09.02.2014 Views

progress and the latest research news and on occupational ... - Irsst

progress and the latest research news and on occupational ... - Irsst

progress and the latest research news and on occupational ... - Irsst

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Michel Arsenault, President of <str<strong>on</strong>g>the</str<strong>on</strong>g> FTQ, Marie Larue, President <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

CEO of <str<strong>on</strong>g>the</str<strong>on</strong>g> IRSST, Yves-Thomas Dorval, President of <str<strong>on</strong>g>the</str<strong>on</strong>g> C<strong>on</strong>seil<br />

du patr<strong>on</strong>at<br />

A NEW LABORATORY<br />

The Noise <str<strong>on</strong>g>and</str<strong>on</strong>g> Vibrati<strong>on</strong> field gained a state-of-<str<strong>on</strong>g>the</str<strong>on</strong>g>-art acoustic laboratory. Inaugurated by <str<strong>on</strong>g>the</str<strong>on</strong>g> members of <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

IRSST’s Board of Directors in March 2011, this unique laboratory, located in M<strong>on</strong>treal, has been dubbed ICAR,<br />

an acr<strong>on</strong>ym for <str<strong>on</strong>g>the</str<strong>on</strong>g> French descripti<strong>on</strong> (infrastructure commune en acoustique pour la recherche) of this shared<br />

acoustic <str<strong>on</strong>g>research</str<strong>on</strong>g> infrastructure.<br />

It was built <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> campus of M<strong>on</strong>tréal’s École de technologie supérieure (ÉTS), a partner of this project, which also benefited<br />

from a financial c<strong>on</strong>tributi<strong>on</strong> from Canada Ec<strong>on</strong>omic Development. Am<strong>on</strong>g o<str<strong>on</strong>g>the</str<strong>on</strong>g>r things, ICAR includes a semi-anechoic room<br />

c<strong>on</strong>nected to a reverberant room, providing all <str<strong>on</strong>g>the</str<strong>on</strong>g> equipment necessary for studies <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>trol or eliminati<strong>on</strong> of noise<br />

for more effective preventi<strong>on</strong> of occupati<strong>on</strong>al deafness <str<strong>on</strong>g>and</str<strong>on</strong>g> of <str<strong>on</strong>g>the</str<strong>on</strong>g> accident risks related to communicating in noisy work<br />

envir<strong>on</strong>ments.<br />

With this infrastructure, <str<strong>on</strong>g>research</str<strong>on</strong>g>ers can:<br />

J take measurements to characterize sources of noise in<br />

terms of <str<strong>on</strong>g>the</str<strong>on</strong>g>ir noise emissi<strong>on</strong> levels<br />

J characterize acoustic materials in terms of <str<strong>on</strong>g>the</str<strong>on</strong>g>ir sound<br />

absorpti<strong>on</strong> capacity<br />

J evaluate <str<strong>on</strong>g>the</str<strong>on</strong>g> performance of hearing protectors<br />

J perform auditory tests <strong>on</strong> human subjects in a very<br />

silent envir<strong>on</strong>ment<br />

J use <str<strong>on</strong>g>the</str<strong>on</strong>g> acoustic intensimetric cartography system<br />

to characterize a structure’s capacity to reduce noise<br />

transmissi<strong>on</strong>, am<strong>on</strong>g o<str<strong>on</strong>g>the</str<strong>on</strong>g>r things.<br />

Not <strong>on</strong>ly will ICAR meet <str<strong>on</strong>g>research</str<strong>on</strong>g>ers’ needs, but it will also<br />

benefit <str<strong>on</strong>g>the</str<strong>on</strong>g> entire occupati<strong>on</strong>al health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety network,<br />

as well as Québec manufacturers involved in partnership<br />

projects or requests for expertise. In additi<strong>on</strong>, this project<br />

clearly illustrates <str<strong>on</strong>g>the</str<strong>on</strong>g> solid links between <str<strong>on</strong>g>the</str<strong>on</strong>g> IRSST <str<strong>on</strong>g>and</str<strong>on</strong>g> its<br />

partner, <str<strong>on</strong>g>the</str<strong>on</strong>g> ÉTS.<br />

The reverberant room of <str<strong>on</strong>g>the</str<strong>on</strong>g> ICAR laboratory<br />

IRSST — 2011 ACTIVITY REPORT IRSST — 2011 ACTIVITY REPORT 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!