09.02.2014 Views

Understanding CDM Methodologies - SuSanA

Understanding CDM Methodologies - SuSanA

Understanding CDM Methodologies - SuSanA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Applicability Conditions<br />

Grid has to have<br />

at least one Fossil<br />

Power Plant<br />

Interpretation of<br />

15 MW Threshold<br />

Addition<br />

is counted<br />

separately<br />

Retrofit cannot<br />

increase Capacity<br />

beyond Threshold<br />

AMS-I.D (version 12) is applicable to grid-connected renewable power<br />

generation projects (e.g. PV, hydro, tidal, wave, wind, geothermal and<br />

renewable biomass) that supply power to and/or displace power from a<br />

power distribution system that is or would have been supplied by at least one<br />

fossil-fuel-fired generation unit. Combined heat and power systems are not<br />

eligible under this category. The eligibility limit of 15 MW for a small-scale<br />

<strong>CDM</strong> projects applies as follows:<br />

• If the units added have both renewable and non-renewable components,<br />

the capacity of the renewable component shall not exceed 15 MW;<br />

• If the unit added is co-fired with fossil fuel, the capacity of the entire unit<br />

shall not exceed 15 MW;<br />

• In the case of projects that involve the addition of renewable power<br />

generation units at an existing renewable power generation facility, the<br />

capacity of the added units by the project shall not exceed 15 MW; or<br />

• In the case of projects that seek to retrofit or modify an existing renewable<br />

power generation facility, the total capacity of the modified or retrofitted<br />

unit shall not exceed 15 MW.<br />

Box 19: Application of the 15 MW threshold for retrofit/ expansion<br />

projects<br />

AMS-I.D originally stipulated that “to qualify as a small-scale <strong>CDM</strong> project activity,<br />

the aggregate installed capacity after adding the new units should be lower<br />

than 15 MW”. Several requests were made to revise the applicability condition<br />

so that the 15 MW threshold applies to the power generation capacity added<br />

to the facility, but not to the aggregate capacity 241 . EB28 decided to revise AMS-<br />

I.D (version 09) to clarify that “in the case of project activities that involve the<br />

addition of renewable energy units at an existing renewable power generation<br />

facility, the added capacity of the units added by the project should be lower than<br />

15 MW and should be physically distinct from the existing units.”<br />

PoA Bundling<br />

Applicability only<br />

for Biomass<br />

Count CO 2<br />

Emissions only,<br />

not other Gases<br />

Applicability conditions under a Programme of Activities (PoA): In<br />

case of a small-scale PoA where the limit of the entire PoA exceeds the limit<br />

for small-scale <strong>CDM</strong> project activities described above, the applicability of<br />

the methodology is limited to small-scale <strong>CDM</strong> Programme Activities (CPAs)<br />

that use either biomass residues only or biomass from dedicated plantations<br />

complying with the applicability conditions of AM 0042.<br />

Project Boundary<br />

The spatial extent of the project encompasses the physical, geographical site<br />

of the renewable generation source. Within the project boundary, project<br />

participants shall only account for CO 2<br />

emissions from fossil-fuel-fired<br />

power generation that is displaced due to the project. As explained above,<br />

additional emission sources are to be considered for hydropower and biomass<br />

power projects (and possibly geothermal power projects).<br />

241<br />

See e.g. SSC_043, SSC_050.<br />

55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!