CombiFlash Torrent® User Manual - Isco
CombiFlash Torrent® User Manual - Isco
CombiFlash Torrent® User Manual - Isco
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Section 4 <strong>User</strong> Help Reference<br />
equilibration and then wait while you prepare the<br />
cartridge. After you have placed the cartridge on the<br />
module, click OK to continue with the run.<br />
• Solid – Select this option if you have already<br />
prepared the sample, placed it into a solid sample<br />
load cartridge, and loaded the cartridge on the<br />
module. The module will automatically proceed until<br />
the end of the programmed run length.<br />
• Liquid – Select this option if you have prepared a<br />
liquid sample and plan to manually inject it or pump<br />
into the injection port after column equilibration.<br />
• None (on column) – Select this option if you have<br />
preloaded the sample on the column. The module will<br />
skip column equilibration so that the sample will not<br />
be flushed from the column before the run.<br />
5.Review or update the Start Rack and Start Tube settings.<br />
6.Review the Minimum Run Requirements. PeakTrak will<br />
report the estimated solvent volumes, expected waste,<br />
collection tube usage, etc. You can use this information to<br />
verify that there will be enough solvent to complete the<br />
run, the waste volume does not exceed the collection<br />
container’s capacity, and whether or not more tubes will be<br />
required during the run.<br />
Note: The module estimates the solvent volumes by<br />
monitoring the solvent level in the container and the<br />
known usage rate. The module continues to refine this<br />
estimate during operation. See also: ABOUT SOLVENT<br />
LEVEL DETECTION [ON-LINE].<br />
Note: If the waste level sensing tube is inserted<br />
correctly into the waste container, the module<br />
automatically will suspend operation before an overflow<br />
condition might exist. To prevent the run from being<br />
suspended before completing the run, ensure that the<br />
container will hold the expected waste volume.<br />
7.Click OK and the run begins. The module responds<br />
according to the sample Loading Type you selected in<br />
step 4.<br />
4-35