Dean L. Gough EMEA & ASIA PAC Pricing Process - Cummins
Dean L. Gough EMEA & ASIA PAC Pricing Process - Cummins
Dean L. Gough EMEA & ASIA PAC Pricing Process - Cummins
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Dean</strong> L. <strong>Gough</strong><br />
<strong>EMEA</strong> & <strong>ASIA</strong> <strong>PAC</strong><br />
<strong>Pricing</strong> <strong>Process</strong><br />
<strong>Cummins</strong> Power Generation<br />
Global Commercial Products
2<br />
<strong>EMEA</strong> & <strong>ASIA</strong> <strong>PAC</strong> <strong>Pricing</strong> <strong>Process</strong><br />
Objective:<br />
Deliverables:<br />
Project<br />
Team:<br />
To Define & Implement a common <strong>Pricing</strong> process / Price List<br />
for <strong>EMEA</strong> & Asia Pac distributors.<br />
� <strong>Process</strong> which reduces List price variations across regions / plants.<br />
� Common Price list / <strong>Process</strong><br />
� Optimize / Rationalize Option List Prices.<br />
� Align <strong>Pricing</strong> proposal with SOLAR requirements<br />
Scope: � Singapore plant<br />
� Kent Plant<br />
� India Plant<br />
Belt: <strong>Dean</strong> <strong>Gough</strong><br />
Sponsor: Antonio Leitao<br />
Controller: Nickson Yee /Andrew Whitehead<br />
MBB: Barry Henderson<br />
Team members: Julian Carrasco, Yee Soon Lim, Kelly Fretwell,<br />
Satish Jayram, Micah Cook, P.Sathya Veerappan (parallel project)
3<br />
Project Background<br />
���������������������<br />
$ $ � $<br />
$<br />
���������������<br />
� Distributors have access to 4 completely different price lists.<br />
� Similar Gensets available across plants with different List prices .<br />
� Similar Gensets – Different Base Specification based on source plant<br />
� The same distributor needs to trade in different currency based on source plant<br />
-European distributors order in Euros from Kent ,USD from Singapore & India plant<br />
� Different methods for discounting options<br />
� Different pricing approval / release process across regions
4<br />
Methodology<br />
After review of project scope and Project complexity –<br />
<strong>Process</strong> Redesign Road Map<br />
DISCUSSION GUIDE<br />
STAKEHOLDER<br />
VOC/VOB<br />
FMEA to identify the<br />
potential challenges /<br />
gap in achieving the<br />
project objective<br />
TRANSLATION &<br />
IMAGE KJ<br />
REQUIREMENTS<br />
ANALYSIS<br />
� 24 different Failure Modes<br />
were identified.<br />
� Key points are differences in<br />
– Base Genset specifications.<br />
– Options description<br />
– Option discout structure.<br />
– US$ & Euro price list.<br />
– Genset Nomenclature.<br />
The outputs from the FMEA were taken<br />
into consideration for preparing the<br />
Interview guide for the VOC / VOB<br />
LEAN PROCESS<br />
PROCESS<br />
REDESIGN<br />
TRANSITIONS PLANS<br />
TRAIL PROCESS<br />
SOLUTION DESIGN
5<br />
Requirements Analysis<br />
Objective Suggested Questions Pointers<br />
What are your views on the current process we use for determing and<br />
releasing List prices / Price List<br />
Too messy with Asia Pac & <strong>EMEA</strong> having different list prices<br />
and releasing prices<br />
<strong>Process</strong> to determine In your view what works well in this process<br />
at different times<br />
The region would be able to communicate the prices changes to<br />
the market<br />
Single List Price for the<br />
Same list prices for the same Genset models, irrespective of the<br />
Base Genset In your view what are the areas of improvement in the process source plant<br />
What are your views if the same genset ( base genset )has the same Great for HHP models., but would differentiating lower nodes<br />
list prices across all plants and price changes<br />
on list prices are done at the same time<br />
What are the road blocks if any you envisage if having a same List<br />
prices for the same Base Genset<br />
would be difficult<br />
What are your views on the current process we use in our region to <strong>Pricing</strong> analyst proposing price based on previous transactions<br />
determine Distributor Net prices<br />
and regional leaders providing their inputs<br />
In your view what works well in this process Have a feel for the Gross Margin for the base genset<br />
In your view what are the areas of improvement in the process Have a comparison on the Market prices<br />
<strong>Process</strong> on<br />
Have a view on the Gross margin for the complete set i.e Base<br />
determining Distributor<br />
set & options<br />
Net Prices<br />
What are your views if are DN prices are derived based on the Market<br />
prices we Interview have in the Price Trackker guide for<br />
What are the road blocks if any you envisage in having a process,<br />
where in which DN prices are primarily based on definite definite<br />
Market prices<br />
What are your views on how Option prices are being structured in our There is a possibility of the same option having different DN<br />
price list currently<br />
price<br />
VOC/VOB experience<br />
In your view what works well in this process<br />
In your views what are the areas of improvement in the process<br />
Optimizing Option<br />
What are your views on having same options prices across all the<br />
prices<br />
plants<br />
What are the road blocks if any you envisage in having a process<br />
our where in which the stakeholders same options across all the plants world<br />
having the same list price<br />
If we are to implement a common pricing process across <strong>EMEA</strong> & Asia<br />
Pac, in your view what are the identified<br />
Misc barriers<br />
If you are to design / define this common pricing proces, what would<br />
your recommendation be?<br />
DISCUSSION GUIDE<br />
STAKEHOLDER<br />
VOC/VOB<br />
Customer<br />
selection<br />
Matrix<br />
TRANSLATION &<br />
IMAGE KJ<br />
REQUIREMENTS<br />
ANALYSIS<br />
Customer Voice:<br />
1. From this project we should have a clear pricing policy<br />
i.e release date, effective dates of the price list, pricing strategy –<br />
have to be clear<br />
Any KJ Images:<br />
Not very good always errors,<br />
No time allocated properly for the list to be tested.<br />
Too many mistakes<br />
Summary: Customer Requirement(s)/Needs(s):<br />
Need for a robust<br />
process for<br />
future release of<br />
price lists<br />
LEAN PROCESS<br />
PROCESS<br />
REDESIGN<br />
Common pricing process across plants to<br />
determine DN price<br />
Transfer Images to voices<br />
using translation<br />
worksheets:<br />
TRANSITIONS PLANS<br />
TRAIL PROCESS<br />
SOLUTION DESIGN
6<br />
VOC Requirements<br />
KJ<br />
CSD at all plants need to<br />
have same process and<br />
response times<br />
Make sure we understand the<br />
maintenance implications and detailed<br />
change management process for each<br />
process option<br />
Make the price list on<br />
time and error free<br />
We require a single price<br />
announcement for prices<br />
from all our plants<br />
Common order<br />
management system for<br />
order entry across all<br />
plants<br />
Nee to ensure the orders can be<br />
entered. No conflict with KBC in<br />
Kent make sure it works for<br />
order processing in all plants<br />
It means same order process<br />
in all the plants. Would our<br />
manufacturing plant agree to<br />
this?<br />
We require a common process across plants in<br />
determining list prices<br />
Use current Kent format similar<br />
style and include some<br />
automation. Understand model<br />
availability and why we use<br />
Singapore models or Kent<br />
DISCUSSION GUIDE<br />
STAKEHOLDER<br />
VOC/VOB<br />
The base Genset specification and options<br />
available should be the same irrespective<br />
of the source plant<br />
If we have the same list prices, then<br />
this would lead to having common DN<br />
price. The reasoning is we have<br />
different cost structures across plants<br />
and our margins will vary. I understand<br />
prices is based on market requirement,<br />
but as business leaders we are<br />
responsible for margins<br />
Too many time<br />
pressures which leads<br />
to mistakes<br />
TRANSLATION &<br />
IMAGE KJ<br />
REQUIREMENTS<br />
ANALYSIS<br />
5<br />
QFD<br />
Rating as 9, 3 , 1<br />
Blue Level<br />
Common pricing<br />
process across plants<br />
to determine DN prices<br />
Options should be<br />
defined based on<br />
market requirements<br />
Require a common<br />
order entry process<br />
across all powergen<br />
plants<br />
Require a common<br />
process in defining /<br />
releasing List prices<br />
across all regions<br />
Red Level<br />
We need process to validate our market<br />
pricing data<br />
In the new process we should have clear<br />
visibility on the margins for the options<br />
Require a clear<br />
process in determining<br />
option pricing<br />
Actively manage option pricing<br />
Consistent process across all CSD<br />
groups<br />
Common order change process across all<br />
powergen plants<br />
The price lists to be released in a similar<br />
process across all regions<br />
Formulate Price list format similar to<br />
Powerquote features<br />
Customer requires that the Single price<br />
list should ensure that the transition to<br />
Solar should be smooth with no changes<br />
in Net Prices<br />
The Single price list<br />
should ensure a<br />
The new process should ensure minimum<br />
smooth transition with<br />
impact to the announced DN prices<br />
SOLAR<br />
Customer Needs (Black Level)<br />
Maximize, Minimize, or Target<br />
Functional Product Requirements<br />
T T T T T T T T T T T T T T T Competitive Products<br />
Price trackker is only an input, we cannot be<br />
basing our prices only on that basis. There<br />
are more things to consider whether we are<br />
No.1 & No.2 position and we should<br />
determine prices based on that<br />
We shouldn't be following market prices we<br />
have to "set' prices<br />
At present the DN pricing is being computed<br />
analyzed differently by various regions<br />
We donot have a consistent process to<br />
compute DN pricing both for Dollar & Euro<br />
distributors<br />
We receive market prices from various<br />
sources we need to develop a process to<br />
consolidate them<br />
The pricing data provided by the distributor<br />
doesn't really mean they are valid market<br />
prices<br />
We have to determien the options which are<br />
available in PGS, Kent & other powergen<br />
plants<br />
We have options in our price lists which are<br />
in the price lists due to legacy<br />
Distributor perception will be that they get<br />
the same option for the same price. Need to<br />
differentiate parts<br />
Option prices are historical and we are<br />
unsure of the margins<br />
Make sure (option pricing) are bein<br />
maintained and properly priced ( market<br />
pricing)<br />
Our option pricing now are internally<br />
focussed i.e what is easy for the factory, not<br />
on what is important for our customer<br />
We must know which options are most<br />
profitable and must actively manage those<br />
CSD at all plants need to have same<br />
process and response times<br />
Make sure we understand the maintenance<br />
implications and detailed change<br />
management process for each process<br />
option<br />
Need to ensure the orders can be ordered.<br />
No conflict with KBC in Kent make sure it<br />
works for order processing in all plants<br />
� Common <strong>Process</strong> to Determine DN prices<br />
� Common <strong>Process</strong> to Determine Option prices<br />
� Common <strong>Process</strong> to Convert US$ / Euro prices<br />
� Common <strong>Process</strong> in Releasing List Prices<br />
� Similar Discounting Principle<br />
LEAN PROCESS<br />
PROCESS<br />
REDESIGN<br />
We do not really want to rely on market<br />
data alone when we set prices<br />
<strong>Process</strong> to determine prices to be<br />
common across plants with detailed<br />
ownership<br />
We need to combine then rationalize<br />
options based on data<br />
Importance Rating (Customer<br />
Prioritization)<br />
Common process to determine DN prices<br />
Common process to determine Option List prices<br />
Common process to convert US$ to Euro<br />
Common process in releasing List prices<br />
Similar Discounting principle<br />
All pricing information in single location<br />
All competitor pricing in single location<br />
Consistent process in costing of Base Genset<br />
Consistent process in determing option costing<br />
Common Nomenclature across all Genset plants<br />
All options available across all Genset plants<br />
Consistent process in determing Market DN prices<br />
4 3 3 3 3 3 3 3 3 3 3 3 3 3<br />
3 9 3 3 3 3 3 3 3 3 3 3 3 3<br />
9 3 3 9 3 3 3 3 3 3 3 3 3 3<br />
6 9 9 9 3 3 3 3 3 3 3 3 3 3<br />
3 3 3 3 3 3 3 3 3 3 3 3 1 3<br />
3 3 3 3 3 3 1 1 3 3 3 3 1 3<br />
6 3 3 3 3 3 1 1 3 3 3 9 1 3<br />
3 3 3 3 3 3 1 1 3 3 3 9 1 3<br />
1 3 3 3 3 3 1 1 3 3 3 9 3 3<br />
5 3 9 9 3 3 3 3 3 3 3 3 3 3<br />
9 3 9 9 3 3 3 3 3 3 3 3 3 3<br />
8 3 9 3 3 3 3 3 3 3 3 3 3 3<br />
6 3 9 9 3 3 3 3 3 3 3 3 0 3<br />
7 3 3 3 9 3 0 0 3 3 3 3 0 3<br />
6 3 3 3 9 3 0 0 3 3 3 3 0 3<br />
4 3 3 3 9 3 0 0 3 3 3 1 0 3<br />
It means same order process in all the<br />
plants. Would our manufacturing plants<br />
3 3 3 3 9 3 0 0 3 3 3 1 0 3<br />
agree to this?<br />
Make the price list on time & error free 6 9 3 3 3 3 0 0 3 3 3 0 0 3<br />
We require a single price announcement for<br />
7 9 3 3 9 3 0 0 3 3 3 0 0 3<br />
prices from all our plants<br />
Too many time pressures which leads to<br />
6 3 3 3 9 3 0 0 3 3 3 0 0 3<br />
mistakes<br />
The base genset specification and options<br />
available should be the same irrespective of 5 9 3 3 3 9 0 0 3 3 3 3 0 3<br />
the source plant<br />
Use current Kent format similar style and<br />
include some automation. Understand<br />
6 9 9 9 3 9 0 0 3 3 3 3 0 3<br />
model availability and why we use<br />
Singapore models or Kent<br />
If we have the same list prices then this<br />
9 9 3 3 3 9 0 0 3 3 3 3 0 3<br />
would lead to having common DN prices.<br />
Alignment with Solar with 1 price change 9 9 9 9 9 9 0 0 0 0 3 3 0 0<br />
Less differences between Current DN and<br />
new DN prices<br />
If we make any changes to list prices<br />
without fully understanding distributor's use<br />
of the list prices, we may cause problems<br />
and get backlash<br />
6 9 9 9 9 3 0 0 0 0 3 3 0 0<br />
5 9 9 3 3 9 0 0 0 0 3 3 0 0<br />
In the new process, the DN prices should<br />
have minimum impact as we have already<br />
3 9 9 9 9 9 0 0 0 0 1 3 0 0<br />
revised our prices twice in 2008<br />
Our distributors should be trained on the<br />
new process so they have minimum impact<br />
1 3 3 3 3 9 0 0 0 1 3 0<br />
during transition<br />
Relative Importance (Priorities) 837 825 801 753 675 172 172 375 375 439 436 150 375<br />
Our Product (Singapore GOMS)<br />
Competitve<br />
Benchmarks<br />
Target Range (with Units)<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
Common process in Market option pricing<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
<strong>Process</strong> Deliverable<br />
TRANSITIONS PLANS<br />
TRAIL PROCESS<br />
SOLUTION DESIGN
7<br />
Implementation Plan<br />
� Price List Base Genset specifications will be as per the agreed<br />
specifications which was part of the SOLAR pre-work.<br />
� If SOLAR provides for an option to be deselected, the option will be<br />
provided with a Price reduction selection<br />
� Only a single conversion factor can be used from $ - � ($ is the base line)<br />
� Only 1 discount factor applied across options and base genset.<br />
� "Similar" products from cross source plant have the same LIST price.<br />
� Distributor friendly tool to increase cross plant sourcing<br />
DISCUSSION GUIDE<br />
STAKEHOLDER<br />
VOC/VOB<br />
TRANSLATION &<br />
IMAGE KJ<br />
REQUIREMENTS<br />
ANALYSIS<br />
LEAN PROCESS<br />
PROCESS<br />
REDESIGN<br />
TRANSITIONS PLANS<br />
TRAIL PROCESS<br />
SOLUTION DESIGN
8<br />
Solution Design<br />
Requirement<br />
QFD<br />
<strong>Process</strong> to Determine<br />
DN prices<br />
Common <strong>Process</strong> to<br />
Convert US$ / Euro<br />
prices<br />
Common <strong>Process</strong> to<br />
Determine Option prices<br />
<strong>Process</strong> to Determine<br />
DN prices<br />
Common <strong>Process</strong> in<br />
Releasing List Prices<br />
Issue / Challenge<br />
Multiple price lists , in various excel<br />
formats with different list pricing and<br />
discount rules.<br />
We can only have a single $ - �<br />
conversion factor. With no further<br />
adjustment for currency conversion.<br />
Minimal impact to distributor<br />
current DN.<br />
Solar requirement of Base Genset<br />
specification for preconfigured build<br />
Euro Customers currently transact<br />
as follows –<br />
Kent - � , PGS -$ and India $<br />
Alignment of <strong>EMEA</strong> & Asia Pac<br />
pricing process. With common<br />
reviews and release.<br />
Solution<br />
Implemented<br />
Introduce new single global price<br />
list. PQ2009 to cover UK, India,<br />
GTEC and Singapore<br />
Use discounts tool to maintain<br />
single discount from list. Adjust<br />
option pricing to align for 1<br />
discount<br />
Change our Std Base Build<br />
offering of price list to match<br />
already defined SOLAR Base Build<br />
<strong>Pricing</strong> tool with conversion factor<br />
to achieve current DN from all<br />
plants. With minimal impact ton<br />
distributor pricing<br />
Price process and Price review<br />
proposal. Introduce new rules on<br />
price changes for <strong>EMEA</strong> & A<strong>PAC</strong><br />
VIEW<br />
SLIDE 17<br />
Link removed<br />
SLIDE 18<br />
Link removed<br />
Link Removed
9<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
Key Action Items<br />
No Actions<br />
Implementation<br />
View<br />
Communication at powergen council and<br />
ADAC meeting.<br />
Communication to Distributors of new<br />
Power Quote Version. BDM meetings to<br />
ensure consistent message to distribution<br />
Price List Pilot (BDM + selected PG<br />
leaders) .<br />
Provide clear instruction on how to<br />
manage transition of price lists<br />
Communicate New discounts to all<br />
OMCS Teams<br />
Presentation slides presented at both meetings.<br />
Ensure distributor leadership understands why we<br />
are changing.<br />
Marketing Bulletin to distributors with explanation<br />
of new discounting principal. Ensure all BDM’s are<br />
well aware of the reasons<br />
Use trial period to log all necessary changes for<br />
future price release. Second revision is due for<br />
release Feb 2009 after feedback.<br />
Current acknowledged orders will remain with<br />
price (+ current announced increase) and<br />
specification . All new orders will be in line with<br />
new std specification from release date<br />
Creation of Macro based tool to select distributor<br />
plant, main source plant and payment terms.<br />
Release and document control.<br />
Link Removed<br />
Link Removed<br />
Link Removed
10<br />
Benefits / Savings<br />
Savings as a result of project<br />
� Additional specification in Base Genset<br />
Model for the Gensets sourced from<br />
Singapore & India plant in 2009.<br />
� For each commercial region, the standard<br />
Base Genset increased. More value and<br />
ultimately more revenue per product sold<br />
Benefits to the Business<br />
Future Projects<br />
Proposed a SFSS project - this to<br />
work with Supplier to have the best<br />
value and fit for purpose part across<br />
our global products.<br />
Significant Cost differential between<br />
Kent and Singapore for “similar”<br />
components<br />
Base Genset specifications across all the plants ,changed to be in line<br />
with Solar std specifications. Distributors understand and accept new<br />
base specification.<br />
Created a base US Dollar price list, and created Euro price list with a<br />
single conversion factor , the discount factors for the Euro had minimum<br />
change in the communicated DN prices<br />
Created a pricing tool to ensure similar Gensets of different Genset<br />
nomenclature had same List prices & discount factors.
11<br />
Positioning the Solution – Evolution<br />
- Low<br />
Complexity<br />
One price list, same<br />
discount<br />
Product Discounts<br />
Across less<br />
product groups<br />
IT COMPLEXITY<br />
PRICING SOLUTION<br />
+ Unique Price<br />
per distributor<br />
rationalisation<br />
- Same price all<br />
distributors<br />
SINGLE PRICE<br />
LIST<br />
$ Based<br />
Kent $<br />
Kent �<br />
Sing $<br />
India $<br />
• Rationalise options<br />
• Consolidate LIST PRICE<br />
• Understand price position<br />
+<br />
Complex<br />
IT<br />
Solution<br />
WHERE WE<br />
ARE TODAY
12<br />
Acknowledgement<br />
Team: Special thanks for the hard work<br />
Key to the success of this projects was running a<br />
Parallel Project led by P.Sathya Veerapan.<br />
Julian Carrasco for the additional Macro work required for the<br />
Excel tools.<br />
Yee Soon Lim for Asia Pac local pricing work and computing &<br />
consolidating the pricing tool.<br />
Kelly Fretwell for <strong>EMEA</strong> pricing inputs<br />
Peter Horton for overall strategy and positioning<br />
Micah Cook and Satish Jayram for keeping us connected<br />
with SOLAR<br />
Sponsor: Antonio Leitao<br />
MBB: Barry Henderson