Understanding CDM Methodologies - SuSanA
Understanding CDM Methodologies - SuSanA
Understanding CDM Methodologies - SuSanA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Ex-post Data on<br />
Power Generation<br />
Ex-post: After the project implementation, monitoring shall be conducted on<br />
the following items:<br />
• Power generation of the renewable component of the project. If fossil fuel<br />
is used in the project, the power generation metered should be adjusted<br />
to deduct power generation from fossil fuels using the specific fuel<br />
consumption and the quantity of fossil fuel consumed;<br />
• Weighted average emission factor (if the option is chosen instead of<br />
CM calculation): The same data requirements as the average OM of<br />
ACM0002. But the data of the year in which project generation occurs<br />
must be used;<br />
• Data required to recalculate the OM emission factor (if ex-post calculation<br />
is chosen);<br />
• Data required to recalculate the BM emission factor (if ex-post calculation<br />
is chosen); and<br />
• Additional data is required for biomass power projects: The amount of<br />
biomass and fossil (if any) fuel input shall be monitored by fuel type.<br />
Monitoring under a PoA:<br />
• Number of the distributed and scrapped equipment; and<br />
• Additional data is required for biomass power projects following the<br />
general guidance for leakage in small-scale biomass project activities or<br />
the procedures given in AM0042.<br />
5.2.4 AM0029<br />
Project Description<br />
Greenfield Gas<br />
Power Plants<br />
Need for sufficient<br />
Gas Availability<br />
AM0029 is a methodology for greenfield natural-gas-fired grid-connected<br />
power generation projects. After the methodology approval in May 2006,<br />
AM0029 has been repeatedly applied. By September 2007, the number of<br />
AM0029 projects reached 25, most of which were estimated to generate<br />
a large amount of CERs (500 – 3,200 kt CO 2<br />
p.a.). All these projects were<br />
based in China and India.<br />
Applicability Conditions<br />
AM0029 (version 1) is applicable to projects that construct and operate<br />
a new natural-gas-fired grid-connected power generation plant. The<br />
geographic/ physical boundaries of the baseline grid shall be clearly identified<br />
and information pertaining to the grid and estimating baseline emissions<br />
must be publicly available. In addition, natural gas must be sufficiently<br />
available in the region or country.<br />
58