Angewandte Regelung und Optimierung in der ... - uni-stuttgart
Angewandte Regelung und Optimierung in der ... - uni-stuttgart
Angewandte Regelung und Optimierung in der ... - uni-stuttgart
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Pump & Valve schedul<strong>in</strong>g<br />
Challenges <strong>in</strong> Network Operation<br />
• Generate optimized pump, valve and water source trajectories to<br />
m<strong>in</strong>imize energy costs, source costs and leakage <strong>in</strong> WDN*<br />
• look 24 hours ahead to know what the water demand, the<br />
electricity tariffs and the treatment costs will be<br />
• use full range of possible water levels <strong>in</strong> reservoirs to fill<br />
reservoirs when it fits best to optimization strategy<br />
• withdraw water from water sources <strong>in</strong> an cost-optimal way,<br />
tak<strong>in</strong>g <strong>in</strong>to account operational constra<strong>in</strong>ts<br />
• operate pumps tak<strong>in</strong>g <strong>in</strong>to account actual and future electricity<br />
costs, consi<strong>der</strong><strong>in</strong>g pump efficiencies to choose optimal pump<br />
speed<br />
• BUT: always keep with<strong>in</strong> physical and operational constra<strong>in</strong>ts,<br />
such as ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g sufficient water with<strong>in</strong> the system’s<br />
reservoirs or meet<strong>in</strong>g the required time-vary<strong>in</strong>g consumer<br />
demands<br />
© ABB Group<br />
June 28, 2010 | Slide 72<br />
*Water Distribution Network