Flowlink 5.1 Software Instruction Manual - Isco
Flowlink 5.1 Software Instruction Manual - Isco
Flowlink 5.1 Software Instruction Manual - Isco
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Isco</strong> <strong>Flowlink</strong> <strong>5.1</strong> ® <strong>Software</strong><br />
Direct Connections<br />
- Pulse Doppler<br />
Instruments<br />
A Communications Cable, <strong>Isco</strong> P/N 60-7004-057, connects the<br />
accQmin, ADFM box, or canister with amphenol connectors to<br />
your PC’s com port. To connect the ADFM canister with crown<br />
connector, use Cable P/N 60-7004-027.<br />
Instrument<br />
Connection<br />
Diagram<br />
Move an instrument<br />
to a new site<br />
You may need to periodically move an instrument to a new<br />
location. <strong>Flowlink</strong> will continue to connect to the instrument as it<br />
did in its original location, but you will probably want to create a<br />
new site in the workspace and clear the old readings stored in the<br />
instrument’s memory.<br />
To create a new site after relocating an instrument:<br />
1. Click the Quick Connect button on the toolbar, or<br />
press F11.<br />
2. Check the “Create new site” check box on the Quick<br />
Connect window.<br />
3. Click the large Connect button that matches the<br />
instrument type.<br />
4. <strong>Flowlink</strong> connects to the instrument and asks you to<br />
enter a new name for the site. Click Ok.<br />
5. <strong>Flowlink</strong> opens the Save As window. Type in the new site<br />
name and click the OK button. <strong>Flowlink</strong> continues to<br />
connect to the instrument.<br />
6. After <strong>Flowlink</strong> reads the instrument settings, it will<br />
pause and ask if you would like to clear the memory<br />
partitions (4100/4200/6700), or delete all of the data in<br />
the modules (2100). Select “Yes” to clear all of the data. If<br />
you select “No,” the instrument will retain the data<br />
collected at its original location. <strong>Flowlink</strong> then completes<br />
the connection process.<br />
150