naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
naval dockyard, mumbai - Irfc-nausena.nic.in
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
(Annexure 1 to Encl – II to<br />
RFP DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420<br />
Dated 02 Feb 13)<br />
SCHEDULE OF REQUIREMENTS (SOR)<br />
REFIT OF FERRY CRAFTMADHUR<br />
Sl Description Remarks of Indenter<br />
1 Department <strong>in</strong>itiat<strong>in</strong>g the SOC MYCM<br />
2 Name of the item(s)/services be<strong>in</strong>g procured Normal Refit<br />
3 Summary of case for procurement<br />
a Name of ship/equipment Ferry craft Madhur<br />
b Broad purpose of items/services be<strong>in</strong>g procured As per yard policy, planned<br />
ma<strong>in</strong>tenance/refit of yard craft<br />
is required to be undertaken<br />
through offload<strong>in</strong>g/RCs to<br />
obviate overload<strong>in</strong>g on various<br />
centres of <strong>dockyard</strong>. Due to<br />
capacity constra<strong>in</strong>ts of the yard,<br />
it is proposed to offload the refit<br />
of FC Madhur to the trade on<br />
open tender basis.<br />
c Location where work is to be undertaken Ferry Craft Madhur.<br />
d Type of Work Refit of Ferry craft Madhur<br />
e Start Date of Work On date of commencement of<br />
phase – I dock<strong>in</strong>g<br />
f Estimated Duration of Work 20 Weeks <strong>in</strong>clud<strong>in</strong>g<br />
mobilization time.<br />
g Earnest Money Deposit Rs 2,40,000<br />
h Test Specification : In accordance to that specified<br />
<strong>in</strong> draw<strong>in</strong>gs / QAP / repair<br />
manuals<br />
j Tech<strong>nic</strong>al Acceptance Criteria : In accordance to that specified<br />
<strong>in</strong> draw<strong>in</strong>gs / QAP / repair<br />
manuals<br />
k Acceptance Agency Inspection notes to be issued<br />
by MQC based on acceptance.<br />
WCC to be issued by MYCM.<br />
l Inspection stages In accordance to that specified<br />
<strong>in</strong> QAP placed at Annexure 3 to<br />
EnclII to RFP.<br />
m Ability to give support at country wide locations<br />
(required/not required). If required locations to be<br />
NA<br />
n<br />
<strong>in</strong>dicated.<br />
Past experience <strong>in</strong> undertak<strong>in</strong>g (required/not<br />
required)<br />
DYT/INCOD/1213/106(a)/PLYCM/MADHURREFIT/420<br />
The firm should have carried<br />
out a refit/major repairs <strong>in</strong> engg<br />
10/127