Legacy Project<br />
Project Progress<br />
• The first infrastructure measures in the areas of<br />
water supply, electricity and road construction, as<br />
well as the first drilling activities, were undertaken<br />
in 2011.<br />
• About 120 employees from different countries are<br />
currently working at <strong>K+S</strong> Potash Canada GP on the<br />
construction of the new site. By 2023, more than<br />
300 jobs should be created.<br />
• In 2012, we anticipate an investment volume of<br />
CAD 200 million (about € 160 million), which will<br />
continue to be used for infrastructure measures<br />
and water supply, as well as engineering work and<br />
drilling.<br />
• In 2013, the investment level should reach<br />
CAD 830 million* (a good € 640 million) and be<br />
used for drilling and the start of the factory’s<br />
construction.<br />
* There may still be considerable shifts in the allocation of expenditure to the investment periods<br />
January 2013 <strong>K+S</strong> Group 61