Legacy Project<br />

Project Progress<br />

• Further infrastructure measures in the areas of<br />

water supply, electricity and road construction, as<br />

well as the completion of first drilling activities, were<br />

undertaken in 2012.<br />

• About 130 employees from different countries are<br />

currently working at <strong>K+S</strong> Potash Canada GP on the<br />

construction of the new site. By 2023, more than<br />

300 jobs should be created.<br />

• In 2012, we spent an investment volume of € 143<br />

million, which was used for infrastructure measures<br />

and water supply, as well as engineering work and<br />

drilling.<br />

• In 2013, the investment level should reach<br />

CAD 500 million* and be used for drilling and the<br />

start of the factory’s construction.<br />

June 2013 * There may still be considerable shifts in the allocation of expenditure to the investment periods<br />