naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in naval dockyard, mumbai - Irfc-nausena.nic.in
DEPT: QC(E) C. No 74 SHIP: FC MADHUR NAVAL DOCKYARD, MUMBAI QUALITY ASSURANCE PLAN REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0 No:01 NO JOB TITLE :REFIT QAP No : QCE74 245 QAP DATE : 11JUL12 PAGE 9 OF 22 E20016 Activity Description Dismantle the pump clean all the parts carry out the visual inspection and gauging of parts if excessive clearance is observed between the sealing rings, restore the clearances. Carry out the shaft trueness check, dynamic balancing of the rotating unit, submit the certificate, carryout painting post HAT 1 3 3 Defect Description Renewal of 01 in nos motor driven bilge pump and offer trials post renewal. Make FloRite pump, Type: SE 62/1, capacity 21 TPH ). Qty 01 E20017 . Activity Description Renew and prove efficacy of the pump during trials 1 3 3 Defect Description Renewal of foundation plate for following view perished. (c) 02 in nos G.S pump (d) 01 in nos bilge pump. Mat MS Size 300mm x 1000 x 8mm thick (as per sample). Alignment of pump with motor post renewal of foundation. DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 92/127
DEPT: QC(E) C. No 74 SHIP: FC MADHUR NAVAL DOCKYARD, MUMBAI QUALITY ASSURANCE PLAN REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0 No:01 NO JOB TITLE :REFIT QAP No : QCE74245 QAP DATE : 11JUL12 PAGE 10 OF22 E20018 9ctivity Description Renew plates as per given specification and align these pumps with motor in the presence of QC (E) inspector. 1 3 3 Defect Description Overhaul of semi rotary hand pump for following system view malfunctioning. (d) F/W System Qty 02 (e) Fuel system – Qty 01 (f) Bilge System Qty 01. (MakeBEW, ModelBSS No. 5) E20019 Activity Description Dismantle pump completely, clean all parts, gauge spindle, flap valve at seat, pins in good conditions, renew the shaft packing, carryout painting post overhaul. 1 3 3 Defect Description Renewal of 20 in nos studs & nuts of 04 in no fuel tank view damaged. E20020 Activity Description Remove all old studs and Nuts. Replace it with New studs and nuts and offer QC (E) inspection. 1 3 3 Defect Description The following steering hydraulic system valves to be renewed. (MaterialGun Metal) (a) HP line valves ( size 28 mm testing pressure 60 Kg/cm2) Qty 02 (b) LP line valves ( size 15 mm testing pressure 10 kg/cm2) Qty 02 DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 93/127
- Page 41 and 42: (g). Fuel filling system MS pipes/
- Page 43 and 44: (q) Both M/E F/W cooler drain valve
- Page 45 and 46: (viii) Seal oil Part Nos 509.0.10.1
- Page 47 and 48: overhauled and tested onboard, (e)
- Page 49 and 50: (b) control panel defective to be o
- Page 51 and 52: (e) (f) Total VAT @______% (if appl
- Page 53 and 54: epair of ships or boats or vessels
- Page 55 and 56: machine, measuring instruments, Oxy
- Page 57 and 58: NAVAL DOCKYARD MUMBAI DOC CODE Q C
- Page 59 and 60: suitable for DP Test approved equiv
- Page 61 and 62: 25 Fairleads,Ventilation trunking e
- Page 63 and 64: followed 37 Provision of material t
- Page 65 and 66: DYT/INCOD/1213/106(a)/PLYCM/MAD
- Page 67 and 68: NAVAL DOCKYARD, MUMBAI TITLE : QUAL
- Page 69 and 70: i) Check for meters serviceability,
- Page 71 and 72: efurbishment, new installation and
- Page 73 and 74: 11 Repair, Overhauling, refurbishme
- Page 75 and 76: of Wall mounted fan 16 Overhauling,
- Page 77 and 78: commissioning / testing of Oily wat
- Page 79 and 80: 25 Carbon brushes, brush holder, Ro
- Page 81 and 82: SCOPE OF WORK P R W H vi) Check for
- Page 83 and 84: DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 85 and 86: E20006 Defect Description If clea
- Page 87 and 88: DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 89 and 90: DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 91: pump post Overhauling. Make FloRi
- Page 95 and 96: DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 97 and 98: DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 99 and 100: kg/cm2 Qty 02 (f) Both M/E S/W suct
- Page 101 and 102: 65 mm, Mat Steel, TP 3.0 kg/cm2
- Page 103 and 104: new flanges. Hot bending is not per
- Page 105 and 106: Activity Description Remove the cou
- Page 107 and 108: ARTICLE 14 INDEMNITY & INSURANCE
- Page 109 and 110: ARTICLE 2 EFFECTIVE DATE AND OPE
- Page 111 and 112: 5.2 “END USER” CERTIFICATE. Con
- Page 113 and 114: Certificate (applicable in the case
- Page 115 and 116: ARTICLE 14 INDEMNITY & INSURANCE
- Page 117 and 118: procuring the Contracts or forbeari
- Page 119 and 120: (c) Control generation and disposal
- Page 121 and 122: ANNEX 2 to Encl - III to RFP SCOP
- Page 123 and 124: DESIGNATION / RANK DEPT/ORGANISATIO
- Page 125 and 126: ‘T’ BID COMPLIANCE MATRIX (TO B
- Page 127: Enclosure VII of RFP EMD Bank Guara
DEPT: QC(E) C. No<br />
74<br />
SHIP: FC MADHUR<br />
NAVAL DOCKYARD, MUMBAI<br />
QUALITY ASSURANCE PLAN<br />
REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0<br />
No:01<br />
NO<br />
JOB TITLE :REFIT<br />
QAP No : QCE74245 QAP DATE : 11JUL12 PAGE 10 OF22<br />
E20018 9ctivity Description<br />
Renew plates as per given specification and align<br />
these pumps with motor <strong>in</strong> the presence of QC (E)<br />
<strong>in</strong>spector.<br />
1 3 3<br />
Defect Description<br />
Overhaul of semi rotary hand pump for follow<strong>in</strong>g<br />
system view malfunction<strong>in</strong>g.<br />
(d) F/W System Qty 02<br />
(e) Fuel system – Qty 01<br />
(f) Bilge System Qty 01.<br />
(MakeBEW, ModelBSS No. 5)<br />
E20019 Activity Description<br />
Dismantle pump completely, clean all parts, gauge<br />
sp<strong>in</strong>dle, flap valve at seat, p<strong>in</strong>s <strong>in</strong> good conditions,<br />
renew the shaft pack<strong>in</strong>g, carryout pa<strong>in</strong>t<strong>in</strong>g post<br />
overhaul.<br />
1 3 3<br />
Defect Description<br />
Renewal of 20 <strong>in</strong> nos studs & nuts of 04 <strong>in</strong> no fuel<br />
tank view damaged.<br />
E20020 Activity Description<br />
Remove all old studs and Nuts. Replace it with New<br />
studs and nuts and offer QC (E) <strong>in</strong>spection.<br />
1 3 3<br />
Defect Description<br />
The follow<strong>in</strong>g steer<strong>in</strong>g hydraulic system valves to be<br />
renewed. (MaterialGun Metal)<br />
(a) HP l<strong>in</strong>e valves ( size 28 mm test<strong>in</strong>g pressure 60<br />
Kg/cm2) Qty 02<br />
(b) LP l<strong>in</strong>e valves ( size 15 mm test<strong>in</strong>g pressure 10<br />
kg/cm2) Qty 02<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 93/127