<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

Topic<br />

Key Mitigation and Enhancement Measures<br />

are noted, these will be recorded, suitable action identified and undertaken within a suitable timeframe.<br />

Waste Management<br />

The production of waste will be minimised throughout the works, including wastes from peat and this has been taken into account in the<br />

design process to avoid where possible areas of deeper peat. Where waste is generated, this will be reused and recycled where<br />

possible.<br />

A Site Waste Management Plan (SWMP) will be produced to address the management of waste streams. The SWMP will address the<br />

following issues:<br />

• Waste Minimisation;<br />

• Separation of Waste at Source;<br />

• Appropriate Storage and Disposal of Waste taking account of stability and pollution prevention;<br />

• Management of peat, Superficial Deposits and Bedrock;<br />

• Re-use of peat where possible on site (Consultation with SEPA will be required <strong>for</strong> any intended re-use of peat on the site.);<br />

• Management of Waste Oils;<br />

• Recommendations <strong>for</strong> Inspection and Maintenance.<br />

Environmental Monitoring<br />

A groundwater and surface water monitoring programme will be implemented to obtain baseline data, as well as data during<br />

construction works. The scope will be agreed with SEPA and Stirling Council prior to implementation.<br />

Surface Water<br />

A surface water monitoring network will be established a minimum of six months prior to construction works.<br />

In addition to surface water monitoring, regular visual inspection of surface water management features such as drainage pipes and<br />

receiving watercourses will be carried out in order to establish whether there are increased levels of suspended sediment, erosion or<br />

deposition. It is likely that there will be an ongoing need to maintain these structures, <strong>for</strong> example by the removal of debris, to ensure<br />

they continue to function as designed.<br />

Regular visual inspection of watercourses will also be required during construction and decommissioning stages, particularly during<br />

periods of high rainfall but also during low flow conditions, in order to establish that levels of suspended solids have not been<br />

significantly increased by on-site activities.<br />

Monitoring Ground Movement<br />

As the access tracks are being constructed, the appearance of the track and surrounding land will be monitored <strong>for</strong> increased rate of<br />

sinking or tilting or a rise in water levels.<br />

March 2013 16-40 ES Chapter 16<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©<br />

Summary of Effects and Mitigation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!