07.03.2014 Views

Introduction.

Introduction.

Introduction.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Workshop PG5<br />

Project management<br />

6.5 General structure of an SB<br />

Initial STEP<br />

Transition<br />

STEP<br />

Sequential blocks are built out of different elements which are called:<br />

Initial Step<br />

Step<br />

Transition<br />

SB’s start with an Initial STEP. When you call the SB for the very first time, then the<br />

SB will execute the program code inside the Initial Step.<br />

6.6 Basic rule: Alternate STEPS & Transitions<br />

Sequential blocks have a strict syntax.<br />

A sequential block always starts with an “Initial Step”<br />

Thereafter transitions and steps must alternate all the time.<br />

You must never have two Steps or two Transitions in a row.<br />

Right<br />

Wrong<br />

In contrast to other PLC's, SAIA PCD’s have implemented the SequentialBlockengine<br />

in the firmware which makes the sequential blocks extremely fast.<br />

PG5-06-E.doc © Saia-Burgess Controls Ltd. Page 6-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!