07.03.2014 Views

standardization of environmental data and information - International ...

standardization of environmental data and information - International ...

standardization of environmental data and information - International ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

?? Testing <strong>of</strong> collection systems <strong>and</strong> equipment.<br />

The <strong>environmental</strong> impact assessment <strong>and</strong> the associated<br />

monitoring programme shall be submitted to the Secretary-General <strong>of</strong> the<br />

Authority at least one year before the activity takes place or, in the case <strong>of</strong><br />

integrated tests, at least two years in advance. This would give the<br />

Authority time to consult specialists with a view to possible adjustments <strong>of</strong><br />

the monitoring programme.<br />

The contractor shall include specification <strong>of</strong> events (such as<br />

pollution incidents) that could cause suspension or modification <strong>of</strong> the<br />

activities owing to serious <strong>environmental</strong> harm if the effects <strong>of</strong> the events<br />

cannot be adequately mitigated.<br />

3.3. Information to be provided by the contractor<br />

3.3.1. Preliminary <strong>information</strong><br />

Before running tests, the contractor must submit <strong>information</strong><br />

indicating what it expects will happen. Such provisional <strong>information</strong> will<br />

include:<br />

?? Location <strong>of</strong> the mining test <strong>and</strong> boundaries <strong>of</strong> the test area;<br />

?? Probable duration <strong>of</strong> the test;<br />

?? Test plans (collecting pattern, perturbed area, etc.);<br />

?? Nodule collection technique (passive or active mechanical dredge,<br />

hydraulic suction, water jets, etc.);<br />

?? Depth <strong>of</strong> penetration into the sea-bed;<br />

?? Running gear (skis, wheels, caterpillars, Archimedes screws, bearing<br />

plates, water cushion, etc.) that contacts the seabed, in order to<br />

gauge the nature <strong>of</strong> the impacts;<br />

?? Methods for separation on the seafloor <strong>of</strong> the nodules from the<br />

sediment, including washing <strong>of</strong> nodules, volume <strong>of</strong> the discharge <strong>of</strong><br />

sediment mixed with water, concentration <strong>of</strong> particles in the<br />

discharged mixture, height <strong>of</strong> discharge above the seafloor, etc.;<br />

45 INTERNATIONAL SEABED AUTHORITY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!