819 Injection Module User's Guide (PDF) - John Morris Scientific
819 Injection Module User's Guide (PDF) - John Morris Scientific
819 Injection Module User's Guide (PDF) - John Morris Scientific
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Installation 2<br />
Adjusting the Liquid Handler’s Z-Arm Height<br />
If you are using a 215 SW Liquid Handler<br />
The 215 SW Setup Utility is supplied on the 215 SW<br />
Utility Programs CD-ROM supplied with your 215<br />
SW Liquid Handler.<br />
1 Start the 215 SW Setup Utility.<br />
2 To position the probe over the injection port,<br />
click Move to Port.<br />
3 To see if the probe’s Z height is aligned<br />
correctly, slide a small piece of paper between<br />
the probe’s tip and the injection port. The probe<br />
is aligned if the top of the paper catches the tip<br />
of the probe when you position the paper<br />
between the probe and the injection port.<br />
4 If the probe is not aligned, click on or to<br />
move the probe.<br />
5 When the probe is aligned, click Ok to store the<br />
new alignment in the liquid handler’s memory.<br />
5 Click on the About tab then Exit to close the<br />
215 SW Setup Utility.<br />
Note: If the probe requires adjustment along the X-<br />
or Y-axis, use the Adjust XY tab.<br />
2-18