26 Sleeve, Identification tallies, terminals / studs and connectors beyond repair to be replaced/ manufactured as per sample/grade. Check for insulation, fitment and tightness. Should not create any humming noise/vibration/sparking etc. (vi) New carbon brushes / rocker arms/ spring, slip ring, commutator to be procured from as per sample & make / OEM make, / manufactured as per sample. Sample to be approved prior to fitment. Check quality, type, model, sizes, shape & as per IS standards/ requirement/ OEM make (vi) Check for fitment, installation, connection & insulation. (vii) Check for hot test / operation with uint. (i) Check for Cable lugs, numbers, ferrules, PVC / metal sleeve, identification tallies & terminals, terminals base and connector (ii) Cable lugs should be tinned copper conductor and heavy duty current carrying capacity to be used / as per circuit diagrams/ requirement. Cable lugs should be proper size, rating, type(I type, U type & O type) for proper connection. Copper lugs Dowell’s make / reputed make to be used.. (iii) Cable / wire terminals should be numbered as per circuit drawing. (iv) Cable lay out should be compact/ suitable and secured by cable ties/ cable channel/ casing capping./ conduit pipes. Cable tie, PVC / Metal pipes, casing and capping and cable channel to be procured from reputed make /OEM make confirming IS standards, New material should be durable, suitable, reliable, heavy duty and quality material. (v) Check for connection, terminal base, terminals / connectors & should be heavy duty, tight, cleaned, insulated. durable, suitable, reliable, heavy duty and quality material. New material to be procured from reputed firm /make /OEM make with IS STD confirming . 1 2&3 3 3 NAVAL DOCKYARD, MUMBAI TITLE : QUALITY ASSURANCE PLAN DOC CODE Q C L 7 4 Q A P 0 6 3 DEPT. : QC(ELECTRICAL ) C. NO. 74 ISSUE NO : 00 DATE : 15 Apr 12 PAGE 14 OF 14 Sr. No. ACTIVITY DESCRIPTION REFERENCE DOCMENT & CHECK LIST INSPECTION DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 80/127
SCOPE OF WORK P R W H vi) Check for identification tallies. Tallies should be suitable, visible, durable, reliable, identified & tally material should be durable, quality material. Like for example aluminum metal/PVC engraved tally. vii) Check for Identification tallies for panel internal and external as per drawing/ requirement/OEM specified. viii) Check for numbers / ferrules of wiring end terminal as per circuit diagrams. It should be visible, proper size, quality material, suitable and durable. ix) Check for sleeve over cable joints, at cable terminal ends, For over Cable joints/ Cable end terminal /over lugs heat shrink sleeve / PVC sleeve to be used. Confirming IS Standard only. Remarks : (A) For QC clearance Repair, refurbishment / installation / fitment & testing /commissioning of Electrical DL’s on the ship /craft/boat (B) Legends : (i) P : Perform, R : Review, W: Witness, H: Hold (ii) 1. : Contractor / firm, 2 : USER , 3: MQC(L) , 4 : SS © (i) CHP (Customer Hold point ) The contactor is not to proceed further till approval of QC Supervisor (ii) Calibration certificate of Sensor, counter, timer, relays, Control PCB’s, Cut Out, Gauges & measuring instruments to be submitted. If requirement of recalibration, To be carried from approved Govt lab. (iii) Test certificates of material / spares from OEM make / Government approved lab to be provided / submitted. New material used during overhauling / New installation of STP, bill/voucher copies to be provided/ submitted. (IV) Firm has to offered in stage wise / in process inspection that are Removal, Opening, overhauling, Installation and load trials & commissioning for QC checks. If HAT & SAT trials reports and Ship issued WDC to be submitted for preparation for inspection Note. (v) Additional QC checks may be undertaken in case of repeated failure. DEPT: QC(E) C. No 74 SHIP: FC MADHUR NAVAL DOCKYARD, MUMBAI QUALITY ASSURANCE PLAN REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0 No:01 NO JOB TITLE : REFIT DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 81/127
- Page 29 and 30: (a) M/s Sigma paint scheme (i) To b
- Page 31 and 32: (iv) Intershield 300(bronze) - 150
- Page 33 and 34: H10069 General Surfaces in Dry Co
- Page 35 and 36: (ii) Pilot Primer, Gery to achieve
- Page 37 and 38: (ii) Withdraw shaft and check truen
- Page 39 and 40: E20014 Overhauling (3000 Hourly r
- Page 41 and 42: (g). Fuel filling system MS pipes/
- Page 43 and 44: (q) Both M/E F/W cooler drain valve
- Page 45 and 46: (viii) Seal oil Part Nos 509.0.10.1
- Page 47 and 48: overhauled and tested onboard, (e)
- Page 49 and 50: (b) control panel defective to be o
- Page 51 and 52: (e) (f) Total VAT @______% (if appl
- Page 53 and 54: epair of ships or boats or vessels
- Page 55 and 56: machine, measuring instruments, Oxy
- Page 57 and 58: NAVAL DOCKYARD MUMBAI DOC CODE Q C
- Page 59 and 60: suitable for DP Test approved equiv
- Page 61 and 62: 25 Fairleads,Ventilation trunking e
- Page 63 and 64: followed 37 Provision of material t
- Page 65 and 66: DYT/INCOD/1213/106(a)/PLYCM/MAD
- Page 67 and 68: NAVAL DOCKYARD, MUMBAI TITLE : QUAL
- Page 69 and 70: i) Check for meters serviceability,
- Page 71 and 72: efurbishment, new installation and
- Page 73 and 74: 11 Repair, Overhauling, refurbishme
- Page 75 and 76: of Wall mounted fan 16 Overhauling,
- Page 77 and 78: commissioning / testing of Oily wat
- Page 79: 25 Carbon brushes, brush holder, Ro
- Page 83 and 84: DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 85 and 86: E20006 Defect Description If clea
- Page 87 and 88: DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 89 and 90: DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 91 and 92: pump post Overhauling. Make FloRi
- Page 93 and 94: DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 95 and 96: DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 97 and 98: DEPT: QC(E) C. No 74 SHIP: FC MADHU
- Page 99 and 100: kg/cm2 Qty 02 (f) Both M/E S/W suct
- Page 101 and 102: 65 mm, Mat Steel, TP 3.0 kg/cm2
- Page 103 and 104: new flanges. Hot bending is not per
- Page 105 and 106: Activity Description Remove the cou
- Page 107 and 108: ARTICLE 14 INDEMNITY & INSURANCE
- Page 109 and 110: ARTICLE 2 EFFECTIVE DATE AND OPE
- Page 111 and 112: 5.2 “END USER” CERTIFICATE. Con
- Page 113 and 114: Certificate (applicable in the case
- Page 115 and 116: ARTICLE 14 INDEMNITY & INSURANCE
- Page 117 and 118: procuring the Contracts or forbeari
- Page 119 and 120: (c) Control generation and disposal
- Page 121 and 122: ANNEX 2 to Encl - III to RFP SCOP
- Page 123 and 124: DESIGNATION / RANK DEPT/ORGANISATIO
- Page 125 and 126: ‘T’ BID COMPLIANCE MATRIX (TO B
- Page 127: Enclosure VII of RFP EMD Bank Guara
SCOPE OF WORK P R W H<br />
vi) Check for identification tallies. Tallies should be<br />
suitable, visible, durable, reliable, identified & tally<br />
material should be durable, quality material. Like for<br />
example alum<strong>in</strong>um metal/PVC engraved tally. vii)<br />
Check for Identification tallies for panel <strong>in</strong>ternal and<br />
external as per draw<strong>in</strong>g/ requirement/OEM specified.<br />
viii) Check for numbers / ferrules of wir<strong>in</strong>g end<br />
term<strong>in</strong>al as per circuit diagrams. It should be visible,<br />
proper size, quality material, suitable and durable.<br />
ix) Check for sleeve over cable jo<strong>in</strong>ts, at cable<br />
term<strong>in</strong>al ends, For over Cable jo<strong>in</strong>ts/ Cable end<br />
term<strong>in</strong>al /over lugs heat shr<strong>in</strong>k sleeve / PVC sleeve to<br />
be used. Confirm<strong>in</strong>g IS Standard only.<br />
Remarks : (A) For QC clearance Repair, refurbishment / <strong>in</strong>stallation / fitment &<br />
test<strong>in</strong>g /commission<strong>in</strong>g of Electrical DL’s on the ship /craft/boat<br />
(B) Legends : (i) P : Perform, R : Review, W: Witness, H: Hold<br />
(ii) 1. : Contractor / firm, 2 : USER , 3: MQC(L) , 4 : SS<br />
© (i) CHP (Customer Hold po<strong>in</strong>t ) The contactor is not to proceed further till approval of QC<br />
Supervisor<br />
(ii) Calibration certificate of Sensor, counter, timer, relays, Control PCB’s, Cut Out,<br />
Gauges & measur<strong>in</strong>g <strong>in</strong>struments to be submitted. If requirement of recalibration, To be<br />
carried from approved Govt lab.<br />
(iii) Test certificates of material / spares from OEM make / Government approved lab to<br />
be<br />
provided / submitted. New material used dur<strong>in</strong>g overhaul<strong>in</strong>g / New <strong>in</strong>stallation<br />
of STP, bill/voucher copies to be provided/ submitted. (IV) Firm has to offered <strong>in</strong><br />
stage wise / <strong>in</strong> process <strong>in</strong>spection that are Removal, Open<strong>in</strong>g, overhaul<strong>in</strong>g,<br />
Installation and load trials & commission<strong>in</strong>g for QC checks. If HAT & SAT trials<br />
reports and Ship issued WDC to be submitted for preparation for <strong>in</strong>spection Note.<br />
(v) Additional QC checks may be undertaken <strong>in</strong> case of repeated failure.<br />
DEPT: QC(E) C. No<br />
74<br />
SHIP: FC MADHUR<br />
NAVAL DOCKYARD, MUMBAI<br />
QUALITY ASSURANCE PLAN<br />
REV DATE: 23 May 12 FORM Q C E 0 7 4 R E 0 1 0<br />
No:01<br />
NO<br />
JOB TITLE : REFIT<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420 81/127