14.03.2014 Views

819 Injection Module User's Guide (PDF) - John Morris Scientific

819 Injection Module User's Guide (PDF) - John Morris Scientific

819 Injection Module User's Guide (PDF) - John Morris Scientific

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix<br />

E<br />

Using an Additional <strong>819</strong> <strong>Module</strong> for Fraction Collection<br />

At Initialization<br />

The default position for the second <strong>819</strong> valve is the<br />

INJECT (collect) position. Before samples can be<br />

injected, the <strong>819</strong> collection valve must be toggled<br />

from the INJECT (collect) position to the LOAD<br />

(drain) position. To change the valve to the LOAD<br />

(drain) position, use the Manual Injector Control<br />

dialog in the Operations window. Or, you can add<br />

the Set Low Pressure Valve command to the start<br />

of the control method or to a startup method to<br />

ensure that the valve will be in the correct position<br />

at the start of the run. Refer to the examples on the<br />

next page.<br />

E-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!