17.03.2014 Views

DVP-ES2-EX2-SS2-SA2-SX2-Operation Manual

DVP-ES2-EX2-SS2-SA2-SX2-Operation Manual

DVP-ES2-EX2-SS2-SA2-SX2-Operation Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1. PLC Concepts<br />

Scan time exception<br />

PLC can process certain items faster than the scan time. Some of these items interrupts and halt<br />

the scan time to process the interrupt subroutine program. A direct I/O refresh instruction REF<br />

allows the PLC to access I/O immediately during user program evaluation instead of waiting until<br />

the next scan cycle.<br />

1.2 Current Flow<br />

Ladder logic follows a left to right principle. In the example below, the current flows through paths<br />

started from either X0 or X3.<br />

X0<br />

X3<br />

X1 X2 Y0<br />

Y0<br />

X4<br />

Reverse Current<br />

When a current flows from right to left, which makes a reverse current logic, an error will be<br />

detected when compiling the program. The example below shows the reverse current flow.<br />

X0 X1 X2 Y0<br />

Y0<br />

X3 a X4 X5<br />

b<br />

X6<br />

1.3 NO Contact, NC Contact<br />

NO contact<br />

NC Contact<br />

Normally Open Contact, A contact<br />

Normally Closed Contact, B contact<br />

1-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!