Monitoring<br />

Sampling Groups<br />

for Monitoring<br />

Cross Check<br />

Groups<br />

Minimum Group<br />

Size<br />

Measurement<br />

Equipment for<br />

Each Lamp in<br />

Sampling Groups<br />

Power Correction<br />

Factor<br />

Monitoring<br />

Spatial Location<br />

of Each Household<br />

Detailed<br />

Information on all<br />

Lamps in Sampled<br />

Households<br />

Four sampling groups are used for determination of baseline and project<br />

emissions. Two groups serve for determination of baseline and for project<br />

emissions (baseline and project sample groups), with another two serving to<br />

cross-check the results achieved (baseline and project cross-check groups;<br />

these are re-established by random choice at the start of each monitoring<br />

interval): The minimum size of the groups at the start of the project is 100<br />

households, and CERs cease to accrue if the size of a group falls below 60.<br />

Buffer groups can be established to prevent a fall of the group size under<br />

the critical threshold. The distribution of sample group households across<br />

project areas shall be proportional to the lamp distribution pattern across<br />

project areas. Members of the project sample group should not receive<br />

more information than other households and should not be particularly<br />

encouraged to participate in the project. Measurement equipment shall<br />

be installed in all sampled households, either to measure all lamps in the<br />

households or only those in the living areas. This metering equipment, which<br />

can either be an electricity or a run-time meter, has to be attached to the<br />

lamp or the cable, not the socket to prevent that project participants are<br />

involuntarily keeping the lamps distributed by the project. Run-time meters<br />

can only be used if all lamps sold in the host country perform according to<br />

the standards IEC60064 (incandescent lamps) and IEC60901 (CFLs), if the<br />

power rating is measured on site or if the lowest power rating found in the<br />

baseline sample group and the highest power rating found in the project<br />

sample group is used for the calculation. Moreover, a power correction factor<br />

has to be applied that takes into account that lamp electricity use depends<br />

on the actual grid voltage achieved.<br />

Monitoring shall be conducted as follows.<br />

Ex ante<br />

• Power rating of each lamp type distributed, through laboratory<br />

measurements<br />

• Grid voltage<br />

• GPS data to define the project areas;<br />

• Household name, address, GPS data, applicable project area, for all sample<br />

groups;<br />

• Electricity consumption of sample group households according to<br />

electricity invoices<br />

• Date when the household has been added to the sample groups;<br />

• Date of first spot check in sample groups;<br />

• Place and number of lamps found during a first spot checks in the<br />

household/ in its living area;<br />

• Clear identification of each lamp found during a spot check;<br />

• Type of measurement equipment installed for each of those lamps and<br />

date of its installation<br />

• Information whether the lamp and its measurement equipment is working<br />

appropriately,<br />

82