07.03.2014 Views

CombiFlash Torrent® User Manual - Isco

CombiFlash Torrent® User Manual - Isco

CombiFlash Torrent® User Manual - Isco

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CombiFlash</strong> Torrent® <strong>User</strong> <strong>Manual</strong><br />

2.10 Install Optional Equipment<br />

The installation of optional equipment that was electrically<br />

connected to the Torrent in section 2.4 should be completed<br />

now. Review the options below and complete as necessary.<br />

2.10.1 Optional Sample Load Pump<br />

1. Position the Sample Load Pump on top or near the Torrent.<br />

2. Connect the tubing between the pump outlet (from the<br />

bottom of the pump head) and the Torrent’s sample<br />

injection port (Figure 1-1, item 9).<br />

3. Configure the Sample Load Pump by placing either the<br />

plastic cartridge reservoir or the tubing with the weighted<br />

end on the pump inlet (Figure 2-3).<br />

Cartridge Reservoir<br />

Tubing with<br />

Weighted End<br />

Pump Inlet<br />

Pump Outlet<br />

Figure 2-3 Sample load pump<br />

To Sample Injection Port<br />

2-12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!