07.02.2014 Views

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

Receptor<br />

Effect<br />

Development<br />

Phase<br />

Sensitivity/<br />

Importance of<br />

Receptor<br />

Magnitude of<br />

Change<br />

Level of Effect<br />

(and<br />

Significance)<br />

Prior to<br />

Mitigation<br />

Mitigation<br />

Enhancement<br />

Level of Effect<br />

andSignificance<br />

after Mitigation<br />

Nature of<br />

Effect<br />

Tourism<br />

Tourist<br />

Accomodatio<br />

n (Visitor<br />

Numbers).<br />

Operational<br />

phase.<br />

Low: There are<br />

a very few<br />

tourism<br />

accommodation<br />

providers in<br />

close proximity<br />

of the proposed<br />

wind farm <strong>for</strong><br />

the proposal to<br />

potentially<br />

result in a<br />

detectable<br />

change to<br />

visitor numbers<br />

and the<br />

economy of the<br />

area in general.<br />

Small: The number<br />

of people who feel<br />

strongly enough<br />

about wind farms<br />

that it would<br />

influence their<br />

holiday destination<br />

is likely to be very<br />

small.<br />

Slight<br />

(not significant)<br />

- -<br />

Slight<br />

(not significant)<br />

Negative: Some<br />

visitors may be<br />

deterred by<br />

visual effects.<br />

Recreation<br />

and outdoor<br />

access<br />

Outdoor<br />

Access (on<br />

site).<br />

Construction and<br />

decommissiong<br />

phases.<br />

Low: The site is<br />

currently not<br />

considered to<br />

be well used <strong>for</strong><br />

public access.<br />

Small: Loss of<br />

access would only<br />

be <strong>for</strong> a short<br />

temporary period<br />

and already<br />

commonly occurs<br />

during <strong>for</strong>estry<br />

harvesting and<br />

restocking<br />

operations.<br />

Slight / negligible<br />

(not significant)<br />

Where<br />

possible a<br />

suitable<br />

diversion<br />

would be<br />

put in place<br />

along with<br />

the display<br />

of signage<br />

at each<br />

end of the<br />

track<br />

where the<br />

track is<br />

diverted.<br />

-<br />

Slight / negligible<br />

(not significant)<br />

Negative: Loss<br />

of public access<br />

on site.<br />

March 2013 16-31 ES Chapter 16<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©<br />

Summary of Effects and Mitigation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!