Ordinary Meeting ong>ofong> Council - 26 April 2005 1 / 14 1, 3, and 5 Lynbara Avenue and 12 Porters Lane, St Ives Item 1 1219/04 1 April 2005 Accordingly, while the development may result in the surrounding road network ong>beong>coming statistically busier in terms ong>ofong> increased traffic movements, the development is not expected ong>toong> create any additional traffic problems in the surrounding road network. Construction Management A detailed construction management plan must ong>beong> submitted for review by Council Engineers prior ong>toong> the commencement ong>ofong> any works on site (Condition No. 52). Vehicle Access and Accommodation layout Proposed vehicle access and accommodation arrangements have ong>beong>en assessed against the Australian Standard 2890.1 2004 – “Off street Car Parking” and Council DCP 43 – “Carparking”. The following table summarises Development Engineers assessment ong>ofong> the proposed parking arrangements against the Australian Standard 2890.1 - “Off-street car parking”: Aspect Comment Dimensions ong>ofong> spaces Satisfacong>toong>ry Circulation aisle widths Satisfacong>toong>ry for less than 30 vehicle movements per hour Blind aisle space dimensions Satisfacong>toong>ry Circulation ramps Single width ramps satisfacong>toong>ry for less than 30 vehicle movements per hour and subject ong>toong> convex mirrors placed at strategic location ong>toong> signal presence ong>ofong> vehicles. Detail ong>toong> ong>beong> provided on Construction Certificate plans (Condition No. 96). Entrance driveway location Satisfacong>toong>ry Sight distances at driveway exit Satisfacong>toong>ry Entrance driveway widths Satisfacong>toong>ry Entrance driveway grades Height clearance in parking area N:\050426-OMC-PR-03117-1 3 AND 5 LYNBARA AVENUE.doc/ssegall/14 Satisfacong>toong>ry To ong>beong> shown on Construction Certificate plans Minor amendments ong>toong> the parking layout will ong>beong> addressed through the imposition ong>ofong> suitable engineering conditions ong>ofong> consent. These conditions will require the necessary minor modifications ong>toong> the parking layout (ong>toong> ong>beong> shown on the Construction Certificate plans) in order ong>toong> achieve a functional design in accordance with the relevant Australian Standard 2890.1. Garbage Collection A waste song>toong>rage and collection area is required internally under Councils DCP 40 for Waste Management. This has ong>beong>en provided in the basement parking area and there is adequate provision ong>toong> ong>beong> provided for Councils waste collection vehicle ong>toong> enter the subject site, collect the garbage and then exit the site.

Ordinary Meeting ong>ofong> Council - 26 April 2005 1 / 15 1, 3, and 5 Lynbara Avenue and 12 Porters Lane, St Ives Item 1 1219/04 1 April 2005 Impacts on Council Infrastructure and associated works - comments The scale ong>ofong> construction work for this site is expected ong>toong> damage the frontage footpath and road shoulder. Accordingly, the following infrastructure works will ong>beong> required (Condition No. 113): Construction ong>ofong> a fully new concrete footpath over the site frontage in Ada Avenue. Maximum crossfall ong>toong> ong>beong> 2.5% ong>toong>wards the gutter. New concrete driveway crossings from Stanley Street. Removal ong>ofong> all redundant driveway laybacks and re-instatement ong>toong> upright kerb and gutter. Replacement ong>ofong> the verge area ong>toong> turfed verge ong>beong>tween new footpath and existing kerb alignment. Although not critical ong>toong> the consent, it is recommended (subject ong>toong> approval by the Local Traffic Committee) that a Work Zone ong>beong> installed in the vicinity ong>ofong> the site ong>toong> facilitate construction related vehicles and serve in reducing construction impacts on the local network. Accordingly, a condition will ong>beong> applied that the Applicant obtain a resolution from the Traffic Committee in relation ong>toong> obtaining a work zone and proceed in accordance with any recommendation from the resolution (Condition No.110). As with all development ong>ofong> this scale, there is the direct risk ong>ofong> damage ong>toong> Council infrastructure during the course ong>ofong> the works. A $50,000 bond ong>toong> cover resong>toong>ration ong>ofong> such damage (or completion ong>ofong> incomplete works by Council) is ong>toong> ong>beong> applied (Condition No.95). Site drainage comments The submitted concept song>toong>rmwater services plans (refer plans C00 ong>toong> C01 by MPN , dated 2/11/04), have not ong>beong>en designed strictly in accordance with the Council requirements contained in Water Management DCP 47. A song>toong>rmwater retention requirement ong>ofong> 3000 litres per unit applies – and this water is ong>toong> ong>beong> used for ong>toong>ilet flushing, laundry, car washing and irrigation (as a minimum). Hence ong>toong>tal volume ong>ofong> song>toong>rage required will ong>beong> 147 m3. However, it is felt that the shortfall shown on the concept drainage plan submitted with the DA can ong>beong> addressed via suitable conditions ong>ofong> consent . Accordingly, the necessary changes are ong>toong> ong>beong> made via condition which will require the refinement and advancement ong>ofong> the concept plans ong>toong> a detail suitable for Construction Certificate issue. Flooding and Overland comments The site is located ong>toong>wards the ong>toong>p ong>ofong> the local catchment and as such the site will not ong>beong> affected by trunk flows ong>ofong> sufficient volume around the site ong>toong> cause concern. The driveway level at the property boundary shall ong>beong> set a minimum ong>ofong> 150mm above the ong>toong>p ong>ofong> the frontage kerb ong>toong> prevent inundation ong>ofong> the basement level by flows overong>toong>pping in the gutter system. Geotechnical / Structural Comments N:\050426-OMC-PR-03117-1 3 AND 5 LYNBARA AVENUE.doc/ssegall/15

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 1 / 15<br />

1, 3, and 5 Lynbara Avenue and<br />

12 Porters Lane, St Ives<br />

Item 1 1219/04<br />

1 April <strong>2005</strong><br />

Impacts <strong>on</strong> Council Infrastructure and associ<strong>at</strong>ed works - comments<br />

The scale <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> work for this site is expected <str<strong>on</strong>g>to</str<strong>on</strong>g> damage the fr<strong>on</strong>tage footp<strong>at</strong>h and road<br />

shoulder. Accordingly, the following infrastructure works will <str<strong>on</strong>g>be</str<strong>on</strong>g> required (C<strong>on</strong>diti<strong>on</strong> No. 113):<br />

C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a fully new c<strong>on</strong>crete footp<strong>at</strong>h over the site fr<strong>on</strong>tage in Ada Avenue. Maximum<br />

crossfall <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> 2.5% <str<strong>on</strong>g>to</str<strong>on</strong>g>wards the gutter.<br />

New c<strong>on</strong>crete driveway crossings from Stanley Street.<br />

Removal <str<strong>on</strong>g>of</str<strong>on</strong>g> all redundant driveway laybacks and re-inst<strong>at</strong>ement <str<strong>on</strong>g>to</str<strong>on</strong>g> upright kerb and gutter.<br />

Replacement <str<strong>on</strong>g>of</str<strong>on</strong>g> the verge area <str<strong>on</strong>g>to</str<strong>on</strong>g> turfed verge <str<strong>on</strong>g>be</str<strong>on</strong>g>tween new footp<strong>at</strong>h and existing kerb alignment.<br />

Although not critical <str<strong>on</strong>g>to</str<strong>on</strong>g> the c<strong>on</strong>sent, it is recommended (subject <str<strong>on</strong>g>to</str<strong>on</strong>g> approval by the Local Traffic<br />

Committee) th<strong>at</strong> a Work Z<strong>on</strong>e <str<strong>on</strong>g>be</str<strong>on</strong>g> installed in the vicinity <str<strong>on</strong>g>of</str<strong>on</strong>g> the site <str<strong>on</strong>g>to</str<strong>on</strong>g> facilit<strong>at</strong>e c<strong>on</strong>structi<strong>on</strong> rel<strong>at</strong>ed<br />

vehicles and serve in reducing c<strong>on</strong>structi<strong>on</strong> impacts <strong>on</strong> the local network. Accordingly, a c<strong>on</strong>diti<strong>on</strong><br />

will <str<strong>on</strong>g>be</str<strong>on</strong>g> applied th<strong>at</strong> the Applicant obtain a resoluti<strong>on</strong> from the Traffic Committee in rel<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

obtaining a work z<strong>on</strong>e and proceed in accordance with any recommend<strong>at</strong>i<strong>on</strong> from the resoluti<strong>on</strong><br />

(C<strong>on</strong>diti<strong>on</strong> No.110).<br />

As with all development <str<strong>on</strong>g>of</str<strong>on</strong>g> this scale, there is the direct risk <str<strong>on</strong>g>of</str<strong>on</strong>g> damage <str<strong>on</strong>g>to</str<strong>on</strong>g> Council infrastructure<br />

during the course <str<strong>on</strong>g>of</str<strong>on</strong>g> the works. A $50,000 b<strong>on</strong>d <str<strong>on</strong>g>to</str<strong>on</strong>g> cover res<str<strong>on</strong>g>to</str<strong>on</strong>g>r<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> such damage (or completi<strong>on</strong><br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> incomplete works by Council) is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> applied (C<strong>on</strong>diti<strong>on</strong> No.95).<br />

Site drainage comments<br />

The submitted c<strong>on</strong>cept s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er services plans (refer plans C00 <str<strong>on</strong>g>to</str<strong>on</strong>g> C01 by MPN , d<strong>at</strong>ed 2/11/04),<br />

have not <str<strong>on</strong>g>be</str<strong>on</strong>g>en designed strictly in accordance with the Council requirements c<strong>on</strong>tained in W<strong>at</strong>er<br />

Management DCP 47. A s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er retenti<strong>on</strong> requirement <str<strong>on</strong>g>of</str<strong>on</strong>g> 3000 litres per unit applies – and<br />

this w<strong>at</strong>er is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g> used for <str<strong>on</strong>g>to</str<strong>on</strong>g>ilet flushing, laundry, car washing and irrig<strong>at</strong>i<strong>on</strong> (as a minimum).<br />

Hence <str<strong>on</strong>g>to</str<strong>on</strong>g>tal volume <str<strong>on</strong>g>of</str<strong>on</strong>g> s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage required will <str<strong>on</strong>g>be</str<strong>on</strong>g> 147 m3.<br />

However, it is felt th<strong>at</strong> the shortfall shown <strong>on</strong> the c<strong>on</strong>cept drainage plan submitted with the DA can<br />

<str<strong>on</strong>g>be</str<strong>on</strong>g> addressed via suitable c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>sent . Accordingly, the necessary changes are <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

made via c<strong>on</strong>diti<strong>on</strong> which will require the refinement and advancement <str<strong>on</strong>g>of</str<strong>on</strong>g> the c<strong>on</strong>cept plans <str<strong>on</strong>g>to</str<strong>on</strong>g> a<br />

detail suitable for C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e issue.<br />

Flooding and Overland comments<br />

The site is loc<strong>at</strong>ed <str<strong>on</strong>g>to</str<strong>on</strong>g>wards the <str<strong>on</strong>g>to</str<strong>on</strong>g>p <str<strong>on</strong>g>of</str<strong>on</strong>g> the local c<strong>at</strong>chment and as such the site will not <str<strong>on</strong>g>be</str<strong>on</strong>g> affected by<br />

trunk flows <str<strong>on</strong>g>of</str<strong>on</strong>g> sufficient volume around the site <str<strong>on</strong>g>to</str<strong>on</strong>g> cause c<strong>on</strong>cern. The driveway level <strong>at</strong> the property<br />

boundary shall <str<strong>on</strong>g>be</str<strong>on</strong>g> set a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> 150mm above the <str<strong>on</strong>g>to</str<strong>on</strong>g>p <str<strong>on</strong>g>of</str<strong>on</strong>g> the fr<strong>on</strong>tage kerb <str<strong>on</strong>g>to</str<strong>on</strong>g> prevent<br />

inund<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the basement level by flows over<str<strong>on</strong>g>to</str<strong>on</strong>g>pping in the gutter system.<br />

Geotechnical / Structural Comments<br />

N:\0504<strong>26</strong>-OMC-PR-03117-1 3 AND 5 LYNBARA AVENUE.doc/ssegall/15