Part II- ESSENTIAL DETAILS OF ITEMS/ SERVICE REQUIRED<br />

13. Schedule of Requirement. The Seller would provide all items as mentioned <strong>in</strong> the Bill<br />

of Material and services as per scope of work as appended below :-<br />

BILL OF MATERIAL<br />

Item<br />

No.<br />

Description of goods Deno. Qty<br />

A Material<br />

(a) 6 Core MM 50/125um double sheath CSTA Unitube Outdoor Cable Mts. 4350<br />

(b) SC-LC Duplex Fiber Patch Cord MM-OM2-50/125um 3mtr Nos. 16<br />

(c) L3 10G Base-ER-XFP Fiber Module-40KM for 24/48 Port 1000 Nos. 1<br />

Mbps(RJ45) Switch<br />

(d) L2 1000 Base-ZX SM Module for 24 Port 10/100/1000 Mbps Switch Nos. 3<br />

with 4 Gbit Port<br />

(e) 1000 Base-LX SM Module for 48 Port 10/100/1000 Mbps Switch Nos. 16<br />

(f) Dual Information Outlet with Dual Port SMB Hav<strong>in</strong>g shutter facility Nos. 38<br />

(g) 500 Mhz Cat 6 UTP Cable Roll with 305 m length Nos. 13<br />

(h) Cat 6, 2 Mtrs Patch Cord Nos. 38<br />

(j) Cat 6, 3 Mtrs Patch Cord Nos. 38<br />

(k) Cat 6e 24 Port Patch Panel Nos. 3<br />

(l) 19'' 12 U Network<strong>in</strong>g Rack with all accessories Nos. 3<br />

(m) Conduit Pipe per m 5.08 cm (2.0 <strong>in</strong>ch) Mts 3150<br />

B Labour<br />

(n) Lay<strong>in</strong>g of OFC cable (per.m) Mts 4350<br />

(p) Lay<strong>in</strong>g of Cat 6 UTP Cable Mts. 3965<br />

(q) Fix<strong>in</strong>g of Rack Nos. 3<br />

(r) Fix<strong>in</strong>g of 24 port UTP cat 6 Jack Panel Nos. 3<br />

(s) Punch<strong>in</strong>g of I/O outlet Nos. 38<br />

(t) LIU Fix<strong>in</strong>g Nos. 4<br />

(u) Lay<strong>in</strong>g of PVC Pipe & Cas<strong>in</strong>g Cap<strong>in</strong>g Mts 3150<br />

(v) Fiber Connectrisation Per core Nos. 36<br />

(w) Digg<strong>in</strong>g of Hard Soil and Back Fill<strong>in</strong>g Mts 3900<br />

(x) Digg<strong>in</strong>g of Soft Soil Mts 400<br />

SCOPE OF WORK<br />

14. OFC is required to be laid from SO(K) office build<strong>in</strong>g to CWE(NW),GE(NW) and GE(P)<br />

Karanja.<br />

(a) Fitment of one L3 switch <strong>in</strong> SO(K) office build<strong>in</strong>g and three L2 switches <strong>in</strong> MES<br />

office build<strong>in</strong>gs.<br />

(b)<br />

etc.<br />

Labour work for lay<strong>in</strong>g of OFC for approx. 4 km, UTP for 38 nodes, fitment of racks,<br />

15. This project execution will encompass follow<strong>in</strong>g broad scope of work:-<br />

(a)<br />

Design, supply, delivery, <strong>in</strong>stallation of all active and passive components.<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!