13.03.2014 Views

Bully Dog 40300 Computer Chip Programmer Installation ... - Jegs

Bully Dog 40300 Computer Chip Programmer Installation ... - Jegs

Bully Dog 40300 Computer Chip Programmer Installation ... - Jegs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PMT INSTALLATION<br />

Post-turbo MOUNT<br />

1. Find a location on the exhaust pipe that is 3-6”<br />

downstream from the turbo charger output. Then<br />

drill a 5 /16” hole and run a 1 /8” pipe tap into the hole.<br />

Mount the Pyrometer Probe in the threaded hole<br />

using a 9 /16” wrench to tighten the probe holder or<br />

tube fitting to the down tube. Then tighten the<br />

Pyro Probe Cap to the holder using a 5 /8” wrench.<br />

2. Run the Pyro Cable along the brim of the engine<br />

bay, and then let the end sit when installing the<br />

PCH Board.<br />

Dodge Post-turbo Mount<br />

Securing pyro line<br />

Pyro line secured<br />

Introduction Parts Description PMT <strong>Installation</strong><br />

Operating Instructions Internet Updates Appendix<br />

22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!