naval dockyard, mumbai - Irfc-nausena.nic.in

naval dockyard, mumbai - Irfc-nausena.nic.in naval dockyard, mumbai - Irfc-nausena.nic.in

irfc.nausena.nic.in
from irfc.nausena.nic.in More from this publisher
06.03.2014 Views

14. The L1 firm will be decided on sum total of services, repair charges, cost of spares, applicable taxes (excluding Service tax) and duties (including exemptions sought/granted) but exclusive of Octroi/Entry Tax. Foreign Exchange content if any is to be clearly specified along with the specific items on which customs duty would be applicable alongwith the applicable rates of customs duty. Customs duty exemption certificate will be issued only if the above mentioned particulars are provided unambiguously; else the bid will be summarily rejected. Master list of spares requiring customs duty exemption is to be provided separately with the quotation indicating cost and applicable customs duty. A period of ten working days is required to process requests for Customs duty exemption certificate subsequent to receipt of Airway Bill of Materials. 15. Payment Terms. The Payment Terms for the Contract Price shall be as follows:­ Sl.No. Activity Stage Payment Definition 1 1. 25% on completion of version I of dry docking, provided all u/w steel renewal except for Ver I dock block areas is completed with WCC signed by MYCM and MYC&R. 2. 25% on completion of Version II of dry docking, with WCC signed by MYCM and MYC&R. 3. 50% On completion of sea trials and all DLs and paint manufacturers performance guarantee for underwater and internal paint scheme along with purchase voucher of paint to be submitted to user department WCC duly signed by MYCM., duly certified by user manager. Standard Conditions of Contract (SCOC) 16. (a) Firm shall be required to accept the SCOC. A Contract will be signed between the Contract Operating Authority, Integrated Commercial Department (INCOD), Naval Dockyard, Mumbai and the shipyard/firm incorporating the SCOC at Enclosure III of this RFP, which will form an integral part of the Contract. (b) The firms requested to furnish complete details in T­bid sought in Enclosure IV of RFP, if the same is not indicated the bid will be disqualified. Pre­Bid Conference 17. The SOR (Enclosure II) and SCOC (Enclosure III) should be carefully considered while preparing the bids. All clarifications are to be resolved in the Pre­Bid Conference on 25 Feb 2013, 1000 hrs. at SMYCM Office, Tel No. 22752186, 22751576, prior submission of bids. No revision of Commercial Bid would normally be permitted after opening of the Technical Bid. (Note: The detail of personnel attending the pre­bid meeting is to be intimated to the User Manager at least one day prior to the pre­bid meeting.) Commercial Bid DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 4/127

18. (a) The Commercial bid is to be submitted strictly in accordance with Enclosure ­V to this tender enquiry and in format given under “Mode of Quotation” indicated at Annexure 2 to Encl – II to RFP. This format is to be strictly adhered to for submission of commercial bid. Non compliance could result in disqualification of the firm. The Commercial bid once opened, will not be subjected to unilateral revision by the firm, unless the firm is called for price negotiations specifically and asked to justify the rates. (Total Nos of pages in the Q­bid are to be mentioned on the first page of the Q­bid. Further each page to be numbered. For example if there are 20 pages in Q bid, first page to be numbered as 1/20 and last page to be numbered as 20/20.) (b) Foreign Exchange Content. Foreign Exchange content, if any, is to be clearly specified along with the specific items on which customs duty would be applicable clearly indicating the rates of customs duty applicable. In the absence of complete unambiguous details, following actions will be taken:­ (i) Loading custom duty at the rate of 25% on entire material cost, when ‘Foreign Exchange’ content is not specified in the Q bid. (ii) Loading custom duty at the rate of 25% when applicable rate of customs duty is not specified in Q bid. (iii) Further, customs duty exemption certificate will be issued only if the above mentioned particulars are provided unambiguously. (c) Exemption Certificates. All bidders are to specify the list of items for which Customs/ Excise/ Octroi exemption certificates are sought. The list is to be forwarded alongwith the T bid for evaluation by the TEC. Exemption certificates if sought by the firms will be issued only for the list of items specified in the T Bid of the firm in the following format:­ (i) For Issue of Customs Duty Exemption S No Description Part No Qty (ii) For Issue of Excise Duty Exemption S No Description Part No Qty (iii) For Issue of Octroi Duty Exemption S No Description Part No Qty 19. Service Tax. Government of India, Ministry of Finance (Department of Revenue) Notification No. 12/2012 – ‘Service Tax’, dated 17 Mar 2012 exempts ‘Service tax’ for repair of ships or boats or vessels belonging to the Government of India. Therefore the firms are requested not to quote for service tax. Conditions under which this RFP is issued DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420 5/127

14. The L1 firm will be decided on sum total of services, repair charges, cost of spares,<br />

applicable taxes (exclud<strong>in</strong>g Service tax) and duties (<strong>in</strong>clud<strong>in</strong>g exemptions sought/granted) but<br />

exclusive of Octroi/Entry Tax. Foreign Exchange content if any is to be clearly specified along<br />

with the specific items on which customs duty would be applicable alongwith the applicable<br />

rates of customs duty. Customs duty exemption certificate will be issued only if the above<br />

mentioned particulars are provided unambiguously; else the bid will be summarily rejected.<br />

Master list of spares requir<strong>in</strong>g customs duty exemption is to be provided separately with the<br />

quotation <strong>in</strong>dicat<strong>in</strong>g cost and applicable customs duty. A period of ten work<strong>in</strong>g days is required<br />

to process requests for Customs duty exemption certificate subsequent to receipt of Airway<br />

Bill of Materials.<br />

15. Payment Terms. The Payment Terms for the Contract Price shall be as follows:­<br />

Sl.No. Activity Stage Payment<br />

Def<strong>in</strong>ition<br />

1 1. 25% on completion of version I of dry dock<strong>in</strong>g,<br />

provided all u/w steel renewal except for Ver I dock block<br />

areas is completed with WCC signed by MYCM and<br />

MYC&R.<br />

2. 25% on completion of Version II of dry dock<strong>in</strong>g, with<br />

WCC signed by MYCM and MYC&R.<br />

3. 50% On completion of sea trials and all DLs and pa<strong>in</strong>t<br />

manufacturers performance guarantee for underwater<br />

and <strong>in</strong>ternal pa<strong>in</strong>t scheme along with purchase voucher<br />

of pa<strong>in</strong>t to be submitted to user department WCC duly<br />

signed by MYCM.,<br />

duly certified by user manager.<br />

Standard Conditions of Contract (SCOC)<br />

16. (a) Firm shall be required to accept the SCOC. A Contract will be signed between the Contract<br />

Operat<strong>in</strong>g Authority, Integrated Commercial Department (INCOD), Naval Dockyard,<br />

Mumbai and the shipyard/firm <strong>in</strong>corporat<strong>in</strong>g the SCOC at Enclosure III of this RFP, which will<br />

form an <strong>in</strong>tegral part of the Contract.<br />

(b) The firms requested to furnish complete details <strong>in</strong> T­bid sought <strong>in</strong> Enclosure IV of RFP, if<br />

the same is not <strong>in</strong>dicated the bid will be disqualified.<br />

Pre­Bid Conference<br />

17. The SOR (Enclosure II) and SCOC (Enclosure III) should be carefully considered while<br />

prepar<strong>in</strong>g the bids. All clarifications are to be resolved <strong>in</strong> the Pre­Bid Conference on 25 Feb 2013, 1000<br />

hrs. at SMYCM Office, Tel No. 22752186, 22751576, prior submission of bids. No revision of<br />

Commercial Bid would normally be permitted after open<strong>in</strong>g of the Tech<strong>nic</strong>al Bid.<br />

(Note: The detail of personnel attend<strong>in</strong>g the pre­bid meet<strong>in</strong>g is to be <strong>in</strong>timated to the User Manager at<br />

least one day prior to the pre­bid meet<strong>in</strong>g.)<br />

Commercial Bid<br />

DYT/INCOD/12­13/106(a)/PL­YCM/MADHUR­REFIT/420<br />

4/127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!