17.03.2014 Views

DVP-ES2-EX2-SS2-SA2-SX2-Operation Manual

DVP-ES2-EX2-SS2-SA2-SX2-Operation Manual

DVP-ES2-EX2-SS2-SA2-SX2-Operation Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>DVP</strong>-<strong>ES2</strong>/<strong>EX2</strong>/<strong>SS2</strong>/<strong>SA2</strong>/<strong>SX2</strong>/SE <strong>Operation</strong> <strong>Manual</strong> - Programming<br />

4. When DABSR instruciton executes, servo ON (SON) and ABS data transmission mode are<br />

driven for output.<br />

5. By “transmission ready” and “ABS request” signals, users can confirm the transmitting and<br />

receiving status of both sides as well as processing the transmission of the 32-bit ABS position<br />

data and the 6-bit check data..<br />

6. Data is transmitted by ABS (bit0, bit1).<br />

7. This instruction is applicable for servo drive with absolute position check function, e.g.<br />

MITSUBISHI MR-J2-A.<br />

8. Select one of the following methods for the initial ABSR instruction:<br />

• Execute API 156 ZRN instruction with reset function to complete zero return.<br />

• Apply JOG function or manual adjustment to complete zero return, then input the reset<br />

signal to the servo. Please refer to the diagram below for the wiring method of reset<br />

signal. For the detailed wiring between <strong>DVP</strong>-PLC and Mitsubishi MR-J2-A, please refer<br />

to API 159 DRVA instruction.<br />

Ex: Mitsubishi MR-J2-A<br />

reset<br />

CR 8<br />

SG 10<br />

3-362

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!