23.03.2014 Views

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 1 / 21<br />

1, 3, and 5 Lynbara Avenue and<br />

12 Porters Lane, St Ives<br />

Item 1 1219/04<br />

1 April <strong>2005</strong><br />

The proposal resp<strong>on</strong>ds <str<strong>on</strong>g>to</str<strong>on</strong>g> its c<strong>on</strong>text in two ways:<br />

Scale:<br />

1. Providing a by a landscape design, which retains all significant trees and replenishes<br />

further trees, which will enhance the existing streetscape and which screens the buildings;<br />

2. Acknowledging the site and z<strong>on</strong>e opportunities in a residential building <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>temporary<br />

design largely compliant with Council’s c<strong>on</strong>trols. The site has a unique three street corner<br />

situ<strong>at</strong>i<strong>on</strong>. The proposal seeks <str<strong>on</strong>g>to</str<strong>on</strong>g> make a positive c<strong>on</strong>tributi<strong>on</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> the desired future<br />

character <str<strong>on</strong>g>of</str<strong>on</strong>g> the area.<br />

The proposed building is gener<strong>at</strong>ed by the envelope c<strong>on</strong>trols provided in LEP 194 and then refined<br />

by the bulk and scale c<strong>on</strong>sider<strong>at</strong>i<strong>on</strong>s as outlined in DCP 55. The proposal represents a significant<br />

shift <str<strong>on</strong>g>of</str<strong>on</strong>g> scale from the existing low-density development types. However, it is compliant with the 5<br />

s<str<strong>on</strong>g>to</str<strong>on</strong>g>rey height c<strong>on</strong>trol in LEP 194.<br />

The development, with its dram<strong>at</strong>ic articul<strong>at</strong>i<strong>on</strong> and generous setbacks, represents a c<strong>on</strong>sidered<br />

resp<strong>on</strong>se <str<strong>on</strong>g>to</str<strong>on</strong>g> the scale <str<strong>on</strong>g>of</str<strong>on</strong>g> neighbouring existing development. Further, the proposed buildings are <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

a scale (four and five s<str<strong>on</strong>g>to</str<strong>on</strong>g>reys) identified as appropri<strong>at</strong>e for the area under LEP 194.<br />

Built form:<br />

The design <str<strong>on</strong>g>of</str<strong>on</strong>g> the building elements, in particular the breaking <str<strong>on</strong>g>of</str<strong>on</strong>g> the building in<str<strong>on</strong>g>to</str<strong>on</strong>g> two secti<strong>on</strong>s, the<br />

variety <str<strong>on</strong>g>of</str<strong>on</strong>g> m<strong>at</strong>erials <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> used and the varied articul<strong>at</strong>i<strong>on</strong> represents high architectural quality. The<br />

facade walls are stepped in resp<strong>on</strong>se <str<strong>on</strong>g>to</str<strong>on</strong>g> site cover and setback requirements but also <str<strong>on</strong>g>to</str<strong>on</strong>g> break down<br />

the building bulk in<str<strong>on</strong>g>to</str<strong>on</strong>g> parts. The architectural elements are arranged in<str<strong>on</strong>g>to</str<strong>on</strong>g> a balanced compositi<strong>on</strong>,<br />

providing visual interest.<br />

The building alignments, parallel <str<strong>on</strong>g>to</str<strong>on</strong>g> the three roads, and the provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> visible pedestrian accesses<br />

respects and defines the road and public domain and will c<strong>on</strong>tribute <str<strong>on</strong>g>to</str<strong>on</strong>g> the character <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

streetscape.<br />

Density:<br />

The proposed density <str<strong>on</strong>g>of</str<strong>on</strong>g> the development is compliant with the density c<strong>on</strong>trol in DCP55, <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.3:1<br />

floor space r<strong>at</strong>io for residential fl<strong>at</strong> buildings. The applic<strong>at</strong>i<strong>on</strong> provides for a floor space r<strong>at</strong>io <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

1.3:1.<br />

The proposal is c<strong>on</strong>sistent with the envisaged future density <str<strong>on</strong>g>of</str<strong>on</strong>g> the area under LEP 194 and DCP<br />

55..<br />

Resource, energy and w<strong>at</strong>er efficiency:<br />

N:\0504<strong>26</strong>-OMC-PR-03117-1 3 AND 5 LYNBARA AVENUE.doc/ssegall/21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!