26 Sleeve, Identification tallies, terminals / studs and connectors beyond repair to be replaced/ manufactured as per sample/grade. Check for insulation, fitment and tightness. Should not create any humming noise/vibration/sparking etc. (vi) New carbon brushes / rocker arms/ spring, slip ring, commutator to be procured from as per sample & make / OEM make, / manufactured as per sample. Sample to be approved prior to fitment. Check quality, type, model, sizes, shape & as per IS standards/ requirement/ OEM make (vi) Check for fitment, installation, connection & insulation. (vii) Check for hot test / operation with uint. (i) Check for Cable lugs, numbers, ferrules, PVC / metal sleeve, identification tallies & terminals, terminals base and connector (ii) Cable lugs should be tinned copper conductor and heavy duty current carrying capacity to be used / as per circuit diagrams/ requirement. Cable lugs should be proper size, rating, type(I type, U type & O type) for proper connection. Copper lugs Dowell’s make / reputed make to be used.. (iii) Cable / wire terminals should be numbered as per circuit drawing. (iv) Cable lay out should be compact/ suitable and secured by cable ties/ cable channel/ casing capping./ conduit pipes. Cable tie, PVC / Metal pipes, casing and capping and cable channel to be procured from reputed make /OEM make confirming IS standards, New material should be durable, suitable, reliable, heavy duty and quality material. (v) Check for connection, terminal base, terminals / connectors & should be heavy duty, tight, cleaned, insulated. durable, suitable, reliable, heavy duty and quality material. New material to be procured from reputed firm /make /OEM make with IS STD confirming . 1 2&3 3 3 NAVAL DOCKYARD, MUMBAI TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3 DEPT. : QC(ELECTRICAL ) C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 14 OF 14 Sr. No. ACTIVITY DESCRIPTION REFERENCE DOCMENT & CHECK LIST INSPECTION DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 80/127

SCOPE OF WORK P R W H vi) Check for identification tallies. Tallies should be suitable, visible, durable, reliable, identified & tally material should be durable, quality material. Like for example aluminum metal/PVC engraved tally. vii) Check for Identification tallies for panel internal and external as per drawing/ requirement/OEM specified. viii) Check for numbers / ferrules of wiring end terminal as per circuit diagrams. It should be visible, proper size, quality material, suitable and durable. ix) Check for sleeve over cable joints, at cable terminal ends, For over Cable joints/ Cable end terminal /over lugs heat shrink sleeve / PVC sleeve to be used. Confirming IS Standard only. Remarks : (A) For QC clearance Repair, refurbishment / installation / fitment & testing /commissioning of Electrical DL’s on the ship /craft/boat (B) Legends : (i) P : Perform, R : Review, W: Witness, H: Hold (ii) 1. : Contractor / firm, 2 : USER , 3: MQC(L) , 4 : SS © (i) CHP (Customer Hold point ) The contactor is not to proceed further till approval of QC Supervisor (ii) Calibration certificate of Sensor, counter, timer, relays, Control PCB’s, Cut Out, Gauges & measuring instruments to be submitted. If requirement of re­calibration, To be carried from approved Govt lab. (iii) Test certificates of material / spares from OEM make / Government approved lab to be provided / submitted. New material used during overhauling / New installation of STP, bill/voucher copies to be provided/ submitted. (IV) Firm has to offered in stage wise / in process inspection that are Removal, Opening, overhauling, Installation and load trials & commissioning for QC checks. If HAT & SAT trials reports and Ship issued WDC to be submitted for preparation for inspection Note. (v) Additional QC checks may be undertaken in case of repeated failure. DEPT: QC(E) C. No 74 SHIP: FC MADHUR NAVAL DOCKYARD, MUMBAI QUALITY ASSURANCE PLAN REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0 No:01 NO JOB TITLE : REFIT DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 81/127

SCOPE OF WORK P R W H<br />

vi) Check for identification tallies. Tallies should be<br />

suitable, visible, durable, reliable, identified & tally<br />

material should be durable, quality material. Like for<br />

example alum<strong>in</strong>um metal/PVC engraved tally. vii)<br />

Check for Identification tallies for panel <strong>in</strong>ternal and<br />

external as per draw<strong>in</strong>g/ requirement/OEM specified.<br />

viii) Check for numbers / ferrules of wir<strong>in</strong>g end<br />

term<strong>in</strong>al as per circuit diagrams. It should be visible,<br />

proper size, quality material, suitable and durable.<br />

ix) Check for sleeve over cable jo<strong>in</strong>ts, at cable<br />

term<strong>in</strong>al ends, For over Cable jo<strong>in</strong>ts/ Cable end<br />

term<strong>in</strong>al /over lugs heat shr<strong>in</strong>k sleeve / PVC sleeve to<br />

be used. Confirm<strong>in</strong>g IS Standard only.<br />

Remarks : (A) For QC clearance Repair, refurbishment / <strong>in</strong>stallation / fitment &<br />

test<strong>in</strong>g /commission<strong>in</strong>g of Electrical DL’s on the ship /craft/boat<br />

(B) Legends : (i) P : Perform, R : Review, W: Witness, H: Hold<br />

(ii) 1. : Contractor / firm, 2 : USER , 3: MQC(L) , 4 : SS<br />

© (i) CHP (Customer Hold po<strong>in</strong>t ) The contactor is not to proceed further till approval of QC<br />

Supervisor<br />

(ii) Calibration certificate of Sensor, counter, timer, relays, Control PCB’s, Cut Out,<br />

Gauges & measur<strong>in</strong>g <strong>in</strong>struments to be submitted. If requirement of re­calibration, To be<br />

carried from approved Govt lab.<br />

(iii) Test certificates of material / spares from OEM make / Government approved lab to<br />

be<br />

provided / submitted. New material used dur<strong>in</strong>g overhaul<strong>in</strong>g / New <strong>in</strong>stallation<br />

of STP, bill/voucher copies to be provided/ submitted. (IV) Firm has to offered <strong>in</strong><br />

stage wise / <strong>in</strong> process <strong>in</strong>spection that are Removal, Open<strong>in</strong>g, overhaul<strong>in</strong>g,<br />

Installation and load trials & commission<strong>in</strong>g for QC checks. If HAT & SAT trials<br />

reports and Ship issued WDC to be submitted for preparation for <strong>in</strong>spection Note.<br />

(v) Additional QC checks may be undertaken <strong>in</strong> case of repeated failure.<br />

DEPT: QC(E) C. No<br />

74<br />

SHIP: FC MADHUR<br />

NAVAL DOCKYARD, MUMBAI<br />

QUALITY ASSURANCE PLAN<br />

REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0<br />

No:01<br />

NO<br />

JOB TITLE : REFIT<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 81/127