07.03.2014 Views

CombiFlash Torrent® User Manual - Isco

CombiFlash Torrent® User Manual - Isco

CombiFlash Torrent® User Manual - Isco

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 4 <strong>User</strong> Help Reference<br />

equilibration and then wait while you prepare the<br />

cartridge. After you have placed the cartridge on the<br />

module, click OK to continue with the run.<br />

• Solid – Select this option if you have already<br />

prepared the sample, placed it into a solid sample<br />

load cartridge, and loaded the cartridge on the<br />

module. The module will automatically proceed until<br />

the end of the programmed run length.<br />

• Liquid – Select this option if you have prepared a<br />

liquid sample and plan to manually inject it or pump<br />

into the injection port after column equilibration.<br />

• None (on column) – Select this option if you have<br />

preloaded the sample on the column. The module will<br />

skip column equilibration so that the sample will not<br />

be flushed from the column before the run.<br />

5.Review or update the Start Rack and Start Tube settings.<br />

6.Review the Minimum Run Requirements. PeakTrak will<br />

report the estimated solvent volumes, expected waste,<br />

collection tube usage, etc. You can use this information to<br />

verify that there will be enough solvent to complete the<br />

run, the waste volume does not exceed the collection<br />

container’s capacity, and whether or not more tubes will be<br />

required during the run.<br />

Note: The module estimates the solvent volumes by<br />

monitoring the solvent level in the container and the<br />

known usage rate. The module continues to refine this<br />

estimate during operation. See also: ABOUT SOLVENT<br />

LEVEL DETECTION [ON-LINE].<br />

Note: If the waste level sensing tube is inserted<br />

correctly into the waste container, the module<br />

automatically will suspend operation before an overflow<br />

condition might exist. To prevent the run from being<br />

suspended before completing the run, ensure that the<br />

container will hold the expected waste volume.<br />

7.Click OK and the run begins. The module responds<br />

according to the sample Loading Type you selected in<br />

step 4.<br />

4-35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!