E20009 Both rudder stock bush clearances to be checked.<br />
On completion renew gland pack<strong>in</strong>g as per sample<br />
(MatGreased Hemp/cotton grease, complete 05<br />
turn, rudder stock dia 110 mm).<br />
E20010 If clearances found beyond permissible limits,<br />
withdraw rudder stocks and renew bushes,<br />
sleeves, repair rudder journals and restore to<br />
design clearances. Details of bushes and sleeves<br />
as below.<br />
(i) Bushes: Mat GM BS 1400, LG 3C;<br />
Length 260 mm; ID 122 mm; OD 152<br />
mm<br />
ii) Sleeves: Mat Phosphor Bronze BS 1400PB<br />
1C; Thickness 6 mm; ID 110 mm, Length480<br />
mm; shrunk fitted;<br />
E20011 Steer<strong>in</strong>g hydraulic motor driven pump(Type M 4)<br />
to be overhauled and gears, shafts, bear<strong>in</strong>g seals,<br />
02 <strong>in</strong> nos electrically operated maneuver<strong>in</strong>g valves<br />
to be renewed (Type S 35 P, 24 V DC, make<br />
Tenfjord). (Work<strong>in</strong>g pressure 40 Kg/cm2, test<strong>in</strong>g<br />
pressure 60kg/cm2).Prove pumps post<br />
overhaul<strong>in</strong>g. ).<br />
E20012 Overhaul and repair steer<strong>in</strong>g hand operated wheel<br />
pump (Type H 33) and transmitter, renew worn out<br />
parts as per MQC <strong>in</strong>spection. Prove the pump for<br />
satisfactory operation.<br />
E20013 02 <strong>in</strong> nos gear box lub oil coolers to be removed,<br />
chemically cleaned, pressure tested & fitted back<br />
on completion. Defective tubes to be blanked Qty<br />
02, Test Pressure 10 Kg/ cm2. ).<br />
02 Nos<br />
02 Nos<br />
01 Nos<br />
01 Nos<br />
02 Nos<br />