07.03.2014 Views

D-Series Syringe Pumps - Isco

D-Series Syringe Pumps - Isco

D-Series Syringe Pumps - Isco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

D <strong>Series</strong> <strong>Syringe</strong> <strong>Pumps</strong><br />

Section 8 Continuous Flow Introduction, Installation, & Operation<br />

3. Zero pressure in each pump (requires valves open to atmosphere).<br />

4. Purge air.<br />

5. Perform the total volume reset operation, as previously<br />

described.<br />

6. Be sure “ON CONT FLOW” is displayed on the screen.<br />

7. When the pumps start delivering, the system will go<br />

through an equilibration phase. To properly equilibrate the<br />

pumps, they must be full and delivering fluid during equilibration<br />

phase.<br />

8. Press RUN.<br />

Operational Overview –<br />

When using liquefied gases<br />

1. Zero pressure in each pump if empty (valves must be open<br />

to atmosphere).<br />

2. Fill both pumps completely.<br />

3. Pressurize both pumps.<br />

4. Perform the total volume reset operation.<br />

5. Be sure “ON CONT FLOW” is displayed on the screen.<br />

6. Press the RUN key.<br />

8.8 Special Features The following special features may be useful for your continuous<br />

flow applications.<br />

8.8.1 Remote Start/Stop The D <strong>Series</strong> syringe pump can be externally started or stopped<br />

by switch contact closure or TTL input. The TTL input voltage is<br />

5 volts and is internally pulled high (RUN). The input is level<br />

sensitive and must remain High for RUN and Low for STOP.<br />

The control wire should be connected to terminal 1, and the<br />

common wire should be connected to digital ground. To use the<br />

remote RUN/STOP feature, first press RUN or force the<br />

Run/Stop pin low and then high to start the pumps. Thereafter,<br />

the Run/Stop pin will control operation. Pressing STOP on the<br />

front panel will override the Run/Stop pin.<br />

8.8.2 External Analog<br />

Control<br />

8.8.3 Serial Control and<br />

Monitoring<br />

Flow or pressure setpoints can be externally controlled by analog<br />

voltage. Two wires are required for analog control. The analog<br />

common or ground wire should be connected to the GND terminal<br />

under ANALOG INPUT, and the analog control signal (or<br />

input) should be connected to terminal 1 under ANALOG INPUT.<br />

For more information, see section 3.7 of this instruction manual.<br />

The pumps can be externally controlled with a computer which<br />

has an RS-232-C serial output. The serial interface accepts<br />

English command words from the computer, like constant<br />

pressure, refill, etc. For more information, see Section 6, Serial<br />

Interface.<br />

8-19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!