strong>g>be</str<strong>on</strong>g> appropri<strong>at</strong>e as a measure th<strong>at</strong> Council can c<strong>on</strong>diti<strong>on</strong>, and<br />

following completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the dwelling, it would <str<strong>on</strong>g>be</str<strong>on</strong>g> prudent <str<strong>on</strong>g>to</str<strong>on</strong>g> undertake an inspecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the pipeline<br />

by CCTV with a copy supplied <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>council</str<strong>on</strong>g> for verific<strong>at</strong>i<strong>on</strong> prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> occup<strong>at</strong>i<strong>on</strong> certific<strong>at</strong>e.<br />

Road Opening Applic<strong>at</strong>i<strong>on</strong><br />

Drawing GD 2.6 submitted shows and descri<str<strong>on</strong>g>be</str<strong>on</strong>g>s the Traffic Management Plan as well as the<br />

sediment and erosi<strong>on</strong> c<strong>on</strong>trol measures per c<strong>on</strong>diti<strong>on</strong> 3 <str<strong>on</strong>g>of</str<strong>on</strong>g> the pre-commencement c<strong>on</strong>diti<strong>on</strong>s.<br />

N:\0504<strong>26</strong>-OMC-SR-03080-15 PEARSON AVENUE GORDON.doc/t<strong>at</strong>tam /4