14.02.2014 Views

York Township Water & Sewer Authority

York Township Water & Sewer Authority

York Township Water & Sewer Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>York</strong> <strong>Township</strong> <strong>Water</strong> & <strong>Sewer</strong> <strong>Authority</strong><br />

Meeting Minutes<br />

March 18, 2002<br />

Chairman Ronnell Sprenkle called the regular monthly meeting of the <strong>York</strong> <strong>Township</strong><br />

<strong>Water</strong> & <strong>Sewer</strong> <strong>Authority</strong> to order at 7:03 P.M. with the following in attendance:<br />

Members<br />

Ronnell Sprenkle<br />

Tim O’Donnell<br />

Sherry Bosserman<br />

Others<br />

Dave Jones – Stock & Leader<br />

Rick Resh – C.S. Davidson, Inc.<br />

Mark Clark – <strong>York</strong> Twp.<br />

Larena Keller – <strong>York</strong> Twp.<br />

Minutes:<br />

On motion of Ms. Bosserman, seconded by Mr. Sprenkle, the minutes of February 18,<br />

2002 were approved. All were in favor.<br />

Visitors and Public Comments:<br />

None<br />

Public Works Report:<br />

Mr. Clark reported that while doing regular inspections on an interceptor that runs<br />

through Snyder’s Park, the sewer crew found that in the 2,474’ of main. There were 29<br />

areas that needed repair. There were also 2 areas that they could not inspect. Mr. Clark<br />

requested that the Board of Commissioners to fund replacing the entire line with PVC<br />

pipe. The board directed him to proceed with the bidding process. His plans are to<br />

advertise in April and award the bid at the May meeting.<br />

Solicitor’s Report:<br />

Mr. Jones reported that Raby Corporation has deposed Joseph Boldaz and is in the<br />

process of scheduling a deposition for Ray Hovis.<br />

The solicitor’s office is awaiting the signed agreement for the Royal Court Apartments<br />

R-O-W Resolution.<br />

New Plan Reviews:<br />

Kenneth Stoltzfus – Sage Hill (P2002-3-1) – The plan was presented by Lee Faircloth<br />

of Gordon L. Brown & Associates, Inc. The plan was returned to address the March 7,<br />

2002 engineer’s comments.


Plan Resubmittals:<br />

Chestnut Ridge – Phase II (P02-2-4) – The plan was presented by Lee Faircloth of<br />

Gordon L. Brown & Associates, Inc. On motion of Ms. Bosserman, seconded by Mr.<br />

Sprenkle, the plan was approved subject to the March 7, 2002 engineer’s comments. All<br />

were in favor.<br />

Engineer’s Report:<br />

Mr. Resh reported that the Springettsbury <strong>Township</strong> Intermunicipal Agreement will<br />

require another meeting to wrap up the draft agreement.<br />

The work has begun at Equine Meadows-Phase II to replace the main and laterals.<br />

The Chapter 94 report has been revised to address the potential restaurant in Cape Horn<br />

Square and to correct a mistake that was found.<br />

Rutter’s Inc. has offered the sewer line on their property for dedication to the authority.<br />

Mr. Clark will televise and retest the line before any action will take place.<br />

Requisitions and Checks:<br />

On motion of Ms. Bosserman, seconded by Mr. Sprenkle, checks 655-656 were<br />

authorized for payment. All were in favor.<br />

Adjournment:<br />

On motion of Ms. Bosserman, seconded by Mr. O’Donnell, the meeting was adjourned at<br />

7:50 P.M. All were in favor.<br />

Larena Keller, Secretary

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!