08.03.2014 Views

Download the Caledonian Ward improvement plan

Download the Caledonian Ward improvement plan

Download the Caledonian Ward improvement plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Carnoustie Drive traffic management<br />

Category: Transport and streetscape<br />

Sub-category: Streetscape<br />

Priority: 1 - High<br />

Approx cost: £400,000<br />

Funds secured: £0<br />

Re-paving Freeling and Tilloch Sts and 'Carnoustie<br />

Square' for <strong>the</strong> 'Bemerton Green Market<br />

pedestrianised area' with artificial stone paving. Project<br />

was identified on pages 38-39 of <strong>the</strong> Bemerton Links<br />

and Spaces Report (BLiS) report in 2009. (Note:<br />

Tilloch Street is pedestrianised but requires paving<br />

upgrade.)<br />

Cost for paving is approximately £350k, and cost for<br />

providing a power supply for <strong>the</strong> market is to be<br />

confirmed.<br />

To support <strong>the</strong> wider 'BLiS' project to improve<br />

pedestrian permeability through and safety in and<br />

around <strong>the</strong> Bemerton Estate.<br />

Improving <strong>the</strong> Cally Economy<br />

Category: Community facilities<br />

Sub-category: Community support funding<br />

Priority: 1 - High<br />

Approx cost: £30,000<br />

Funds secured: £0<br />

Measures to improve <strong>the</strong> local economy on <strong>the</strong><br />

<strong>Caledonian</strong> Road to support new businesses and<br />

nurture existing in retail and services; mitigate <strong>the</strong><br />

effect of empty shops; market <strong>the</strong> Cally offer to<br />

residents and to workers in businesses south of <strong>the</strong><br />

Canal and future workers at Kings Cross Central.<br />

Thornhill Square - perimeter fencing<br />

Category: Open space / green space<br />

Sub-category: Parks<br />

Priority: 1 - High<br />

Approx cost: £220,000<br />

Funds secured: £0<br />

Secure park perimeter by replacing damaged sections<br />

of railing; major repairs to paths; new turf; drainage to<br />

informal football area; play <strong>improvement</strong>s.<br />

Thornhill Square is an important historical square<br />

and forms a keystone in our portfolio of classical<br />

London squares. It has fallen into disrepair and has<br />

serious issues of poor accesibility. Both <strong>the</strong> play<br />

area and kick-about area are tired and underused<br />

(<strong>the</strong> football area urgently requires drainage). The<br />

railings are a very important historical asset and<br />

need to be repaired. Park is under-used even<br />

though surrounded by large housing estates and<br />

could, with investment, serve <strong>the</strong>se estates very<br />

well as an important quieter recreation space.<br />

24 June 2013 Page 36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!