16.03.2014 Views

USE20120001 (1 of 3 - City and Borough of Juneau

USE20120001 (1 of 3 - City and Borough of Juneau

USE20120001 (1 of 3 - City and Borough of Juneau

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Planning Commission<br />

File No.: USE2011 0003<br />

April 22, 2011<br />

Page 9 <strong>of</strong>9<br />

7. Will the proposed development comply with the Alaska Coastal Management Program?<br />

As discussed in the staffreport, the applicant is in the early stages <strong>of</strong>completing the Alaska<br />

Coastal Management Program (ACMP) project questionnaire <strong>and</strong> a determination has not yet<br />

been made regarding whether a consistency review under the ACMP is necessary.<br />

RECOMMENDATION<br />

It is recommended that the Planning Commission adopt the Director's analysis <strong>and</strong> findings, <strong>and</strong><br />

grant the requested Conditional Use permit for the development <strong>of</strong>the proposed church, subject to<br />

the following conditions:<br />

1. A two-way left tum lane, as recommended in the project Traffic Impact Analysis <strong>and</strong> as<br />

designed on the applicant's site plan, shall be installed prior to issuance <strong>of</strong>a Certificate <strong>of</strong><br />

Occupancy or Temporary Certificate <strong>of</strong>Occupancy.<br />

2. The southern site driveway shall be signed to prohibit left turns out <strong>of</strong>the facility prior to<br />

issuance <strong>of</strong>a Certificate <strong>of</strong>Occupancy or Temporary Certificate <strong>of</strong> Occupancy.<br />

3. If an Alaska Department <strong>of</strong> Transportation <strong>and</strong> Public Facilities permit or review process<br />

results in a modification <strong>of</strong> the project design, the applicant shall contact the CBJ<br />

Community Development Department Director to determine ifadditional review bythe CBJ<br />

Planning Commission will be necessary.<br />

4. Ifa US Army Corps <strong>of</strong>Engineers permit or review process results in a modification <strong>of</strong>the<br />

project design, the applicant shall contact the CBJ Community Development Department<br />

Director to determine if additional review by the CBJ Planning Commission will be<br />

necessary.<br />

5. The l<strong>and</strong>scaping as shown on the applicant's site plan shall be installed prior to the issuance<br />

<strong>of</strong>a Certificate <strong>of</strong>Occupancy.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!