Monitoring<br />
Sampling Groups<br />
for Monitoring<br />
Cross Check<br />
Groups<br />
Minimum Group<br />
Size<br />
Measurement<br />
Equipment for<br />
Each Lamp in<br />
Sampling Groups<br />
Power Correction<br />
Factor<br />
Monitoring<br />
Spatial Location<br />
of Each Household<br />
Detailed<br />
Information on all<br />
Lamps in Sampled<br />
Households<br />
Four sampling groups are used for determination of baseline and project<br />
emissions. Two groups serve for determination of baseline and for project<br />
emissions (baseline and project sample groups), with another two serving to<br />
cross-check the results achieved (baseline and project cross-check groups;<br />
these are re-established by random choice at the start of each monitoring<br />
interval): The minimum size of the groups at the start of the project is 100<br />
households, and CERs cease to accrue if the size of a group falls below 60.<br />
Buffer groups can be established to prevent a fall of the group size under<br />
the critical threshold. The distribution of sample group households across<br />
project areas shall be proportional to the lamp distribution pattern across<br />
project areas. Members of the project sample group should not receive<br />
more information than other households and should not be particularly<br />
encouraged to participate in the project. Measurement equipment shall<br />
be installed in all sampled households, either to measure all lamps in the<br />
households or only those in the living areas. This metering equipment, which<br />
can either be an electricity or a run-time meter, has to be attached to the<br />
lamp or the cable, not the socket to prevent that project participants are<br />
involuntarily keeping the lamps distributed by the project. Run-time meters<br />
can only be used if all lamps sold in the host country perform according to<br />
the standards IEC60064 (incandescent lamps) and IEC60901 (CFLs), if the<br />
power rating is measured on site or if the lowest power rating found in the<br />
baseline sample group and the highest power rating found in the project<br />
sample group is used for the calculation. Moreover, a power correction factor<br />
has to be applied that takes into account that lamp electricity use depends<br />
on the actual grid voltage achieved.<br />
Monitoring shall be conducted as follows.<br />
Ex ante<br />
• Power rating of each lamp type distributed, through laboratory<br />
measurements<br />
• Grid voltage<br />
• GPS data to define the project areas;<br />
• Household name, address, GPS data, applicable project area, for all sample<br />
groups;<br />
• Electricity consumption of sample group households according to<br />
electricity invoices<br />
• Date when the household has been added to the sample groups;<br />
• Date of first spot check in sample groups;<br />
• Place and number of lamps found during a first spot checks in the<br />
household/ in its living area;<br />
• Clear identification of each lamp found during a spot check;<br />
• Type of measurement equipment installed for each of those lamps and<br />
date of its installation<br />
• Information whether the lamp and its measurement equipment is working<br />
appropriately,<br />
82