08.03.2014 Views

Angewandte Regelung und Optimierung in der ... - uni-stuttgart

Angewandte Regelung und Optimierung in der ... - uni-stuttgart

Angewandte Regelung und Optimierung in der ... - uni-stuttgart

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Pump & Valve schedul<strong>in</strong>g<br />

Results from the case study<br />

© ABB Group<br />

June 28, 2010 | Slide 76<br />

• 7 days optimization<br />

• Only Pump and valve schedul<strong>in</strong>g, no WTW *<br />

schedul<strong>in</strong>g<br />

• Reservoir level limits (40%-95%)<br />

• Fixed WTW outflows<br />

• Initial start<strong>in</strong>g values for reservoir levels:<br />

(M<strong>in</strong>+Max)/2<br />

For 7 days<br />

Pump<strong>in</strong>g Energy [kW/h] Pump<strong>in</strong>g Costs [£]<br />

Current<br />

Operation<br />

Optimized<br />

Operation<br />

Current<br />

Operation<br />

Optimized<br />

Operation<br />

Total 51902 35901 3817 2483<br />

Sav<strong>in</strong>gs 16001 1334<br />

Sav<strong>in</strong>gs [%] 30.8 34.9<br />

*Water Treatment Work

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!