11.03.2014 Views

NATO UNCLASSIFIED NATO UNCLASSIFIED - Ixarm

NATO UNCLASSIFIED NATO UNCLASSIFIED - Ixarm

NATO UNCLASSIFIED NATO UNCLASSIFIED - Ixarm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NATO</strong><br />

<strong>UNCLASSIFIED</strong><br />

NC3A-BElACQ/ASRC/081295<br />

14 March 2008<br />

To:<br />

See Distribution List<br />

Subject:<br />

References:<br />

Notification of Intent to Invite Bids for the Implementation of the<br />

project "Provision of Voiceldata Equipment, Spectrum Management<br />

Capability and Guard Tower Connectivity At Kandahar Airfield<br />

(I(AF- ISAF)"<br />

IFB CO-12520-OPL<br />

A- ACl4-D(2007)0003 Alliance Operations and Missions International<br />

Competitive Bidding<br />

B- ACl4-DS(2008)0002<br />

C- AC/4(PP)D/25747-ADD6-REVl<br />

1. The NC3A intends, in accordance with reference (A), to invite bids for the Procurement<br />

of "Voiceldata Equipment, Spectrum Management Capability and Guard Tower Connectivity<br />

At Kandahar A~rfield (KAF- ISAF)".<br />

2. An overview of the requirements for this Invitation For Bid (IFB) is summarised in<br />

attachment A hereto.<br />

3. The reference for the Invitation for Bid is IFB- CO-12520-OPL, and all correspondence<br />

concerning this IFB should reference this number.<br />

4. The scope of work for this project has been authorised by reference (B) as<br />

recommended by reference (C). The estimated value of this project is 7,386,519 Euro.<br />

5. The project will be carried out under the Acquisition Division Programme of Work<br />

NSP0001842.<br />

6. NC3A was authorised to use the Alliance Operations and Missions (AOM) International<br />

Competitive Bidding (ICB) Procedure, lowest price technically compliant Procedures. The<br />

successful bid pursuant to this SFB will be that bid which is the lowest price technically<br />

compliant in accordance with the evaluation criteria.<br />

7. It is planned to place a single contract for the entire scope of work. No partial bidding<br />

will be allowed.<br />

8. The IFB is planned to be issued by April 2008 with a Bid Closing Date in May 2008<br />

and contract award in June 2008.<br />

<strong>NATO</strong><br />

<strong>UNCLASSIFIED</strong>


<strong>NATO</strong><br />

<strong>UNCLASSIFIED</strong><br />

9. Bidders will be required to declare a bid validity of 6 months from closing date for<br />

receipt of bids. Should the selection and award procedure exceed the 6 month after Bid<br />

Closing Date, firms will be requested to voluntarily extend the validity of their bids<br />

accordingly. Bidders may decline to do so, withdraw their bid and excuse themselves kom<br />

the bidding process without penalty.<br />

10. The project is required to be completed by the end of 2008.<br />

11. In addition with the firms nominated in Annex A of this letter, it is requested that NC3A<br />

be provided with a list, not later than 04 April 2008, of qualified and certified firms which<br />

may be interested in receiving an Invitation for Bid for this project. This list should include<br />

the NAME of the FIRM, the TELEPHONE AND FAX NUMBER AND E-mail-ADDRESS<br />

AND POINT OF CONTACT within each of the nominated firms. This information is critica!<br />

to enable prompt and accurate communication with prospective bidders and should be sent to<br />

the following address:<br />

<strong>NATO</strong> C3 Agency<br />

Acquisition DivisiodASB<br />

Boulevard Leopold I11<br />

l l l0 Bruxelles<br />

BELGIUM<br />

Attn: Mr. A. Courtois , , ,<br />

TEL: +32 2 707 8233<br />

FAX: +32 2 707 8776<br />

advised that the JFB package will be <strong>NATO</strong> . , z t ' ..<br />

<strong>UNCLASSIFIED</strong>. Prospective Bidders should also be aware that contractor personnel will be<br />

called on to work at a <strong>NATO</strong> site in conjunction with the contract and such contractor<br />

personnel will be required to have security clearances to the level of "<strong>NATO</strong> SECRET".<br />

13. It is requested that all additional firms interested in participating in this procurement be<br />

introduced by their National Authorities with the required "Declaration of Eligibility" and<br />

certification of their security clearances. Requests for participation received directly from<br />

firms can not be considered.<br />

14. Your assistance in this procurement is greatly appreciated<br />

FOR THE GENERAL MANAGER:<br />

3 C<br />

Acquisition Division<br />

A- Potential Bidders list<br />

A- Summary of the requirements<br />

<strong>NATO</strong><br />

<strong>UNCLASSIFIED</strong>


<strong>NATO</strong><br />

<strong>UNCLASSIFIED</strong><br />

Distribution List<br />

<strong>NATO</strong> Delegations (Attn: Infrastructure Adviser):<br />

NC3A-BEIACQIASRCI08I295<br />

Belgium<br />

Bulgaria<br />

Canada<br />

Czech Republic<br />

Denmark<br />

Estonia<br />

France<br />

Germany<br />

Greece<br />

Hungary<br />

Italy<br />

iatvia<br />

Lithuania<br />

Luxembourg<br />

The Netherlands<br />

Norway<br />

Poland<br />

Portugal<br />

Romania<br />

Slovakia<br />

Slovenia<br />

Spain<br />

Turkey<br />

United Kingdom<br />

United States<br />

Belgian Ministry of Economic Affairs 1<br />

Embassies in Brussels (Attn: Commercial Attach&):<br />

Bulgaria<br />

Canada<br />

Czech Republic<br />

Denmark<br />

Estonia<br />

France<br />

Germany<br />

Greece<br />

Hungary<br />

Italy<br />

Latvia<br />

Lithuania<br />

Luxembourg<br />

The Netherlands<br />

Norway<br />

<strong>NATO</strong><br />

<strong>UNCLASSIFIED</strong><br />

Page 3


<strong>NATO</strong><br />

<strong>UNCLASSIFIED</strong><br />

Poland<br />

Portugal<br />

Romania<br />

Slovakia<br />

Slovenia<br />

Spain<br />

Turkey<br />

United Kingdom<br />

United States<br />

<strong>NATO</strong> HQ<br />

Director, <strong>NATO</strong> HQ C3 Staff (PRB) 1<br />

<strong>NATO</strong> Office of Resources (Management and Implementation Branch)<br />

Controller for Infrastructure<br />

1<br />

1<br />

ACO<br />

ACT<br />

Attn: ACOS J-6<br />

Attn: ACOS C4<br />

NCSA Attn: Chief, Programmes Division 1<br />

m<br />

DACQ<br />

IPT 3 ~eader (M. Murphy)<br />

Project Manager (LtCol Nickerson)<br />

NSIF' Liaison Officer (C. Ulriksen)<br />

Legal Advisor (S. Rocchi)<br />

ACQIASB Principal Contracting Officer (J. Wager)<br />

ACQJASB Contracting Officer (A. Courtois)<br />

ACQIASB Senior ILS Officer (M. Langfeld)<br />

Registry<br />

CAB Secretary<br />

NATEXs<br />

CZECH REPUBLIC<br />

DENMARK<br />

FRANCE<br />

GERMANY<br />

GREECE<br />

HUNGARY<br />

ITALY<br />

NORWAY<br />

NETHERLANDS<br />

POLAND<br />

SPAIN<br />

TURKEY<br />

UK<br />

USA<br />

<strong>NATO</strong><br />

<strong>UNCLASSIFIED</strong><br />

Page 4


, AGENCY<br />

<strong>NATO</strong> <strong>UNCLASSIFIED</strong><br />

4 - RFQ-CO-12520-OPL Bidders List<br />

BELGIUM<br />

BULGARIA<br />

CANADA<br />

CZECH REPUBLIC<br />

DENMARK<br />

FRANCE<br />

Alfa Systems NV<br />

Astron N.V.<br />

Avaya Inc.<br />

Black Box Network Products SAINV<br />

C-CURE<br />

Computer Sciences Corporation<br />

Computerland S.L.M.<br />

Cybertrust Belgium NV<br />

Damovo Belgium NVISA<br />

Dell Computer Belgium<br />

Dimension Data Belgium<br />

Dolrnen Computer Applications<br />

Dolmen NP Enterprise Communications Belgium NVISA<br />

Getronics Belgium SAINV<br />

Gillam-FE1<br />

Hewlett Packard Belgium B.V.B.A.1S.P.R.L.<br />

NextiraOne<br />

Siemens Enterprise Communications NVISA<br />

Siemens IT Solutions and Services SAlNV<br />

Simac ICT Belgium<br />

Sun Microsystems Belgium NV<br />

Telindus NV<br />

Thales Alenia Space Etca s.a.<br />

Thales S.A.<br />

Uniskill NV<br />

Verizon Business<br />

WAL-MART<br />

Electron Progress AD<br />

ATCO Frontec Corporation<br />

Dialogic Corporation<br />

EMCON Emanation Control Ltd<br />

EMS Technologies Canada Ltd<br />

General Dynamics Canada Ltd.<br />

Damovo Ceska republika s.r.0.<br />

GTS Novera a.s.<br />

SITEL, spol. S r.0.<br />

Skill s.r.0.<br />

Technisew, s.r.0.<br />

Bruhn Newtech AIS<br />

SAAB Danmark AIS<br />

CS Systemes d'lnformations<br />

EADS Defence and Security Systems S.A.<br />

Page l oi5<br />

<strong>NATO</strong> <strong>UNCLASSIFIED</strong>


<strong>NATO</strong> <strong>UNCLASSIFIED</strong><br />

, AGENCY<br />

RFQ-CO-? 2520-OPL Bidders List<br />

FRANCE<br />

GERMANY<br />

GREECE<br />

HUNGARY<br />

ITALY<br />

LATVIA<br />

LITHUANIA<br />

LUXEM BOURG<br />

NETHERLANDS<br />

France Telecom<br />

lneo DCS<br />

LGM<br />

S.I.T. SA<br />

Sagem Communication<br />

CONET Solutions GmbH<br />

EADS Deutschland GmbH(ex Dornier GmbH)<br />

FREQUENTIS Nachrichtentechnik GmbH<br />

GBS GmbH<br />

GTSl Corp.<br />

Kissling Service GmbH<br />

Lambda-Space GmbH<br />

Logica Deutschland GmbH & Co. KG.<br />

Marz Network Services GmbH<br />

ND SatCom Defence GmbH<br />

Pan Dacom Direkt GmbH<br />

Quin GmbH<br />

Roda Computer GmbH<br />

Serco GmbH<br />

T-Systems Enterprise Services GmbH<br />

Thales Defence Deutschland GmbH<br />

European Dynamics SA<br />

Info-Quest SA<br />

S~ace Hellas<br />

Albacomp CO<br />

Hubel Hungarian & Belgian Ltd.<br />

Radiant PLC<br />

Synergon lnformation Systems plc<br />

e-Selectrade-Computer Ltd.<br />

Alcatel-Lucent ltalia SpA<br />

Enterprise Ericsson SpA<br />

Page Europa S.r.L.<br />

Selex Communications S.p.A<br />

Valtellina Spa<br />

Vitrociset S.p.A.<br />

Baltic Information & Security Systems<br />

JSC FlMA<br />

Primesphere S.A.<br />

Zconnect-IT B.V.<br />

Page 2 6 5<br />

<strong>NATO</strong> <strong>UNCLASSIFIED</strong>


, AGENCY<br />

<strong>NATO</strong> <strong>UNCLASSIFIED</strong><br />

RFQ-CO-12520-OPL Bidders List<br />

..- ...-. .-. . .- - . --" , -.".<br />

Carrier to Carrier Telecom N.V.<br />

Cisco Systems International B.V.<br />

GANNEXION B.V.<br />

Getronics PinkRoccade Nederland B.V.<br />

Global Systems and Software<br />

Klein Poelhuis Voltman (KPV)<br />

Misco Nederland BV<br />

OSPL Nederland BV<br />

PQR bv<br />

PointGroup BV<br />

SurCom International BV<br />

TTEC Computers BV- Transtec AG<br />

Uni Business Centre<br />

NORWAY<br />

POLAND<br />

ROMANIA<br />

Datametrix A.S<br />

Ementor Norge AS<br />

ErgoGroup AS<br />

Kongsberg Defence & Aerospace AS<br />

Umoe IKT<br />

Vizada Networks a.s.<br />

ABG SPIN S.A.<br />

ATM S.A.<br />

Asseco Poland SA<br />

ComArch S.A.<br />

Consortia Sp. z 0.0.<br />

DGT Sp. z 0.0.<br />

Decsoft S.A.<br />

Designers S.J.<br />

Elmontex<br />

Enamor Sp. 2.0.0<br />

Military Communication Institute<br />

Optimus SA<br />

PROKOM Software S.A.<br />

Produs S.A.<br />

Qumak-Sekom S.A.<br />

S&T Services Polska Sp. z 0.0.<br />

Siltec Sp. z.o.o.<br />

Solidex S.A.<br />

Sygnity S.A.<br />

Telmont S.A.<br />

Unizeto Technologies SA<br />

WASKO Sp. zo.0. for WASKO S.A.<br />

S.C. UTI Systems<br />

Page 3 of 5<br />

<strong>NATO</strong> <strong>UNCLASSIFIED</strong>


, AGENCY<br />

<strong>NATO</strong> <strong>UNCLASSIFIED</strong><br />

RFQ-CO-12520-OPL Bidders List<br />

March i4, ZWB if 50AM<br />

SLOVAKlA<br />

SPAIN<br />

UNITED KINGDOM<br />

UNITU) STATES<br />

QUADRIQ, as.<br />

Especialidades Electricas S.A.<br />

lnformatica El Corte lngles (IECISA)<br />

Alcatel-Lucent Telecom Ltd<br />

Artemis Communications<br />

Audax<br />

Auriga (Europe)<br />

BT Global Services<br />

Black Box UK Ltd<br />

Blazepoint Limited<br />

Blue i UK Limited<br />

C7 Solutions Ltd.<br />

Drumgrange Ltd.<br />

EADS Defence & Security Systems Limited<br />

Electrosonic<br />

Fujitsu Services<br />

GGR Communications Ltd UK<br />

GigaBeam Corporation<br />

Global Crossing<br />

Logistica Telecom<br />

Mass Consultants Ltd<br />

Metrodata Limited<br />

NSSL Itd.<br />

Open Networks - Government & Defence<br />

Rockwell Collins (UK) Ltd.<br />

Secure Systems &Technologies Ltd. (SST)<br />

Sematron UK Ltd<br />

Silicon Valley Group Plc<br />

Specialist Computer Centres plc (SCC)<br />

Syg-net Ltd.<br />

Telent Communications Ltd<br />

Thales Defence Limited<br />

Applied Coherent Technology Corp.<br />

EMT, Inc.<br />

EMW, Inc.<br />

Emerging Markets Communications (EMC)<br />

Equant<br />

Globecomm Systems Inc.<br />

Hetra Secure Solutions<br />

lntelsat General Corporation<br />

L-3 Communications Titan Corporation(former Titan Corporation)<br />

LT1 DataCom Inc.<br />

ManTech Global Services Corporation<br />

Millennium Data Systems, Inc.<br />

Page 4 of 5<br />

<strong>NATO</strong> UNCLASSIFIW


<strong>NATO</strong> <strong>UNCLASSIFIED</strong><br />

RFQ-CO-12520-OPL Bidders List<br />

UNITED STATES<br />

NET Federal, Inc.<br />

SAlC<br />

Segovia Inc<br />

Sprint Communications Company, L.P<br />

TranTech Inc.<br />

Unisys Corporation<br />

Page 5 of 5<br />

<strong>NATO</strong> <strong>UNCLASSIFIED</strong>


I. Background<br />

?J - Project Scope of Work Summary<br />

The operational requirement for the voice system is for the provision of fixed switched telephone capability<br />

connected to the <strong>NATO</strong> Core Network (NCN) to be deployed in Kandahar Air field (KAF).<br />

In addition, regarding the Data system, the majority of the KAF (Kandahar Airfield) users are currently<br />

served via a temporary solution. This project will initially provide the LAN access layer (switches and<br />

cabling), and fibre Network Interface Cards (NICS) for 335 workstations which are expected to migrate to<br />

the current nodes or 4 additional Area Distribution Nodes (ADN), which are fibre based. + Gy;JKc'. 1 -.F<br />

&@"l<br />

Finally, the project will include fixed line voice capability to enhance the radio voice capability at the guard<br />

towers, as well as data connectivity to increase information exchange.<br />

2. Scope of work<br />

Voice System: This project will expand the Phase 1 Voice solution by 4 additional nodes to support KAF<br />

expansion in the North and South portions of the airfield. The expansion will include the addition of the<br />

expansion shelves to the Phase I architecture Siemens Hipath 4000 voice switch.<br />

In addition, the voice equipment will be replaced by the voice equipment procured through this project. The<br />

replacement will include new user voice instruments, using existing copper cabling where available.<br />

Data System: This project will expand the Phase 1 MANILAN data solution by 4 additional nodes to<br />

support KAF expansion in the North and South portions of the airfield. The expansion will include the<br />

addition of the data switches to the Phase 1 architecture (SAGEM SHD Node), which is based on large and<br />

medium CISCO network switches for the key CIS backbone architecture and small (Local Area Network<br />

(LAN)) switches to support building network solutions. , s a" ITVLVK -.LgoLLZ 6 cxd'tJY~~i.<br />

In addition, some data equipment will be replaced by the data equipment procured through this project.<br />

Voice and Data Capability to the KAF Watch Towers: The existing voice and data systems shall he<br />

expanded to meet KAF Watch Tower requirements, not covered under Phase 1 implementation of the<br />

project. The cabling to the Watch Towers will be integrated as much as possible with any other civil works<br />

required under pending engineering PSRs for KAF Perimeter Expansion and Watch Tower upgrades or<br />

replacements.<br />

Approximately thirty eight (38) watch tower locations (including ECPs) shall be provided with voice, data<br />

and cabling during Phase 2.<br />

The on site installation and testing for the areas mentioned above are part of the scope of this project.<br />

Spectrum Management Capabilitv:<br />

This project shall deliver a Spectrum Analysis and Management system to meet the Military Requirements<br />

for KAF. No Spectrum Management capability was delivered initially. The spectrum analysis and<br />

management capability shall consist of:<br />

Spectrum Analysis for KM, and a training system for Brunssum.<br />

Spectrum Management for KAF to be tied into an ISAF-wide system<br />

The main part of the project will be the achievement of the Data system requirements.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!