23.03.2014 Views

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

ordinary meeting of council to be held on tuesday, 26 april 2005 at ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ku-ring-gai Council<br />

Draft Fees & Charges <strong>2005</strong>/2006<br />

Fee Details<br />

Development - DA Referrals<br />

Development & Regul<strong>at</strong>i<strong>on</strong><br />

Page 40<br />

Fee For<br />

2004/<strong>2005</strong><br />

Fee For<br />

<strong>2005</strong>/2006<br />

Note: In additi<strong>on</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> any fee specified in general fees, the fees for referral and provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> advice in<br />

respect <str<strong>on</strong>g>to</str<strong>on</strong>g> the general terms <str<strong>on</strong>g>of</str<strong>on</strong>g> approval <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> granted by an approval body specified in secti<strong>on</strong>s<br />

91,91a and 92 <str<strong>on</strong>g>of</str<strong>on</strong>g> the Act.<br />

DA Fees - referral and advice fee - integr<strong>at</strong>ed development<br />

$250.00 $250.00<br />

(REG 100 EPA Regul<strong>at</strong>i<strong>on</strong>s).<br />

Development - Engineering<br />

Infrastructure Res<str<strong>on</strong>g>to</str<strong>on</strong>g>r<strong>at</strong>i<strong>on</strong><br />

For residential development activity - minor building activity<br />

up <str<strong>on</strong>g>to</str<strong>on</strong>g> $10,000.<br />

For residential development activity - $10,001 <str<strong>on</strong>g>to</str<strong>on</strong>g> $20,000. $65.00 $65.00<br />

For residential development activity - over $20,001.<br />

Nil<br />

$65.00 plus<br />

0.15% <str<strong>on</strong>g>of</str<strong>on</strong>g> building<br />

value.<br />

Nil<br />

$65.00 plus<br />

0.15% <str<strong>on</strong>g>of</str<strong>on</strong>g> building<br />

value.<br />

Commercial demoliti<strong>on</strong>s $770.00 $770.00<br />

Residential demoliti<strong>on</strong>s $275.00 $275.00<br />

All commercial development activities.<br />

Miscellaneous Engineering Assessment Fees<br />

$65.00 plus<br />

0.25% <str<strong>on</strong>g>of</str<strong>on</strong>g> building<br />

value.<br />

$65.00 plus<br />

0.25% <str<strong>on</strong>g>of</str<strong>on</strong>g> building<br />

value.<br />

Flood/S<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er Study (per hour - minimum 1 hour). $110.00 $110.00<br />

Onsite S<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er Detenti<strong>on</strong> Plan (reassessment fee). $110.00 $110.00<br />

Plan Assessment & Inspecti<strong>on</strong> Fee<br />

Engineering plan assessment and works inspecti<strong>on</strong> fees<br />

(external <str<strong>on</strong>g>to</str<strong>on</strong>g> site) footp<strong>at</strong>hs per metre (minimum $85).<br />

Engineering assessment and works inspecti<strong>on</strong> fees (<strong>on</strong>site)<br />

special structures (per structure).<br />

$11.00 $11.00<br />

$165.00 $165.00<br />

Traffic management plan (DA's) assessment fee. $165.00 $165.00<br />

Engineering plan assessment and works inspecti<strong>on</strong> fees.<br />

Detenti<strong>on</strong> structures and special facilities 50 m2 <str<strong>on</strong>g>of</str<strong>on</strong>g> s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage.<br />

Engineering plan assessment and works inspecti<strong>on</strong> fees<br />

(works external <str<strong>on</strong>g>to</str<strong>on</strong>g> site). Drainage pipelines per metre<br />

(minimum $85.00).<br />

Engineering plan assessment and works inspecti<strong>on</strong> fees.<br />

Interallotment drainage per metre (minimum $85.00).<br />

Engineering plan assessment and works inspecti<strong>on</strong> fees.<br />

Part road c<strong>on</strong>structi<strong>on</strong> per metre (minimum $85.00) (ie;<br />

road shoulder/kerb and gutter).<br />

Engineering plan assessment and works inspecti<strong>on</strong> fees.<br />

Drainage structures (ie; pits etc) each.<br />

Engineering plan assessment and works inspecti<strong>on</strong> fees.<br />

New road c<strong>on</strong>structi<strong>on</strong> per metre (minimum $550.00).<br />

$165.00 $165.00<br />

$22.00 $22.00<br />

$22.00 $22.00<br />

$22.00 $22.00<br />

$94.00 $94.00<br />

$55.00 $55.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!